Cyber Security Inspection Report 05000445/2020401 and 05000446/2020401 (Cover Letter)
ML20153A493
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/01/2020
From: Nick Taylor
NRC/RGN-IV/DRS/EB-2
To: Peters K
Vistra Operations Company
References
IR 2020401
Preceding documents:
Download: ML20153A493 (3)


Text

June 1, 2020

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT - CYBER SECURITY INSPECTION REPORT 05000445/2020401 AND 05000446/2020401

Dear Mr. Peters:

On February 27, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2. On April 23, 2020, the NRC inspectors discussed the results of this inspection with Mr. T. McCool, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

Four findings of very low security significance (Green) are documented in this report. Each of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations consistent with Section 2.3.2 of the Enforcement Policy.

The following cross-cutting aspects were assigned to findings using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas: one [H.1] - Resources, one [H.13] -

Consistent Process, one [H.14] - Conservative Bias, and one [H.6] - Design Margins.

If you contest the violations or significance of these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Comanche Peak Nuclear Power Plant. In addition, if you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Comanche Peak Nuclear Power Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Nicholas Digitally signed by Nicholas H. Taylor H. Taylor Date: 2020.06.01 18:35:32 -05'00'

Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89 Non-Public Enclosure:

Inspection Report 05000445/20204001 and 05000446/2020401 cc w/o encl: Distribution via LISTSERV ML20153A493 (Cover letter)

ADAMS ACCESSION NUMBER: ML20153A465 (Cover letter w/enclosure)

Cover Letter Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE SRI:DRS/EB2 RI:EB2 C:DRPB C:EB2 NAME SGraves SAlferink NOKeefe/DLP for NTaylor DATE 5/27/2020 5/27/2020 5/29/20 6/1/2020