IR 05000424/2019004
| ML20029D676 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, 07201039 |
| Issue date: | 01/29/2020 |
| From: | Alan Blamey NRC/RGN-II/DRP/RPB2 |
| To: | Gayheart C Southern Nuclear Operating Co |
| D. Mas-Penaranda DRP/RPB2 | |
| References | |
| IR 2019004 | |
| Download: ML20029D676 (18) | |
Text
January 29, 2020
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 & 2 - INTEGRATED INSPECTION REPORT 05000424/2019004 AND 05000425/2019004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07201039/2019004
Dear Ms. Gayheart:
On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 & 2. On January 17, 2020, the NRC inspectors discussed the results of this inspection with Mr. Keith Taber and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects
Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000424 and 05000425
License Numbers:
Report Numbers:
05000424/2019004 and 05000425/2019004
07201039/2019004
Enterprise Identifier: I-2019-004-0024
I-2019-004-0078
Licensee:
Southern Nuclear Operating Co., Inc.
Facility:
Vogtle Electric Generating Plant, Units 1 & 2
Location:
Waynesboro, GA
Inspection Dates:
October 01, 2019 to January 18, 2020
Inspectors:
B. Caballero, Senior Operations Engineer
K. Carrington, Senior Resident Inspector
M. Endress, Senior Resident Inspector
C. Safouri, Resident Inspector
Approved By:
Alan J. Blamey, Chief
Reactor Projects Branch 2
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Vogtle Electric Generating Plant, Units 1
& 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 began the inspection period operating at 100 percent rated thermal power (RTP). On December 1, 2019, power on the unit was reduced to approximately 83 percent RTP due to increased sodium levels resulting from a leak inside the 2A condenser. On December 5, power on the unit was increased to approximately 90 percent RTP as repairs were conducted inside the condenser. On December 9, power on the unit was reduced from approximately 90 percent RTP to approximately 77 percent RTP due to outside ambient temperature effects on the unit. On December 11, following completion of repairs inside the 2A condenser, the unit was returned to operating at 100 percent RTP, where it continued to operate through the end of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
Chemical and Volume Control System Nuclear Service Cooling Water System (NSCW)
71111.04Q - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 Train 'A' NSCW pumps #3 and #5 following NSCW pump #5 planned maintenance, on November 19, 2019
71111.04S - Equipment Alignment
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 NSCW system, from December 2 to December 20, 2019.
71111.05Q - Fire Protection
Quarterly Inspection (IP Section 03.01) (4 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Fire Zone 161, Unit 1 Emergency Diesel Generator (EDG) Building, on November 14, 2019
- (2) Fire Zones 165 and 166, Unit 1 Diesel Generator (DG) Tanks and Pumphouse, on November 24, 2019
- (3) Fire Zones 165 and 166, Unit 2 DG Tanks and Pumphouse, on November 24, 2019
- (4) Fire Zones 105, 106, 183A, Control Building Level 1; Fire Zones 601, 602, 603, 604, and 605, Technical Support Center (TSC), TSC Electrical Equipment Room, TSC Battery Room, TSC Control Building Level 1, on November 24, 2019
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 02.02a.) (2 Samples)
The inspectors evaluated internal flooding mitigation protections in:
- (1) Unit 1 Safety-related Cable Tunnels 1T4A and 1T4B
- (2) Unit 2 Trains 'A' and 'B' Centrifugal Charging Pump (CCP) rooms
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
The licensee completed the annual requalification operating examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. During the week of November 25, 2019, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP
===71111.11.
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam, which the facility licensee completed administering on August 22, 2019.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
=
- (1) The inspectors observed and evaluated licensed operator performance in the main control room during a partial loss of offsite power to Unit 2 due to the loss of the Standby Auxiliary Transformer (SAT) while aligned to the 4.16 Kilo-volt (kV) Emergency Bus 2AA02, on October 9, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated simulator training of transients associated with the loss of SAT while aligned to the Unit 2, 4.16 kV Bus 2AA02, on October 1, 2019 and October 9, 2019.
