IR 05000443-08-004; FPL Energy Seabrook, LLC; on 07-01-08 to 09-30-08; Seabrook Station, Unit No. 1, Integrated Inspection Report
ML083170052
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/12/2008
From: Arthur Burritt
Reactor Projects Branch 3
To: St.Pierre G
Florida Power & Light Energy Seabrook
BURRITT AL
References
IR-08-004
Download: ML083170052 (23)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 12, 2008

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - NRC INTEGRATED INSPECTION REPORT 05000443/2008004

Dear Mr. St. Pierre,

On September 30, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at Seabrook Station, Unit No. 1. The enclosed report documents the inspection findings discussed on October 1, 2008, with Mr. P. Freeman and other members of your staff.

These inspections examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

On the basis of the results of these inspections, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Leonard Cline Acting for/

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Docket No. 50-443 License No: NPF-86 Enclosure: Inspection Report No. 05000443/2008004 w/ Attachment: Supplemental Information