MONTHYEARIR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 IR 05000424/20230062024-02-28028 February 2024 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424-2023006 and 05000425-2023006 IR 05000424/20240102024-02-14014 February 2024 – Fire Protection Team Inspection Report 0500424/2024010 and 05000425/2024010 IR 05000202/20300042024-02-13013 February 2024 Integrated Inspection Report 052000250/2023004 and 05200026/2023004 ML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 IR 05000424/20230042024-02-0505 February 2024 Integrated Inspection Report 05000424-2023004 and 05000425-2023004 ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 ML23312A3502023-11-14014 November 2023 – Integrated Inspection Report 05200026/2023003 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 IR 05000424/20234022023-11-0606 November 2023 – Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23254A2032023-09-13013 September 2023 – Initial Test Program and Operational Programs Inspection Report 05200025/2023013 IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23223A0022023-08-14014 August 2023 Integrated Inspection Report 05200025/2023002 IR 05000424/20230112023-08-11011 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 ML23215A0822023-08-0404 August 2023 (Vego), Unit 3 – Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report ML23212B0612023-07-31031 July 2023 Security Baseline Inspection Report 05200025/2023401 IR 05000424/20234012023-07-31031 July 2023 Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 IR 05000424/20230022023-07-24024 July 2023 Integrated Inspection Report 05000424/2023002 and 05000425/2023002 ML23198A3802023-07-19019 July 2023 NRC Integrated Inspection Report 05200026/2023002 ML23199A0892023-07-18018 July 2023 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 IR 05000424/20233012023-06-30030 June 2023 – NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML23128A2932023-05-11011 May 2023 NRC Integrated Inspection Report 05200026/2023001 ML23129A0222023-05-10010 May 2023 Integrated Report 05200025/2023001 ML23128A3492023-05-0909 May 2023 – Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 ML23121A3202023-05-0404 May 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 IR 05000424/20230012023-04-26026 April 2023 Integrated Inspection Report 05000424/2023001 and 05000425/2023001 IR 05000424/20230902023-03-30030 March 2023 NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation ML23083B3702023-03-24024 March 2023 Security Baseline Inspection Report 05200026/2023401 IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23044A3902023-02-14014 February 2023 Integrated Inspection Report05200025 2022007 ML23040A3612023-02-0909 February 2023 – NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 ML23040A0422023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 ML23033A3972023-02-0707 February 2023 NRC Integrated Inspection Report 05200026/2022007 IR 05000424/20220042023-01-23023 January 2023 Integrated Inspection Report 05000424/2022004 and 05000425/2022004 2024-08-26
[Table view] Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0197, Registration of Spent Fuel Cask Use2024-05-20020 May 2024 Registration of Spent Fuel Cask Use ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) 2024-09-09
[Table view] |
Inspection Report - Vogtle - 2019004 |
---|
|
|
Text
{{#Wiki_filter:ary 29, 2020
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 & 2 - INTEGRATED INSPECTION REPORT 05000424/2019004 AND 05000425/2019004 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07201039/2019004
Dear Ms. Gayheart:
On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 & 2. On January 17, 2020, the NRC inspectors discussed the results of this inspection with Mr. Keith Taber and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000424 and 05000425 License Numbers: NPF-68 and NPF-81 Report Numbers: 05000424/2019004 and 05000425/2019004 07201039/2019004 Enterprise Identifier: I-2019-004-0024 I-2019-004-0078 Licensee: Southern Nuclear Operating Co., Inc.
Facility: Vogtle Electric Generating Plant, Units 1 & 2 Location: Waynesboro, GA Inspection Dates: October 01, 2019 to January 18, 2020 Inspectors: B. Caballero, Senior Operations Engineer K. Carrington, Senior Resident Inspector M. Endress, Senior Resident Inspector C. Safouri, Resident Inspector Approved By: Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Vogtle Electric Generating Plant, Units 1
& 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 began the inspection period operating at 100 percent rated thermal power (RTP). On December 1, 2019, power on the unit was reduced to approximately 83 percent RTP due to increased sodium levels resulting from a leak inside the 2A condenser. On December 5, power on the unit was increased to approximately 90 percent RTP as repairs were conducted inside the condenser. On December 9, power on the unit was reduced from approximately 90 percent RTP to approximately 77 percent RTP due to outside ambient temperature effects on the unit. On December 11, following completion of repairs inside the 2A condenser, the unit was returned to operating at 100 percent RTP, where it continued to operate through the end of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection Seasonal Extreme Weather Sample (IP Section 03.02)
Main article: IP 71111.01
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
Chemical and Volume Control System Nuclear Service Cooling Water System (NSCW)
71111.04Q - Equipment Alignment Partial Walkdown Sample (IP Section 03.01)
Main article: IP 71111.04Q
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 Train 'A' NSCW pumps #3 and #5 following NSCW pump #5 planned maintenance, on November 19, 2019
71111.04S - Equipment Alignment Complete Walkdown Sample (IP Section 03.02)
Main article: IP 71111.04S
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 NSCW system, from December 2 to December 20, 2019.
