March 04, 2025

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - FIRE PROTECTION TEAM INSPECTION REPORT 05000528/2025011 AND 05000529/2025011 AND 05000530/2025011

Dear Adam C. Heflin:

On February 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station and discussed the results of this inspection with Katherine Gil, Director, Nuclear Regulatory Affairs and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Gregory G. Warnick, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000528; 05000529; 05000530 License Nos. NPF-41; NPF-51; NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528; 05000529; 05000530

License Numbers:

NPF-41; NPF-51; NPF-74

Report Numbers:

05000528/2025011; 05000529/2025011; 05000530/2025011

Enterprise Identifier:

I-2025-011-0002

Licensee:

Arizona Public Service

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

January 27 to February 13, 2025

Inspectors:

S. Makor, Senior Reactor Inspector

N. Okonkwo, Reactor Inspector

G. Pick, Senior Reactor Inspector

Approved By:

Gregory G. Warnick, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1)switchgear and battery rooms (zone TB-4), turbine building, elevation 100

(2) DC equipment room - train A, channel A (zone 7A) control building, elevation 100 (3)auxiliary feedwater system, zone 72 & TB-3 (4)gaseous fire extinguishing systems, computer room (zone 16), control building, elevation 140

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees fire protection program (FPP) contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1)review fire protection training program (2)review fire protection operating experience program

Fire Protection Program Changes/Modifications (IP Section 03.03) (3 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the updated final safety analysis report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire safe shutdown (SSD) operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) Engineering Change DEC-16-15266- 004, "Pressurizer Spray Valve"
(2) Engineering Change DEC-17-04380- 004, "Fire Protection Drain Line Modification"
(3) Engineering Change DEC-00410, "RCP Motor Replacement"

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 13, 2025, the inspectors presented the fire protection team inspection results to Katherine Gil, Director, Nuclear Regulatory Affairs and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

13-EC-PK-0204

Hydrogen Generation Calculation for Class IE Station

Batteries - GNB model NCN-33

13-MC-FP-0803

Combustible Loading Calculation for Control Building

13-MC-FP-821

Halon-1301 Fire Protection System for Remote Shutdown

Rooms - Train A and Train B

13-MC-ZA-0808

Calc for MSSS Flooding at Elevation 81'

Calculations

13-MC-ZJ-0200

AS Built Control Building Flooding Calculation

Corrective Action

Documents

CR

16-00686, 21-11895, 21-11896, 22-01219, 22-07832,

2-08881, 22-10502, 22-13140, 23-00426, 23-10757,

24-03262, 24-05075, 24-05273, 24-13271, 23-06635,

21-08588, 18-12590, 23-04338

Corrective Action

Documents

Resulting from

Inspection

CR

25-00937, 25-00981, 25-00982, 25-00983, 25-00984,

25-00986, 25-01000, 25-01079, 25-01081,

Markups for flow through buildings and around the

underground loop

01-M-FPP-002,

sheet 1

Fire Protection System

01-M-FPP-003

Fire Protection System

01-M-FPP-004

Fire Protection System (CO2 System)

01-M-FPP-006

Fire Protection System

01-M-RCP-003

Reactor Coolant System Lube Oil Collection System

13-A-ZYD-022

Fire Protection Containment Bldg. Floor Plan at EL 55-0

13-A-ZYD-027

Fire Protection Turbine Building Floor Plan at Elevation

100-0 Level0

13-A-ZYD-029

Fire Protection Control Building Floor Plan at Elevation

100'-0", Level 1, sheet 2

13-A-ZYD-029

Fire Protection Control Building Floor Plan at Elevation

20'-0", Level 2, sheet 3

71111.21N.05

Drawings

13-A-ZYD-029

Fire Protection Control Building Floor Plan at Elevation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

140'-0", Level 3, sheet 4

13-A-ZYD-029

Fire Protection Control Building Floor Plan at Elevation

140'-0", Level 4, sheet 5

13-C-ZVA-011

Fire Protection System General Arrangement

A-E-NGB-004

Elementary Diagram 480V Non-Class 1E Power System,

Load Center A-E-NGN-L41 & L42, 480 V Main Feeder

Breakers

A-E-NGF-004,

Sh. 2

Control Wiring Diagram 480V Non-Class 1E Power

System, Load Center A-E-NGN-L41, 480 V Main Feeder

Breakers

A0-E-NGA-001

Single Line 480 V Non-Class IE power system load

Center AE-NGN-L41

A0-E-NGA-009

Single Line 480 V Non-Class IE power system load

Center AE-NGN-L49

A0-E-NHA-003

Single Line Diagram 480V Non-Class 1E Power System,

Motor Control Center AE-NHN-M53

E017 00251

LC41 Connection Diagram Transformer Windings

E017 00251

Connection Diagram for Winding Temp. Indicator Type LC

Transformer

M650-00647

Main Steam Support Structure Feed Water Pre-Action

Sprinkler Piping

M652-00059

Detector Wiring Diagram

DEC 16-15266

Spray Valve Positioner Replacement with Digital DVCs

DEC 17-04380-

004

FP Permanent Drain Line Modification

Engineering

Changes

DEC-00410

RCP Motor Replacement and Enhancement Equivalency

19-10825-002

Justify Use of Temperature Indication to Identify Liquid

Level in Halon Bottles

8/15/2019

Engineering

Evaluations

2-03027-002

Fire Hose Evaluation

5/4/2022

Encasement on Ends of Battery Packs

N/A

Battery Room D Detection Key-Legend

N/A

No Hydrogen Monitoring - Battery Rooms

N/A

Pre-fire strategies

Miscellaneous

No Hydrogen Monitoring - Battery Rooms Response

N/A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

13-MM-658

Specification for Fire Protection Halon 1301 System

13-NS-C088

Mission Times Operability determinations for the EW, SP,

SI, AF, and DG systems

23-10855-001

Level 4 Evaluation Operating Experience (OE) 559337

(Watts Bar 2 - Missing Fire Barrier)

