IR 05000482/1978013
| ML19270G149 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 04/26/1979 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Koester G KANSAS GAS & ELECTRIC CO. |
| Shared Package | |
| ML19270G150 | List: |
| References | |
| NUDOCS 7906050056 | |
| Download: ML19270G149 (1) | |
Text
7 4B 6 e* * 8 %g UNITE D STATES o
NUCLE AR REGULATORY COMMISSION 35%.\\
n
REGION IV
I
$
611 RYAN PLAZA DRIVE,SulTE 1000
- -
!
ARLINGTON, TEXAS 76011 o
,/
%
..s 9 *****
April 26, 1979 In Reply Refer To:
RIV
,
Docket tio. STfl 50-482/Rpt. 78-13 Kansas Gas and Electric Company ATTit:
Mr. Glenn L. Koester Vice President-0perations Post Office Box 208 Wichita, Kansas 67201 Gentlemen:
Thank you for your letter of March 22, 1979, in response to our letter dated February 16, 1979, and the attached flotice of Violation.
As a result of our review, we find that additional information is needed.
Specifically, in your response to finding flo. 4, " Failure to Complete User Tests Within Time Limits," you indicated that your constructor (DIC)
and AE (Bechtel) regard the time limits of ASTM C-150 (paragraph 10-1977 edition) as a minimum, and you indicate that no violation (of procedures)
has occurred. Since it is our position that the time limitations for testing are clearly stated in ASTM C-150, please provide the basis for your interpretation.
.
Sincerely,
_
s
-
.
_-
,
W.C.Seidh, Chief Reactor Construction and Engineering Support Branch
.