Information Notice 1985-78, Event Notification

From kanterella
Jump to navigation Jump to search
Event Notification
ML031180324
Person / Time
Site: Beaver Valley, Millstone, Hatch, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, 05000262, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill, Crane
Issue date: 09/23/1985
From: Jordan E
NRC/IE
To:
References
IN-85-078, NUDOCS 8509190432
Download: ML031180324 (5)


SSINS No.:

6835 IN 85-78

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

WASHINGTON, D.C.

20555

September 23, 1985

IE INFORMATION NOTICE NO. 85-78:

EVENT NOTIFICATION

Addressees

All nuclear power reactor facilities holding an operating license (OL) or a

construction permit (CP).

Purpose

s:

This notice is being issued to revise guidance to power reactor licensees

regarding specific event notification information that should be provided to

the NRC Operations Center when reporting events in accordance with

10 CFR 50.72. This guidance supercedes that provided in IN 83-34 dated May 26,

1983.

Suggestions contained in this information notice do not constitute NRC

requirements; therefore, no specific action or written response is required.

Description of Circumstances

Significant events reported to the NRC Operations Center receive prompt

evaluation by NRC technical staff at headquarters and regional offices. To

assist in obtaining adequate information for evaluation, the worksheet has been

revised for the Operations Officers manning the NRC Operations Center.

The

event notification worksheet has been provided for your information as an

attachment to this information notice.

We recognize that this list is not all

inclusive, nor are all of its items applicable to each event.

Rather, it lists

certain key items on the basis of past experience that are required for most

notifications. The checklist is intended to provide the licensee with the type

of information that should be provided to the NRC Operations Center when

reporting events.

It is suggested that copies of the worksheet be made available to employees

responsible for reporting event related information to the NRC to replace

copies of the worksheet provided in IN 83-34.

To prevent misunderstandings and reduce callbacks by the Operations Officer

as a result of incomplete information, the description should provide sufficient

detail for the Operations Officer to understand the event, including all system

interactions.

The NRC welcomes any recommendations for improvements to the event reporting

process.

8509190432

IE 85-78 September 23, 1985 No specific action or written response is required by this information notice.

If you have any questions regarding this matter, please contact the Regional

Administrator of the appropriate NRC regional office or the NRC Headquarters

incident response contacts listed in this notice.

Xwa

Jordn Director

Div isi

of Emergency Preparedness

and Lngineering Response

Office of Inspection and Enforcement

Technical Contacts:

Don Marksberry, IE

(301) 492-4156

Ray Priebe, IE

(301) 492-4333 Attachments:

1. Event Notification Worksheet

2. List of Recently Issued IE Information Notices

Attacrment I

IN 85-78

1 U .S.

NUCLAA xrtCuumgr COMKriSSZ0N

oprimrzoNs Cc"T£

I

EVENT NOTIFICATION WORKSHEET

September 23, 1985

Page I of 21 vnTzrICA7tIC JflrE I rACIrI

OR ORGANItZATION

UNIT

CALLERS NAMKE

TELrPHONE NUMSER (ror c JJ backJ

CVENT CLASSIFICATION

Y

N

EVENT CATEGORY

_

NITIATZON SIGNAL

CAUSE OF FAILURE

ErvrRAL EMERGcNrCY

REACTOR TRIP/SCRAM

MECHNICAL

SlrE AREA EMERCRNCr

rsr

ACTUATION

_

LECTRICAL

I

ALT'RT

ECCS ACsUATIoN

peRSONNEL

ERROR

UNUSUAL

EVENT

SArFTY rrrrCTION FLW

_

PROCCDURE IADOVACr

0.72 N-rLCO

ACTION STATEMENT

O'flER,

JSE URIT SArEGUARDS

OT7HR

TRANSPORTATION EVENT

SYSTEM:

EVENT TINrE

ZONE

EVENT

mavril

DAr

_ O.HER:

'

.

