IR 05000424/2019004

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000424/2019004 and 05000425/2019004 and Independent Spent Fuel Storage Installation Report 07201039/2019004
ML20029D676
Person / Time
Site: Vogtle, 07201039  Southern Nuclear icon.png
Issue date: 01/29/2020
From: Alan Blamey
NRC/RGN-II/DRP/RPB2
To: Gayheart C
Southern Nuclear Operating Co
D. Mas-Penaranda DRP/RPB2
References
IR 2019004
Download: ML20029D676 (18)


Text

{{#Wiki_filter:ary 29, 2020

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 & 2 - INTEGRATED INSPECTION REPORT 05000424/2019004 AND 05000425/2019004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07201039/2019004

Dear Ms. Gayheart:

On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 & 2. On January 17, 2020, the NRC inspectors discussed the results of this inspection with Mr. Keith Taber and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, /RA/ Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000424 and 05000425 License Numbers: NPF-68 and NPF-81 Report Numbers: 05000424/2019004 and 05000425/2019004 07201039/2019004 Enterprise Identifier: I-2019-004-0024 I-2019-004-0078 Licensee: Southern Nuclear Operating Co., Inc.

Facility: Vogtle Electric Generating Plant, Units 1 & 2 Location: Waynesboro, GA Inspection Dates: October 01, 2019 to January 18, 2020 Inspectors: B. Caballero, Senior Operations Engineer K. Carrington, Senior Resident Inspector M. Endress, Senior Resident Inspector C. Safouri, Resident Inspector Approved By: Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Vogtle Electric Generating Plant, Units 1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period.

Unit 2 began the inspection period operating at 100 percent rated thermal power (RTP). On December 1, 2019, power on the unit was reduced to approximately 83 percent RTP due to increased sodium levels resulting from a leak inside the 2A condenser. On December 5, power on the unit was increased to approximately 90 percent RTP as repairs were conducted inside the condenser. On December 9, power on the unit was reduced from approximately 90 percent RTP to approximately 77 percent RTP due to outside ambient temperature effects on the unit. On December 11, following completion of repairs inside the 2A condenser, the unit was returned to operating at 100 percent RTP, where it continued to operate through the end of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.02)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:

Chemical and Volume Control System Nuclear Service Cooling Water System (NSCW)

71111.04Q - Equipment Alignment Partial Walkdown Sample (IP Section 03.01)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 Train 'A' NSCW pumps #3 and #5 following NSCW pump #5 planned maintenance, on November 19, 2019

71111.04S - Equipment Alignment Complete Walkdown Sample (IP Section 03.02)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 NSCW system, from December 2 to December 20, 2019.

71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire Zone 161, Unit 1 Emergency Diesel Generator (EDG) Building, on November 14, 2019
(2) Fire Zones 165 and 166, Unit 1 Diesel Generator (DG) Tanks and Pumphouse, on November 24, 2019
(3) Fire Zones 165 and 166, Unit 2 DG Tanks and Pumphouse, on November 24, 2019
(4) Fire Zones 105, 106, 183A, Control Building Level 1; Fire Zones 601, 602, 603, 604, and 605, Technical Support Center (TSC), TSC Electrical Equipment Room, TSC Battery Room, TSC Control Building Level 1, on November 24, 2019

71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)

The inspectors evaluated internal flooding mitigation protections in:

(1) Unit 1 Safety-related Cable Tunnels 1T4A and 1T4B
(2) Unit 2 Trains 'A' and 'B' Centrifugal Charging Pump (CCP) rooms

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance Requalification Examination Results (IP Section 03.03)

The licensee completed the annual requalification operating examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. During the week of November 25, 2019, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP

===71111.11.

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam, which the facility licensee completed administering on August 22, 2019.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1) The inspectors observed and evaluated licensed operator performance in the main control room during a partial loss of offsite power to Unit 2 due to the loss of the Standby Auxiliary Transformer (SAT) while aligned to the 4.16 Kilo-volt (kV) Emergency Bus 2AA02, on October 9, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) ===

(1) The inspectors observed and evaluated simulator training of transients associated with the loss of SAT while aligned to the Unit 2, 4.16 kV Bus 2AA02, on October 1, 2019 and October 9, 2019.

