g U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-445/81-03; 50-446/81-03 Docket No. 50-445; 50-446 Category A2
'
Licensee: Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 Facility Name: Comanche Peak, Units 1 and 2 Inspection at: Comanche Peak Steam Electric Station, Glen Rose, Texas Inspection conducted:
February 23-25, 1981
~
Inspector:
3/ /
. R. Johnson, Reactor Inspector, Engineering & Materials Date
,
Section Jfd 8/
Approved:
- = e-W. A. Crossman, Chief, Projects Section No. 3 Date~
f 7/
f ' Hall, Acting Chief, Engineering & Materials Section R. E.
'Date Inspection Summary:
Insoection on February 23-25, 1981 (Recort No. 50-445/81-03 50 446/81-03)
Areas Insoected:
Routine, unannounced inspection of safety-related construction activities pertaining to installation, inspection and documentation of safety-related electrical and instrumentation cables.
The inspection involved twenty-four inspector-hours by one NRC inspector.
Results:
No violations or deviations were identified.
81042oog( ~
,
DETAILS
,
1.
Persons Contacted
-
Principal Licensee Personnel
- R. G. Tolson, TUGCO, Site QA Supervisor s
- J. T. Merrit, TUSI, Manage'r, Engineering and Construction
'
J. Ainsworth, TUGCO, Quality Engineering Supervisor
J. Lowry,1UGCO, Quality Engineer, Electrical C.' Osborne, TUGCO, Document Control Supervisor The IE inspector also interviewed other licensee and contractor personnel during the course of the inspection.
- Denotes those attending the exit interview.
2.
Safety-Related Electical Cables - Review of Ouality Records The IE inspector reviewed the quality related records relative to eleven Unit 1 installed alectrical Class IE cables and their respective terminations to ascertain that these records reflect work accomplishment consistent with established procedures to meet NRC requirements and licensee commitments.
The installation documentation was reviewed for quality aspects of such work accomplishment as: permissible bend radius, proper grounding, cable pulling, identification, and proper installation of termination components (lugs, connections and penetration splices).
The following documents were reviewed by the IE inspector:
a.
Inspection Reports ET 5955 ET 10910 l
EC 1162 EC 4300 E 11127G EC 6764 ET 8144 ET 8367 EC 5197 ET 9480 ET 9499 ET 2279 i
l ET 10113 EC 4198 EC 2755 ET 3437 i
!
!
l-2-l
-
.
-.
..
.
_ _
_
- _
_
.
,
ET 3447 EC 4404 ET 8989 ET 9043 EC 108 ET 5652 ET 8128 ET 4528 ET 4529
.
b.
Procedures QI-QP-ll.3-26.2 QI-QP-11.3-25.3 QI-QP-ll.3-26.6 QI-QP-11.3-28.9 No violations or deviations were identified.
3.
Safety-Related Instrumentation Cables - Review of Quality Records The IE inspector reviewed the quality related records relative to ten Unit 1 installed instrument cables and their respective terminations to ascertain whether these records reflect work accomplishment consistent with established procedures to meet NRC requirements and SAR commitments.
Of the ten cables selected, nine were selected from the Reactor Protection System (RPS) and one from the safety-related normal plant process and alarms.
The installation cocumentation was reviewed for quality aspects of such work accomplishment as: permissible bend radius, procer grounding, cable pulling, identification and proper installation of termination components (lugs, connections and penetration splices).
The following documents were reviewed by the IE inspector:
a.
Inspection Reoorts l
ET 5779 ES 3493 ET 5897 EC 3504 ET 8956 ET 4459 l
EC 3643 ET 4457 ET 7367 EC 3640 i
ET 5893 EC 3500-3-
i
--
.
ET 5717 ET 5659 EC 3873 ET 5777 EC 3498 ET 4201 ET 6687 EC 3520 EC 3649 ET 7373
Procedures QI-QP-il.3-26.2 QI-QP-ll.3-25.3 QI-QP-11.3-26.6 QI-QP-ll.3-28.9 c.
Raceway Schedule
,
Revision code in accordance with El-1700 No violations or deviations were identified.
4.
Exit Interview The IE inspector met with the licensee representatives (denoted in paragraph 1) and Mr. R. G. Taylor (NRC Resident Reactor Inspector)
l at the conclusion of the inspection on February 25, 1981.
The IE l
inspector summarized the purpose, scope and findings of the inspection, i
!