ML20003F279
| ML20003F279 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/06/1981 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20003F280 | List: |
| References | |
| NUDOCS 8104200505 | |
| Download: ML20003F279 (2) | |
See also: IR 05000445/1981003
Text
7ZG
/ A uk'o
3:
UNITED STATES
NUCLEAR REGULATORY COMMISSION
,
f
')*(
k
611 RYAN PLA A
IVE, SUITE 1000
% gf - j
ARUNGTON, TEXAS 76012
(-
/
March 6, 1981
I
In Reply Refer To:
%g
h
RIV
.9
Docket No. 50-445/Rpt. 81-03
<
//
/If
i
//
h
50-446/Rpt. 81-03
g,
4PR
,
t-
2 3jgg
N c.s.k,,g, [ U.
Texas Utilities Generating Company
ATTN: Mr. R. J. Gary, Executive Vice
F,
President and General Manager
c, % t
g
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Mr. A. R. Johnson of our staff
during the period February 23-25, 1981, of activities authorized by NRC
Construction Pennits No. CPPR-126 and 127 for the Comanche Peak facility,
Units No.1 and 2, and to the discussion of our findings with Mr. R. G. Tolson
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any infomation that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 25 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
8104200$05T
h
-.
--
-
--
.-
-
.
Texas Utilities Generating
Company
-2-
Itarch 6, 1981
Should you have any questions'concerning this inspection, we will be pleased
,
to discuss them with you.
,
Sincerely,
s
.
,[
'A
--
'd. C. Sei31e, Chief
Engineerinp3nspectio.^. Branch
Enclosure:
IE Inspection Report No. 50-445/81-03
50-446/81-03
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Sch:nidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201