71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Unit 2 Train 'A' NSCW Tower Spray Valve 2HV1668A maintenance preventable functional failure captured under CR 10625219, on June 6, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1) Replacement of the Unit 1 Train 'B' Engineered Safety Feature Chiller Pump under alternate treatment requirements, on December 16, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 2 elevated risk (YELLOW) due to Train 'B' NSCW Fan #2 outage with Train 'A' Reserve Auxiliary Transformer out of service, on October 1, 2019
(2) Unit 1 6B Feedwater Heater Level Dump Controller 4235 emergent replacement due to main control room high/low level alarms, on October 21, 2019
(3) Emergent troubleshooting of Unit 2 Train 'A' CCP pump shaft/bearing potential oil leak; Unit 1 Turbine Plant Component Cooling Water Pump #1 out of service for planned maintenance; and Unit 2 battery charger trip during a post-maintenance test, on November 5, 2019
(4) Unit 2 emergent downpower and abnormal operating procedure entry due to 'A' west condenser waterbox tube leaks resulting in increased steam generator blowdown sodium levels, on December 1, 2019

71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 02.02)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) CR 10660966, NRC-Identified Issue evaluating unit Technical Specification entry into limiting condition of operation for Control Room Emergency Filtration System (CREFS) during planned maintenance, on October 31, 2019
(2) CR 10660735, Unit 2 Train 'B' NSCW Tower Fan #1 motor megger failure, on November 1, 2019
(3) CR 10661586, Unit 2 Train 'B' Battery Charger trip during load test, on November 4, 2019
(4) CR 10659522, Unit 2 Control Building Safety Feature Equipment Room Fan #2 holes in the bearing grease line, on October 29, 2019; and CR 10661268, Unit 2 'A' CCP inboard pump shaft oil leak, on November 4, 2019
(5) CR 10665316, Unit 1 issue associated with 14420-1 Correct Containment Spray Resistance on Channel 2 Initially Not Obtained, on November 19, 2019
(6) CR 10667964, Unit 1 Train 'B' DG Fuel Oil Level indicator needs replacement, on December 19, 2019

==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample) The inspectors evaluated the following temporary or permanent modifications:

(1) Work Order SNC980101 for the use of a dummy head (pump) as a temporary support at NSCW pump discharge piping/nozzle locations during Unit 1 Train 'A' NSCW pump
         #4 refurbishment, on December 18, 2019

71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01)

[[IP sample::=

=IP 71111.18|count=5}}

The inspectors evaluated the following post maintenance tests:

(1) Unit 2 Loop 4 Atmospheric Relief Valve (ARV) post-maintenance test following Loop 4 ARV internal valve work and planned maintenance, on October 22, 2019
(2) Unit 1 Train 'A' Piping Penetration Area Filtration and Exhaust System post maintenance test following planned maintenance, on October 22, 2019
(3) Unit 1 Train 'B' CREFS post-maintenance test following 1B CREFS 18-month planned maintenance, on October 31, 2019
(4) Unit 1 Train 'B' CCP post-maintenance test following 1B CCP system planned maintenance, on November 25, 2019
(5) Unit 1 Train 'A' CCP post-maintenance test following 1A CCP system planned maintenance outage, on December 11, 2019

71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Surveillance Tests (other) (IP Section 03.01)

(1) 14806A-2, Unit 2 Train 'A' Containment Spray Pump Inservice Test (IST) and Response Time Test; and 14825-2, [Unit 2 Containment Spray Valves] Quarterly IST, on October 24, 2019
(2) 14690B-1, Unit 1 Train 'B' CCP Quarterly IST, on October 29, 2019

FLEX Testing (IP Section 03.02) (1 Sample)

(1) 2800-A2800G4012, Common FLEX 480V Diesel Generator Functional Tests and Inspections, on December 10, 2019

71114.06 - Drill Evaluation Drill/Training Evolution Observation (IP Section 03.02)

The inspectors evaluated:

(1) The inspectors observed an emergency preparedness drill that focused on a steam generator tube rupture concurrent with a station blackout event, on October 15,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicator submittals listed below: MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===

(1) Unit 1 (October 1, 2018 - September 30, 2019)
(2) Unit 2 (October 1, 2018 - September 30, 2019)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (October 1, 2018 - September 30, 2019)
(2) Unit 2 (October 1, 2018 - September 30, 2019)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (October 1, 2018 to September 30, 2019)
(2) Unit 2 (October 1, 2018 to September 30, 2019)

71152 - Problem Identification and Resolution Semiannual Trend Review (IP Section 02.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the performance of fire watches that might be indicative of a more significant safety issue.

