IR 05000445/2020411

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000445/2020411 and 05000446/2020411
ML20190A236
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/09/2020
From: Ray Kellar
Plant Support Branch-1
To: Peters K
Vistra Operations Company
References
IR 2020411
Download: ML20190A236 (7)


Text

July 9, 2020

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000445/2020411 AND 05000446/2020411

Dear Mr. Peters:

On June 18, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000445 and 05000446

License Numbers:

NPF-87 and NPF-89

Report Numbers:

05000445/2020411 and 05000446/2020411

Enterprise Identifier: I-2020-411-0004

Licensee:

Vistra Operations Company LLC

Facility:

Comanche Peak Nuclear Power Plant, Units 1 and 2

Location:

Glen Rose, Texas

Inspection Dates:

June 15, 2020 to June 19, 2020

Inspectors:

J. Buchanan, Physical Security Inspector

A. Meyen, Physical Security Inspector

Approved By:

Ray L. Kellar, Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: all requirements
  • Tier II: all requirements
  • Tier III: all requirements

71130.07 - Security Training

Security Training (1 Sample)

(1)

  • Tier I: all requirements
  • Tier II: all requirements
  • Tier III: all requirements except 02.14a, b

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 18, 2020, the inspectors presented the EXIT MEETING inspection results to Mr. T. McCool, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

CR-2019-008686, CR-2019-008686, CR-2020-003043, CR-

20-003903, CR-2020-004172, IR-2020-04212, IR-2020-

004595, TR-2019-005108, TR-2019-005220, TR-2019-

008852, TR-2020-000295, TR-2020-000470, TR-2020-

001562, TR-2020-002436, TR-2020-002678, TR-2020-

2694, TR-2020-003036, TR-2020-003293, TR-2020-

003519, TR-2020-003670, TR-2020-003730, TR-2020-

003746, TR-2020-003905, TR-2020-004010, TR-2020-

004023, TR-2020-004595

Miscellaneous

Active IR Intrusion Detection System Site Acceptance Test

07/15/2019

Alarm/Event Conditions Reports

06/17/2020

Comanche Peak Nuclear Power Plant Firearms

Inspection/Function Log

2019

Comanche Peak Nuclear Power Plant Units 1 and 2 Security

Plan

Fiber Optic Sensor Intrusion Detection System Site

Acceptance Test

07/08/2019

Glasses Hearing Aids Report

06/17/2020

Job Aid Pop-Ups Testing

Job Aid EntryScan 4

09/10/2019

Job Aid Itemiser 3

05/13/2020

Job Aid Mall Gate Testing

01/23/2012

Keyboard Command Report

06/17/2020

Reportability Job Aid

07/02/2018

Security Field Report 0110-20

Security Field Report 0171-20

Security Field Report 0179-20

Security Field Report 0193-20

Security Field Report 0208-20

Security Field Report 0335-19

Weapons Maintenance Log

2019

NILECJ-STD-

CEIA Metal Detectors

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0601

Procedures

1.0

Security Instruction Common Instructions

3.10

Security Instruction Alarm Stations

3.16

Security Instruction Portable Explosive Detector Searches

3.2

Security Instruction Access Control

SEC-102

Control of Security Plans, Procedures, Instructions, Job Aids

and Forms

SEC-506

Security Equipment and Firearms Testing and Observation

STI-421.02

Issue Report Reviews

Work Orders

405189, 3625020, 4927996, 5197061, 5398460, 5628696,

5656025, 5672324, 5732112, 5847991, 5877733, 5896323

71130.07

Corrective Action

Documents

2018-000241, 2018-003539, 2018-003541, 2018-003679,

2019-002682, 2019-002959, 2019-004788, 2019-004791,

20-001252, 2020-002160, 2020-004118

Miscellaneous

Armorer Certifications

Firearms Instructor Certifications

Security Training and Qualification Plan

ITD8.OJT.TT1

OJT Trainer/Evaluator

SC06.PFT.QRI

Physical Agility (PT) Test

SC21.DOC.CO6

Testing and Documentation

SC26.OJT.A14

Security Officer OJT

SC26.OJT.PTS

Security Officer Protective Strategy OJT

SC32.UOF.UOI

Use of Force Study Guide

SCD.FQR.TQR

Tactical Weapons Qualification

SCD.FRQ.DQR

Daylight Firearms Qualification

SCD.FRQ.NQR

Night Firearms Qualification

Procedures

SEC-103

Security Personnel Suitability and Qualification

SEC-104

Security Training and Qualification

SEC-125

Systematic Approach to Training

3