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Unit 2 Train 'A' NSCW Tower Spray Valve 2HV1668A maintenance preventable functional failure captured under CR 10625219, on June 6, 2019
Quality Control (IP Section 02.02) (1 Sample)
The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:
- (1) Replacement of the Unit 1 Train 'B' Engineered Safety Feature Chiller Pump under alternate treatment requirements, on December 16, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 2 elevated risk (YELLOW) due to Train 'B' NSCW Fan #2 outage with Train 'A' Reserve Auxiliary Transformer out of service, on October 1, 2019
- (2) Unit 1 6B Feedwater Heater Level Dump Controller 4235 emergent replacement due to main control room high/low level alarms, on October 21, 2019
- (3) Emergent troubleshooting of Unit 2 Train 'A' CCP pump shaft/bearing potential oil leak; Unit 1 Turbine Plant Component Cooling Water Pump #1 out of service for planned maintenance; and Unit 2 battery charger trip during a post-maintenance test, on November 5, 2019
- (4) Unit 2 emergent downpower and abnormal operating procedure entry due to 'A' west condenser waterbox tube leaks resulting in increased steam generator blowdown sodium levels, on December 1, 2019
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 02.02) (6 Samples)
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) CR 10660966, NRC-Identified Issue evaluating unit Technical Specification entry into limiting condition of operation for Control Room Emergency Filtration System (CREFS) during planned maintenance, on October 31, 2019
- (3) CR 10661586, Unit 2 Train 'B' Battery Charger trip during load test, on November 4, 2019
- (4) CR 10659522, Unit 2 Control Building Safety Feature Equipment Room Fan #2 holes in the bearing grease line, on October 29, 2019; and CR 10661268, Unit 2 'A' CCP inboard pump shaft oil leak, on November 4, 2019
- (5) CR 10665316, Unit 1 issue associated with 14420-1 Correct Containment Spray Resistance on Channel 2 Initially Not Obtained, on November 19, 2019
- (6) CR 10667964, Unit 1 Train 'B' DG Fuel Oil Level indicator needs replacement, on December 19, 2019
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Work Order SNC980101 for the use of a dummy head (pump) as a temporary support at NSCW pump discharge piping/nozzle locations during Unit 1 Train 'A' NSCW pump
- 4 refurbishment, on December 18, 2019
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post maintenance tests:
- (1) Unit 2 Loop 4 Atmospheric Relief Valve (ARV) post-maintenance test following Loop 4 ARV internal valve work and planned maintenance, on October 22, 2019
- (2) Unit 1 Train 'A' Piping Penetration Area Filtration and Exhaust System post maintenance test following planned maintenance, on October 22, 2019
- (3) Unit 1 Train 'B' CREFS post-maintenance test following 1B CREFS 18-month planned maintenance, on October 31, 2019
- (4) Unit 1 Train 'B' CCP post-maintenance test following 1B CCP system planned maintenance, on November 25, 2019
- (5) Unit 1 Train 'A' CCP post-maintenance test following 1A CCP system planned maintenance outage, on December 11, 2019
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Surveillance Tests (other) (IP Section 03.01)
(1)
===14806A-2, Unit 2 Train 'A' Containment Spray Pump Inservice Test (IST) and Response Time Test; and 14825-2, [Unit 2 Containment Spray Valves] Quarterly IST, on October 24, 2019 (2)14690B-1, Unit 1 Train 'B' CCP Quarterly IST, on October 29, 2019
FLEX Testing (IP Section 03.02)===
(1)2800-A2800G4012, Common FLEX 480V Diesel Generator Functional Tests and Inspections, on December 10, 2019
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
- (1) The inspectors observed an emergency preparedness drill that focused on a steam generator tube rupture concurrent with a station blackout event, on October 15,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicator submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (October 1, 2018 to September 30, 2019)
- (2) Unit 2 (October 1, 2018 to September 30, 2019)
71152 - Problem Identification and Resolution
Semiannual Trend Review (IP Section 02.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the performance of fire watches that might be indicative of a more significant safety issue.
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Part 21 Evaluation of Eaton A200 and Freedom Series Contactors, CR 10651125.