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample) The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Part 21 Evaluation of Eaton A200 and Freedom Series Contactors, CR 10651125.

71153 - Followup of Events and Notices of Enforcement Discretion Reporting (IP Section 03.05)

(1) Reportability Evaluation of Non-functional TSC Heating, Ventilation, and Air-conditioning Chiller, on November 5,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants

(1) The inspectors evaluated the licensees activities related to monitoring of dry cask storage on the Independent Spent Fuel Storage Installation pad.

INSPECTION RESULTS

Observation: Semi-annual Trend Review Associated with Missed Fire Watches 71152 During a semi-annual trend review, the inspectors noted an increased trend in missed fire protection watches. Specifically, during their review of fire watch logs for both units, the inspectors identified examples where hourly fire watches were not completed within the 60 to 75 minutes allotted by procedure. The inspectors discussed their observations with the licensee and interviewed Operations personnel regarding the missed fire watches. During the interview, the inspectors learned that the missed fire watches had been previously identified by the licensee and corrective actions were implemented as a result. One of the causes identified was attributed to changes in contractors responsible for implementation of the fire watches. The corrective actions taken to address the causes included coaching and implementation of a standing order to reinforce the requirements for performing fire watches within the specified time frame. In addition, the inspectors performed a review of fire watches conducted after implementation of the licensee's corrective actions, and while the inspectors did not identify additional examples of missed fire watches, the inspectors noted the need for continued monitoring and trending in this area due to the licensee's intent to change fire watch contractors in the near future.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 17, 2020, the inspectors presented the integrated inspection results to Mr. Keith Taber and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or Procedure Date 71111.01 Corrective Action 10673494, Documents 10673371, 10666777, 10666930, 10666334 Corrective Action 106743242 Documents Resulting from Inspection Miscellaneous Site Certification for Winter Readiness 11/15/19 Procedures 11877-1 Cold Weather Checklist 26.2 11877-2 Cold Weather Checklist 22.2 11901-1 Heat Tracing System Alignment 19 13901-2 Heat Tracing System 10.1 NMP-GM-025 Seasonal Readiness Process 5.2 71111.04S Drawings 1X4DB133-1 P&I Diagram - Nuclear Service Cooling Water System - 56.0 System No. 1202 1X4DB133-2 P&I Diagram - Nuclear Service Cooling Water System - 62.0 System No. 1202 Procedures 11150-1 Nuclear Service Cooling Water System Alignment 18 71111.05Q Corrective Action 10655470 1A DG Fireproofing Falling from Ceiling 10/14/2019 Documents Corrective Action 10664853 NRC Observation Concerning Fireproofing falling in 1A 11/15/2019 Documents EDG bldg. Resulting from Inspection Fire Plans 92861-1 Zone 161- Diesel Generator Building Fire Fighting Preplan 4 Procedures 92805-1 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0 2805-2 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0 2806-1 Zone 106 - Control Building - Level 1 Fire