24-02030-001

Operating Experience Related to Fire Events at

Decommissioning Nuclear Power Plants in the United

States

3/5/2024

24-03262-001

Stars Regulatory OE: Wolf Creek Greek NCV: Failure to

Maintain Fire Protection Compensatory Measures During

Control Room Ventilation Isolation Signal Actuation

4/5/2024

24-03264-001

STARS Regulatory OE: Callaway Green NCV: Failure to

Maintain Fire Door Closed or Implement Fire Watch

4/5/2024

24-08440-001

STARS Regulatory OE: Wolf Creek NCV: Failure to

Maintain Surveillance Testing Procedure in Accordance

with the Fire Protection Program

8/14/2024

24-11314-001

Level 4 Business Review Evaluation

10/21/2024

50.59 Screening

95-00197

Revise FP Halon System surveillance procedure 14FT-

9FP-09 & UFSAR 9B.3-1

6/22/1996

FP

Fire Protection - Design Basis Manual

FPCRR

DEC 18-13957-003 R4 and EDC 2023-00452 (ZT-1749

Online Condition Monitoring Equipment Installation, Units

1, 2, and 3)

9/10/2024

FPCRR

EE 21-13516-003 and PCP 5564384

10/18/2023

FPCRR

TAPA for 14FT-0FP04, Annual Fire Water Loop Test, Rev

26a

7/5/2023

FPCRR

EC 22-13057-002 R0 (including FCR-APS-2024-0773)

and EDC 2024-00037 (SMP Phase 3)

2/13/2024

FPD01-00-001

Initial Fire Team Member Qual Card

11/1/2018

MA Q2-2024 (2-1-

24_7-31-24)

System Health Report (SHR) MA System for 2025 FP TRI

annual Inspection

1/16/2025

NA Q2-2024 (2-1-

24_7-31-24)

System Health Report (SHR) NA System for 2025 FP TRI

annual Inspection

1/16/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NKASMC071210

Licensed Operator Initial Training Classroom Lesson

2/24/2020

NPL66-L-0031-24

Palo Verde Nuclear Generating Station Fire Department

24 1st Quarter Training

1/26/2024

NPL67-L-0030-23

Palo Verde Generating Station Fire Department 2024 2nd

Quarter Training

5/8/2024

SDOC M660-

00084

Electric Motor Data A-M-FPP03 N-for Jockey Pump Motor

2/2/1993

VTD-E930-00006

Vendor Manual for Z-lights Vendor Manual for Phillips

Light Guard Vectra Series Emergency Light

4/26/2021

01DP-0AP12

Condition Reporting Process

01DP-0AP12-01

Condition Reporting Process Administrative Guideline

13-A-ZYD-0022

Fire Protection Containment Bldg. Floor Plan at EL 55-0

13-MS-A83

NFPA Code Applicability and Conformance Review

14DP-0FP38

Fire Protection Test Program

14DP-0FP46

Fire Protection Program Impact Screening

14DP-0TR01

Fire Department Training Program Description

14DP-0TR02

Fire Department Training Program Administration

14FT-0FP04

Annual Fire Water Loop Test

14FT-0FP05

Monthly Diesel Driven Fire Pump Start and Run

14FT-9FP08

CO2 Fire Suppression System Functional Test

14FT-9FP09

Halon Cylinder Liquid Level and Pressure (License and

Non-license Commitment)

14FT-9FP10

Halon Fire Suppression System Functional Test

14FT-9FP22

Halon System Inspection

14FT-9FP23

Fire Suppression Water System Flow Test

2MT-9ZZ92

Inspection/Cleaning of 1E and Non-1E 480 Volt Load

33FT-9FP01

Appendix R and Technical Requirements Manual Fire

Damper Surveillance

Procedures

33FT-9FP04

Appendix A Fire Damper Surveillance Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

37TI-9ZZ01

Infrared Thermography Inspection of Plant Components

37TI-9ZZ01

Infrared Thermography Inspection of Plant component

40AO-9ZZ19

Control Room Fire

40DP-9OP35

Operations Interface

81DP-0CC15

Engineering Work Orders and Evaluations

81DP-0CC28

Classification of Structures, Systems, and Components

87DP-0CC17

Control of Engineering Data in SWMS

87DP-0MC06

Item Equivalency Evaluation (IEE)

NISP-EN-02

Standard Item Equivalency Process (EO-18-EG-01)

NNI01C073704

Non-Licensed Operator Initial Training

7/26/2024

Work Orders

WO

5336792-0, 5375830-0, 5456727-0, 5540778-0,

5569443-0, 5569444-0, 4782660, 2803240, 5395840,

5395838, 5430733, 5459108, 5562435, 2555776