71153 - Followup of Events and Notices of Enforcement Discretion Reporting (IP Section 03.05)
- (1) Reportability Evaluation of Non-functional TSC Heating, Ventilation, and Air-conditioning Chiller, on November 5,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- (1) The inspectors evaluated the licensees activities related to monitoring of dry cask storage on the Independent Spent Fuel Storage Installation pad.
INSPECTION RESULTS
Observation: Semi-annual Trend Review Associated with Missed Fire Watches 71152 During a semi-annual trend review, the inspectors noted an increased trend in missed fire protection watches. Specifically, during their review of fire watch logs for both units, the inspectors identified examples where hourly fire watches were not completed within the 60 to 75 minutes allotted by procedure. The inspectors discussed their observations with the licensee and interviewed Operations personnel regarding the missed fire watches. During the interview, the inspectors learned that the missed fire watches had been previously identified by the licensee and corrective actions were implemented as a result. One of the causes identified was attributed to changes in contractors responsible for implementation of the fire watches. The corrective actions taken to address the causes included coaching and implementation of a standing order to reinforce the requirements for performing fire watches within the specified time frame. In addition, the inspectors performed a review of fire watches conducted after implementation of the licensee's corrective actions, and while the inspectors did not identify additional examples of missed fire watches, the inspectors noted the need for continued monitoring and trending in this area due to the licensee's intent to change fire watch contractors in the near future.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 17, 2020, the inspectors presented the integrated inspection results to Mr. Keith Taber and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
10673494,
10673371,
10666777,
10666930,
10666334
Corrective Action
Documents
Resulting from
Inspection
106743242
Miscellaneous
Site Certification for Winter Readiness
11/15/19
Procedures
11877-1
Cold Weather Checklist
26.2
11877-2
Cold Weather Checklist
2.2
11901-1
Heat Tracing System Alignment
13901-2
Heat Tracing System
10.1
NMP-GM-025
Seasonal Readiness Process
5.2
Drawings
1X4DB133-1
P&I Diagram - Nuclear Service Cooling Water System -
System No. 1202
56.0
1X4DB133-2
P&I Diagram - Nuclear Service Cooling Water System -
System No. 1202
2.0
Procedures
11150-1
Nuclear Service Cooling Water System Alignment
71111.05Q Corrective Action
Documents
10655470
1A DG Fireproofing Falling from Ceiling
10/14/2019
Corrective Action
Documents
Resulting from
Inspection
10664853
NRC Observation Concerning Fireproofing falling in 1A
EDG bldg.
11/15/2019
Fire Plans
2861-1
Zone 161-Diesel Generator Building Fire Fighting Preplan
Procedures
2805-1
Zone 105 - Control Building - Level 1 Fire Fighting Preplan
6.0
2805-2
Zone 105 - Control Building - Level 1 Fire Fighting Preplan
6.0
2806-1
Zone 106 - Control Building - Level 1 Fire Fighting Preplan
2.2
2865-1
Zone 165 - Diesel Generator Tanks and Pumphouse Fire
Fighting Preplan
2.2
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2865-2
Zone 165 - Diesel Generator Tanks and Pumphouse Fire
Fighting Preplan
0.2
2866-1
Zone 166 - Diesel Generator Tanks and Pumphouse Fire
Fighting Preplan
1.2
2866-2
Zone 166 - Diesel Generator Tanks and Pumphouse Fire
Fighting Preplan
0.2
2883A-1