Fighting Preplan 2.2 2865-1 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 2.2 Fighting Preplan Inspection Type Designation Description or Title Revision or Procedure Date 2865-2 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 0.2 Fighting Preplan 2866-1 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 1.2 Fighting Preplan 2866-2 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 0.2 Fighting Preplan 2883A-1 Zone 183A - Control Building - Level 1 Fire Fighting 1.2 Preplan 2921-1 Zone 601 - Technical Support Center Fire Fighting Preplan 2.2 2922-1 Zone 602 - Technical Support Center Fire Fighting Preplan 3.1 2923-1 Zone 603 Technical Support Center Electrical Equipment 1.2 Room Fire Fighting Preplan 2924-1 Zone 604 Technical Support Center Battery Room Fire 2.2 Fighting Preplan 2925-1 Zone 605 TSC Control Building Level 1 Fire Fighting 2.2 Preplan 71111.06 Calculations X6CXC-17 Flooding Analysis - Outside Areas 11/06/1989 X6CYC-26 Flooding Analysis - Auxiliary Building - Level "C" 10 Corrective Action 10658620, Documents 10313317, 10645149, 802581, 803980, 10644143 Corrective Action 10658261 Documents Resulting from Inspection Drawings 1X4DB146-2 P&I Diagram - Auxiliary Building & Misc. Drains - System 25.0 No. 1215 1X4DB174-3 P&I Diagram - Fire Protection Water Systems - System 27.0 No. 2301 1X4DB174-4 P&I Diagram - Fire Protection Water Systems - System 25.0 No. 2301 1X4DL57C20 Underground and Aboveground Permanent Facilities [Area 2 C] Inspection Type Designation Description or Title Revision or Procedure Date 2X4DB147-1 P&I Diagram - Auxiliary Building Flood Retaining Rooms 18.0 Alarms & Drains - System No. 1218 Miscellaneous DC-1809 Cable Systems 24 Procedures 17061-2 Annunciator Response Procedures for ALB 61 on Process 18.2 Control Panel NMP-ES-016 Environmental Qualification Program 9.2 71111.11Q Corrective Action 10653959 Documents Miscellaneous V-RQ-SG-20190930 Loss of 1AA02 / Unit Trip with SAT aligned 09/30/2019 V-RQ-SG-20191009 Paralleling DG1A to RAT 1A 10/09/19 Procedures 13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0 Operations 13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0 Operations 13427A-2 4160V AC Bus 2AA02 1E Electrical Distribution System 8.0 18031-2 Loss of Class 1 E Elect Systems 2.2 NMP-GM-021 Switchyard Access and Maintenance Controls 6.0 NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 1.1 Controls 71111.12 Corrective Action 10638923, Documents 1050565, 10595737, 1039657, 1042837, 10616255, 10625219 CAR 276396 Engineering NISP-EN-02 Short Form Item Equivalency Evaluation for 3 IN x 4 IN - 0 Evaluations 13 IN Centrifugal Goulds Pump TE 1044763 TE MREVAL-2HV1668A NSCW Tower Spray Valve will 06/01/2019 not open Miscellaneous EPRI Report RISC-3 Seismic Assessment Guidelines December 1009669 2004 EPRI Report Program on Technology Innovation: 10CFR50.69 January 1011234 Implementation Guidance for Treatment of Structures, 2006 Inspection Type Designation Description or Title Revision or Procedure Date Systems, and Components RBD-V12-5069- 1609 Procedures NMP-ES-027 Maintenance Rule Program 10 NMP-ES-065-004 10 CFR 50.69 Alternative Treatment Requirements 4.0 SCM-014 10 CFR 50.69 Alternative Treatment Procurement 4.0 71111.13 Drawings 1X4DB163-2 P&I Diagram- Feedwater Heater Drain System, System 15.0 No. 1304 (MSR, No. 6B Htr, Drains) 1X4DB163-4 P&I Diagram- Feedwater Heater Drain System No. 1304 28