COMPONrrNT:

IL

DATE

EVENT DESCRIPTION

POW.ER PP.'OR JO rvEhJ

()l

Did

all systegws function

as r.quirrd ?

Zf No, Explain

abeve.

I

C:;RES? PrrR-OR AMODE

I Anthinq

unusual or not understood ? I

NO

I

' YES, rxrpJa.n Dove.

I

I

OUSIZDZ AGENCY OR PERSOSNEL

CT:r:ED BY LICEN:SEE

.::rvsJ

I: : -

rs:es

r

LL E

_, _::rF

I:

C

CORRECTIVE ACT!OIMS)

Nc-r or OrEPATIOP.'

?fl

CORRECTION':

I

rs.:A-'

E-?r TO RES-AR7:

lII

l P;LScS 7-LEASE

ISI

I ADDISONAL INFORY.ATICN ON SACK

I

Attachnient 1

IN 85-78

.

ADDITIONAL INFORMATION FOR RADIOLOGICAL RELEASES peptem er I3,

1985

-j 41

'-

UVI

C

LQUID RELEASE

l

PLANNED

SOURCE(S)

GASEOLS RELEASE

UNPLANNED

RELEASE RATE (Ci/sec) :

EST TOTAL ACTIVITY

WCi):

RELEASE DURATION

EST TOTAL IODINE

(Ci):

r.s. LIMITS

CGRAS SAMPLE

.

-

XONITOR READING

Areas evacuated ?

Y

N

List below.

Personnel exposed/contaminated

Y

N

Describe below

Plant Health Physics backup requested ?

Y

N]

Note: Only if T.S. exceeded or actual contamination

ADDITIONAL INFORMATION

ADDITIONAL INFORMATION FOR REACTOR COOLANT or STEAM GENERATOR TUBE LEAKS

SUDDEN OR LONG TER.

DEVELOPMENT ?

START DATE.:

START TIME

PRIMARY COOLANT

LEAK RVTE

ACTIVITY:

MONITOR READINGS

LEAK YS LU.E :SECONDARY

COOLANT

CONDENSER

T.S. LIMITS:

MAIN STM LINE

SG BLOWDOWN

LIS7 OF SArETY RELATED EQUIPMENT NOT OPERATIONAL

SPECIAL ACTIONS TAYEN BY LICENSEE (If

any)

I

I

- Attachment 2 IN 85-78

September 23, 1985

LIST OF RECENTLY ISSUED

IE INFORMATION NOTICES

Information

Date of

Notice No.

Subject

Issue

Issued to

85-77

85-76

85-75

85-74

84-70

Sup. 1

85-73

85-72

85-71

Possible Loss Of Emergency

Notification System Due To

Loss Of AC Power

Recent Water Hammer Events

Improperly Installed Instru- mentation, Inadequate Quality

Control And Inadequate Post- modification Testing

Station Battery Problems

Reliance On Water Level

Instrumentation With A

Common Reference Leg

Emergency Diesel Generator

Control Circuit Logic Design

Error

Uncontrolled Leakage Of

Reactor Coolant Outside

Containment

Containment Integrated Leak

Rate Tests

Teletherapy Unit Full

Calibration And Qualified

Expert Requirements (10 CFR

35.23 And 10 CFR 35.24)

Recent Felony Conviction For

Cheating On Reactor Operator

Requalification Tests

9/20/85

9/19/85

8/30/85

8/29/85

All power reactor

facilities holding

an OL or CP

All power reactor

facilities holding

an OL or CP

All power reactor

facilities holding

an OL or CP

All power reactor

facilities holding

an OL or CP

8/26/85

All power reactor

facilities holding

an OL or CP

8/23/85

8/22/85

8/22/85

8/15/85

8/15/85

All power reactor

facilities holding

an OL or CP

All power reactor

facilities holding

an OL or CP

All power reactor

facilities holding

an OL or CP

All material

licensees

All power reactor

facilities holding

an OL or CP

85-70

85-69 OL = Operating License

CP = Construction Permit