Zone 183A - Control Building - Level 1 Fire Fighting
Preplan
1.2
2921-1
Zone 601 - Technical Support Center Fire Fighting Preplan 2.2
2922-1
Zone 602 - Technical Support Center Fire Fighting Preplan 3.1
2923-1
Zone 603 Technical Support Center Electrical Equipment
Room Fire Fighting Preplan
1.2
2924-1
Zone 604 Technical Support Center Battery Room Fire
Fighting Preplan
2.2
2925-1
Zone 605 TSC Control Building Level 1 Fire Fighting
Preplan
2.2
Calculations
Flooding Analysis - Outside Areas
11/06/1989
Flooding Analysis - Auxiliary Building - Level "C"
Corrective Action
Documents
10658620,
10313317,
10645149, 802581,
803980, 10644143
Corrective Action
Documents
Resulting from
Inspection
10658261
Drawings
1X4DB146-2
P&I Diagram - Auxiliary Building & Misc. Drains - System
No. 1215
25.0
1X4DB174-3
P&I Diagram - Fire Protection Water Systems - System
No. 2301
27.0
1X4DB174-4
P&I Diagram - Fire Protection Water Systems - System
No. 2301
25.0
1X4DL57C20
Underground and Aboveground Permanent Facilities [Area
C]
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2X4DB147-1
P&I Diagram - Auxiliary Building Flood Retaining Rooms
Alarms & Drains - System No. 1218
18.0
Miscellaneous
DC-1809
Cable Systems
Procedures
17061-2
Annunciator Response Procedures for ALB 61 on Process
Control Panel
18.2
NMP-ES-016
Environmental Qualification Program
9.2
71111.11Q Corrective Action
Documents
10653959
Miscellaneous
V-RQ-SG-20190930 Loss of 1AA02 / Unit Trip with SAT aligned
09/30/2019
V-RQ-SG-20191009 Paralleling DG1A to RAT 1A
10/09/19
Procedures
13418A-2
Standby Auxiliary Transformer Unit Two Train A
Operations
7.0
13418A-2
Standby Auxiliary Transformer Unit Two Train A
Operations
7.0
13427A-2
4160V AC Bus 2AA02 1E Electrical Distribution System
8.0
18031-2
Loss of Class 1 E Elect Systems
2.2
NMP-GM-021
Switchyard Access and Maintenance Controls
6.0
NMP-GM-021-003
Plant Vogtle 1-2 Switchyard Access and Maintenance
Controls
1.1
Corrective Action
Documents
10638923,
1050565,
10595737,
1039657, 1042837,
10616255,
10625219
Engineering
Evaluations
NISP-EN-02
Short Form Item Equivalency Evaluation for 3 IN x 4 IN -
IN Centrifugal Goulds Pump
TE 1044763
TE MREVAL-2HV1668A NSCW Tower Spray Valve will
not open
06/01/2019
Miscellaneous
EPRI Report
1009669
RISC-3 Seismic Assessment Guidelines
December
2004
EPRI Report
1011234
Program on Technology Innovation: 10CFR50.69
Implementation Guidance for Treatment of Structures,
January
2006
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Systems, and Components
RBD-V12-5069-
1609
Procedures
NMP-ES-027
NMP-ES-065-004
CFR 50.69 Alternative Treatment Requirements
4.0
SCM-014
CFR 50.69 Alternative Treatment Procurement
4.0
Drawings
1X4DB163-2
P&I Diagram-Feedwater Heater Drain System, System
No. 1304 (MSR, No. 6B Htr, Drains)
15.0
1X4DB163-4
P&I Diagram-Feedwater Heater Drain System No. 1304
(No. 4B, No. 5B, and Htr, Drn, Pump Drns.)
Corrective Action
Documents
10661268,
10660735,
10665316,
10661586,
10141719,
10659522
Corrective Action
Documents
Resulting from
Inspection
10670291
Drawings
1X6AU01-00306-7
CONTAINMENT PRESSURE-CABINET 02, CARD
FRAME 03
1X6AX01-00428
Master System Schematic Containment Pressure
AX3AD01B-00011
Schematic Sh 1 of 2 AMETEK/SCI 400AMP Safety Battery
Charger
1.0
AX3AD01B-00012
Schematic Sh. 2 of 2 AMETEK/SCI 400AMP Safety
Battery Charger
1.0
Procedures
14420-1
Solid State Protection System Train A Operability Test
14430-2
NSCW Cooling Tower Fans Monthly Test
25732-C
Megger Testing Motors
39.0
NMP-AD-031-GL01
Past Operability / Functionality Review
1.0
Work Orders
SNC854250,
SNC1059443,