                                            (No. 4B, No. 5B, and Htr, Drn, Pump Drns.)

71111.15 Corrective Action 10661268, Documents 10660735, 10665316, 10661586, 10141719, 10659522 Corrective Action 10670291 Documents Resulting from Inspection Drawings 1X6AU01-00306-7 CONTAINMENT PRESSURE- CABINET 02, CARD 13 FRAME 03 1X6AX01-00428 Master System Schematic Containment Pressure 5 AX3AD01B-00011 Schematic Sh 1 of 2 AMETEK/SCI 400AMP Safety Battery 1.0 Charger AX3AD01B-00012 Schematic Sh. 2 of 2 AMETEK/SCI 400AMP Safety 1.0 Battery Charger Procedures 14420-1 Solid State Protection System Train A Operability Test 63 14430-2 NSCW Cooling Tower Fans Monthly Test 10 25732-C Megger Testing Motors 39.0 NMP-AD-031-GL01 Past Operability / Functionality Review 1.0 Work Orders SNC854250, SNC1059443, SNC723975 Inspection Type Designation Description or Title Revision or Procedure Date 71111.18 Calculations REA01-VAA065 Drawings 1X4DB133-2 P&I Diagram Nuclear Service Water System 62 Engineering TCC SNC980101 Changes Miscellaneous SNC980101 Recommended Procedure Changes to 27012-C Bingham Williamette Type VCM "NSCW" Pump Removal and Installation Procedures 25024-C Pipe Supports 12 27012-C Bingham Wiliamette Type VCM Pump Maintenance 25 Work Orders SNC121344 71111.19 Corrective Action 10658245, Documents 10658400, 10667344, 10657379 Miscellaneous 1-OL-22-1-DT-1561- 00148 1A1561PipingPen01 System Outage Fragnet Procedures 14510B-1 Train B Control Room Emergency Filtration System 7.1 Operability Test 14515A-1 Piping Penetration Area Filtration and Exhaust System 3.2 Operability Test- Train A 14625-1 SSPS Slave Relay K616 Train B Test Safety 19 Injection/Control Room Isolation 14808A-1 Train A Centrifugal Charging Pump and Check Valve IST 8.0 and Response Test 14808B-1 Train B Centrifugal Charging Pump and Check Valve IST 6.3 and Response Time Test 14809B-1 Train B ESF Chilled Water Pump Inservice Test 7.0 14825-2 Quarterly Inservice Valve Test 98.1 290-C Agastat Series 2100 And 7000 Timing Relay Calibration 39 28620-C Safety Related Filter System Carbon Adsorber Sampling 6.0 28625B-1 Train B Control Room Emergency Filtration System 1- 3 Inspection Type Designation Description or Title Revision or Procedure Date 1531-N7-002-000 Performance Test 28626B-1 Train B Control Room Emergency Filtration System 1- 3.3 1531-N7-002-000 Test 83308-C Testing of Safety-Related NSCW System Coolers 33.3 83308-C Testing of Safety-Related NSCW System Coolers 33.3 Work Orders SNC1011463, SNC865113, SNC864983, SNC736384, SNC852302, SNC906549, SNC999821, SNC974417, SNC974697, SNC975067, SNC988723 71111.22 Corrective Action 10658708, Documents 10668056, 10645322, 10642248, 10634251 Drawings 2X4DB131 P&I Diagram - Containment Spray System - System No. 32.0 206 Miscellaneous NEI 12-06 Diverse and Flexible Coping Strategies (FLEX) 4 Implementation Guide Procedures 14806A-2 Train A Containment Spray Pump IST and Response Time 3.3 Test 14825-2 Quarterly Inservice Valve Test 98.1 83308-C Testing of Safety-Related NSCW System Coolers 33.3 NMP-OS-019-013- Vogtle Flex Equipment Unavailability Tracking Guideline 3.0 GL03 Work Orders SNC903206, SNC903298, SNC903299, Inspection Type Designation Description or Title Revision or Procedure Date SNC829192 71114.06 Miscellaneous Emergency Preparedness Drill Report 10/15/2019 Procedures 13427A-1 4160V AC Bus 1AA02 1E Electrical Distribution System 10 18031-1 Loss of Class 1E Elect Systems 1.2 19100-1 ECA - 0.0 Loss of all AC Power 4.2 71151 Drawings 1X3D-BA-D02D Elementary Diagram Electrical System 4160V 13 1NCM.BRKR 152-1AA0219 From Emergency Diesel Gen. 1A Miscellaneous NRC Mitigating System Performance Index (MSPI) Basis 10 Document 71152 Corrective Action SNC10651125 Documents Corrective Action 10664627 Small Packing leak on AFW SG1 Supply from MDAFW 'A' 11/14/2019 Documents (2-HV-5139) Resulting from 10664638 Damaged Conduit support for Loop 4 Bypass Feed Reg 11/14/2019 Inspection Valve Miscellaneous Firewatch / LCO Status Board as of 11/24/2019 Active Fire watches (1-19-063; 1-19-144; 2-19-122; 2-19- 11/14/2019 24; 2-19-133) C-2019-15 Missed Fire Watch Stop-Gap Actions 09/18/2019 Procedures NMP-AD-028 5 NMP-ES-035-007 Fleet Fire Watch Instruction 5.0 71153 Corrective Action 10661912 Documents Drawings AX3D-AA-A03A Vogtle- Wilson Master One Line Diagram 18.0 Procedures 91201-C Activation and Operation of the Technical Support Center 21 NMP-AD-031 SNC Reportability Roles, Responsibilities, and Fleet 9.3 Requirements NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 05/28/2018 Controls 16| ]]