IR 05000443/2008007
| ML083310034 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 11/26/2008 |
| From: | Rogge J Engineering Region 1 Branch 3 |
| To: | St.Pierre G Florida Power & Light Energy Seabrook |
| References | |
| IR-08-007 | |
| Download: ML083310034 (5) | |
Text
November 26, 2008
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - NRC TEAM INSPECTION REPORT 05000443/2008007
Dear Mr. St. Pierre:
On October 23, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Seabrook Station Unit 1. The enclosed report documents the teams inspection results, which were discussed on October 23, 2008, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. No findings of safety significance were identified.
In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,
When separated from the Enclosure, this document is DECONTROLLED. G. S because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,
/RA/
John F. Rogge, Chief
Engineering Branch 3
Division of Reactor Safety
Docket No:
50-443 License No:
Enclosure:
Inspection Report 05000443/2008007 w/Attachment: Supplemental Information