SNC723975
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
REA01-VAA065
Drawings
1X4DB133-2
P&I Diagram Nuclear Service Water System
Engineering
Changes
TCC SNC980101
Miscellaneous
SNC980101
Recommended Procedure Changes to 27012-C Bingham
Williamette Type VCM "NSCW" Pump Removal and
Installation
Procedures
25024-C
Pipe Supports
27012-C
Bingham Wiliamette Type VCM Pump Maintenance
Work Orders
SNC121344
Corrective Action
Documents
10658245,
10658400,
10667344,
10657379
Miscellaneous
1-OL-22-1-DT-1561-
00148
1A1561PipingPen01
System Outage
Fragnet
Procedures
14510B-1
Train B Control Room Emergency Filtration System
Operability Test
7.1
14515A-1
Piping Penetration Area Filtration and Exhaust System
Operability Test-Train A
3.2
14625-1
SSPS Slave Relay K616 Train B Test Safety
Injection/Control Room Isolation
14808A-1
Train A Centrifugal Charging Pump and Check Valve IST
and Response Test
8.0
14808B-1
Train B Centrifugal Charging Pump and Check Valve IST
and Response Time Test
6.3
14809B-1
Train B ESF Chilled Water Pump Inservice Test
7.0
14825-2
Quarterly Inservice Valve Test
98.1
290-C
Agastat Series 2100 And 7000 Timing Relay Calibration
28620-C
Safety Related Filter System Carbon Adsorber Sampling
6.0
28625B-1
Train B Control Room Emergency Filtration System 1-
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1531-N7-002-000 Performance Test
28626B-1
Train B Control Room Emergency Filtration System 1-
1531-N7-002-000 Test
3.3
83308-C
Testing of Safety-Related NSCW System Coolers
33.3
83308-C
Testing of Safety-Related NSCW System Coolers
33.3
Work Orders
SNC1011463,
SNC865113,
SNC864983,
SNC736384,
SNC852302,
SNC906549,
SNC999821,
SNC974417,
SNC974697,
SNC975067,
SNC988723
Corrective Action
Documents
10658708,
10668056,
10645322,
10642248,
10634251
Drawings
2X4DB131
P&I Diagram - Containment Spray System - System No.
206
2.0
Miscellaneous
Diverse and Flexible Coping Strategies (FLEX)
Implementation Guide
Procedures
14806A-2
Train A Containment Spray Pump IST and Response Time
Test
3.3
14825-2
Quarterly Inservice Valve Test
98.1
83308-C
Testing of Safety-Related NSCW System Coolers
33.3
NMP-OS-019-013-
GL03
Vogtle Flex Equipment Unavailability Tracking Guideline
3.0
Work Orders
SNC903206,
SNC903298,
SNC903299,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC829192
Miscellaneous
Emergency Preparedness Drill Report
10/15/2019
Procedures
13427A-1
4160V AC Bus 1AA02 1E Electrical Distribution System
18031-1
Loss of Class 1E Elect Systems
1.2
19100-1
ECA - 0.0 Loss of all AC Power
4.2
71151
Drawings
Elementary Diagram Electrical System 4160V
1NCM.BRKR 152-1AA0219 From Emergency Diesel Gen.
1A
Miscellaneous
NRC Mitigating System Performance Index (MSPI) Basis
Document
Corrective Action
Documents
SNC10651125
Corrective Action
Documents
Resulting from
Inspection
10664627
Small Packing leak on AFW SG1 Supply from MDAFW 'A'
(2-HV-5139)
11/14/2019
10664638
Damaged Conduit support for Loop 4 Bypass Feed Reg
Valve
11/14/2019
Miscellaneous
Firewatch / LCO Status Board as of 11/24/2019
Active Fire watches (1-19-063; 1-19-144; 2-19-122; 2-19-
24; 2-19-133)
11/14/2019
C-2019-15
Missed Fire Watch Stop-Gap Actions
09/18/2019
Procedures
NMP-AD-028
NMP-ES-035-007
Fleet Fire Watch Instruction
5.0
Corrective Action
Documents
10661912
Drawings
AX3D-AA-A03A
Vogtle-Wilson Master One Line Diagram
18.0
Procedures
201-C
Activation and Operation of the Technical Support Center
NMP-AD-031
SNC Reportability Roles, Responsibilities, and Fleet
Requirements
9.3
NMP-GM-021-003
Plant Vogtle 1-2 Switchyard Access and Maintenance
Controls
05/28/2018