71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)
Main article: IP 71111.05Q
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Fire Zone 161, Unit 1 Emergency Diesel Generator (EDG) Building, on November 14, 2019
- (2) Fire Zones 165 and 166, Unit 1 Diesel Generator (DG) Tanks and Pumphouse, on November 24, 2019
- (3) Fire Zones 165 and 166, Unit 2 DG Tanks and Pumphouse, on November 24, 2019
- (4) Fire Zones 105, 106, 183A, Control Building Level 1; Fire Zones 601, 602, 603, 604, and 605, Technical Support Center (TSC), TSC Electrical Equipment Room, TSC Battery Room, TSC Control Building Level 1, on November 24, 2019
71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)
Main article: IP 71111.06
The inspectors evaluated internal flooding mitigation protections in:
- (1) Unit 1 Safety-related Cable Tunnels 1T4A and 1T4B
- (2) Unit 2 Trains 'A' and 'B' Centrifugal Charging Pump (CCP) rooms
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance Requalification Examination Results (IP Section 03.03)
Main article: IP 71111.11A
The licensee completed the annual requalification operating examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. During the week of November 25, 2019, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP
===71111.11.
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam, which the facility licensee completed administering on August 22, 2019.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
Main article: IP 71111.11Q
- (1) The inspectors observed and evaluated licensed operator performance in the main control room during a partial loss of offsite power to Unit 2 due to the loss of the Standby Auxiliary Transformer (SAT) while aligned to the 4.16 Kilo-volt (kV) Emergency Bus 2AA02, on October 9, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) ===
Main article: IP 71111.11
- (1) The inspectors observed and evaluated simulator training of transients associated with the loss of SAT while aligned to the Unit 2, 4.16 kV Bus 2AA02, on October 1, 2019 and October 9, 2019.
71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)
Main article: IP 71111.12
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Unit 2 Train 'A' NSCW Tower Spray Valve 2HV1668A maintenance preventable functional failure captured under CR 10625219, on June 6, 2019
Quality Control (IP Section 02.02) (1 Sample)
The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:
- (1) Replacement of the Unit 1 Train 'B' Engineered Safety Feature Chiller Pump under alternate treatment requirements, on December 16, 2019
71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)
Main article: IP 71111.13
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 2 elevated risk (YELLOW) due to Train 'B' NSCW Fan #2 outage with Train 'A' Reserve Auxiliary Transformer out of service, on October 1, 2019
- (2) Unit 1 6B Feedwater Heater Level Dump Controller 4235 emergent replacement due to main control room high/low level alarms, on October 21, 2019
- (3) Emergent troubleshooting of Unit 2 Train 'A' CCP pump shaft/bearing potential oil leak; Unit 1 Turbine Plant Component Cooling Water Pump #1 out of service for planned maintenance; and Unit 2 battery charger trip during a post-maintenance test, on November 5, 2019
- (4) Unit 2 emergent downpower and abnormal operating procedure entry due to 'A' west condenser waterbox tube leaks resulting in increased steam generator blowdown sodium levels, on December 1, 2019
71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 02.02)
Main article: IP 71111.15
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) CR 10660966, NRC-Identified Issue evaluating unit Technical Specification entry into limiting condition of operation for Control Room Emergency Filtration System (CREFS) during planned maintenance, on October 31, 2019
- (2) CR 10660735, Unit 2 Train 'B' NSCW Tower Fan #1 motor megger failure, on November 1, 2019
- (3) CR 10661586, Unit 2 Train 'B' Battery Charger trip during load test, on November 4, 2019
- (4) CR 10659522, Unit 2 Control Building Safety Feature Equipment Room Fan #2 holes in the bearing grease line, on October 29, 2019; and CR 10661268, Unit 2 'A' CCP inboard pump shaft oil leak, on November 4, 2019
- (5) CR 10665316, Unit 1 issue associated with 14420-1 Correct Containment Spray Resistance on Channel 2 Initially Not Obtained, on November 19, 2019
- (6) CR 10667964, Unit 1 Train 'B' DG Fuel Oil Level indicator needs replacement, on December 19, 2019
==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Work Order SNC980101 for the use of a dummy head (pump) as a temporary support at NSCW pump discharge piping/nozzle locations during Unit 1 Train 'A' NSCW pump
