IR 05000491/1979015

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-491/79-15,50-492/79-15 & 50-493/79-15 on 790823-24.No Noncompliance Noted
ML19275A667
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 09/10/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19275A665 List:
References
NUDOCS 7910180092
Download: ML19275A667 (2)


Text

.

,

'o UNITED STATES

-

l'

g NUCLEAR REGULATORY COMMISSION n

.

g c

REGION 11

.:

o,,

'f 101 MARIETTA ST Pe.W SulTE 3100 b

%

o ATLANTA, G EORGIA 3o3o3 In Reply Refer To:

RII:JKR M, gg 50-491/79-15 50-492/79-15 50-493/79-15

%

Duke Power Company Attn:

L. C. Dail, Vice President Design Engineering Post Office Box 33189 Charlotte, North Carolina 28242 Gentlemen:

This refers to the inspection conducted by J. K. Rausch of this office on August 23-24, 1979 of activities authorized by NRC Construction Permit Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and to the discussion of our findings held with J. W.

Willis at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in tt.e enclosed inspection report. Within these areas, the inspection consisted of select.ive examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any udorciation that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such alplication must include a full statement of the reasons on the basis of which it is claimed tnat the information is propriet.ary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

.

1184 332 7D10180 o M

.

.

.

Duke Power Company-2-

.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, C. E. Murphy, Chief Reector Construction and Engineering Support Branch Enclosures:

Inspection Report Nos. 50-491/79-15, 50-492/79-15 and 50-493/79-15 cc w/ enclosures:

J. T. Moore, Project Manager Post Office Box 422 Gaffney, South Carolina 29340

,

e