#4 refurbishment, on December 18, 2019
71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01)
Main article: [[=
=IP 71111.18|count=5}}
The inspectors evaluated the following post maintenance tests:
- (1) Unit 2 Loop 4 Atmospheric Relief Valve (ARV) post-maintenance test following Loop 4 ARV internal valve work and planned maintenance, on October 22, 2019
- (2) Unit 1 Train 'A' Piping Penetration Area Filtration and Exhaust System post maintenance test following planned maintenance, on October 22, 2019
- (3) Unit 1 Train 'B' CREFS post-maintenance test following 1B CREFS 18-month planned maintenance, on October 31, 2019
- (4) Unit 1 Train 'B' CCP post-maintenance test following 1B CCP system planned maintenance, on November 25, 2019
- (5) Unit 1 Train 'A' CCP post-maintenance test following 1A CCP system planned maintenance outage, on December 11, 2019
71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Surveillance Tests (other) (IP Section 03.01)
Main article: IP 71111.22
- (1) 14806A-2, Unit 2 Train 'A' Containment Spray Pump Inservice Test (IST) and Response Time Test; and 14825-2, [Unit 2 Containment Spray Valves] Quarterly IST, on October 24, 2019
- (2) 14690B-1, Unit 1 Train 'B' CCP Quarterly IST, on October 29, 2019
FLEX Testing (IP Section 03.02) (1 Sample)
- (1) 2800-A2800G4012, Common FLEX 480V Diesel Generator Functional Tests and Inspections, on December 10, 2019
71114.06 - Drill Evaluation Drill/Training Evolution Observation (IP Section 03.02)
Main article: IP 71114.06
The inspectors evaluated:
- (1) The inspectors observed an emergency preparedness drill that focused on a steam generator tube rupture concurrent with a station blackout event, on October 15,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicator submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (October 1, 2018 to September 30, 2019)
- (2) Unit 2 (October 1, 2018 to September 30, 2019)
71152 - Problem Identification and Resolution Semiannual Trend Review (IP Section 02.02)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the performance of fire watches that might be indicative of a more significant safety issue.
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Part 21 Evaluation of Eaton A200 and Freedom Series Contactors, CR 10651125.
71153 - Followup of Events and Notices of Enforcement Discretion Reporting (IP Section 03.05)
- (1) Reportability Evaluation of Non-functional TSC Heating, Ventilation, and Air-conditioning Chiller, on November 5,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- (1) The inspectors evaluated the licensees activities related to monitoring of dry cask storage on the Independent Spent Fuel Storage Installation pad.
INSPECTION RESULTS
Observation: Semi-annual Trend Review Associated with Missed Fire Watches 71152 During a semi-annual trend review, the inspectors noted an increased trend in missed fire protection watches. Specifically, during their review of fire watch logs for both units, the inspectors identified examples where hourly fire watches were not completed within the 60 to 75 minutes allotted by procedure. The inspectors discussed their observations with the licensee and interviewed Operations personnel regarding the missed fire watches. During the interview, the inspectors learned that the missed fire watches had been previously identified by the licensee and corrective actions were implemented as a result. One of the causes identified was attributed to changes in contractors responsible for implementation of the fire watches. The corrective actions taken to address the causes included coaching and implementation of a standing order to reinforce the requirements for performing fire watches within the specified time frame. In addition, the inspectors performed a review of fire watches conducted after implementation of the licensee's corrective actions, and while the inspectors did not identify additional examples of missed fire watches, the inspectors noted the need for continued monitoring and trending in this area due to the licensee's intent to change fire watch contractors in the near future.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 17, 2020, the inspectors presented the integrated inspection results to Mr. Keith Taber and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.01 Corrective Action 10673494,
Documents 10673371,
10666777,
10666930,
10666334
Corrective Action 106743242
Documents
Resulting from
Inspection
Miscellaneous Site Certification for Winter Readiness 11/15/19
Procedures 11877-1 Cold Weather Checklist 26.2
11877-2 Cold Weather Checklist 22.2
11901-1 Heat Tracing System Alignment 19
13901-2 Heat Tracing System 10.1
NMP-GM-025 Seasonal Readiness Process 5.2
71111.04S Drawings 1X4DB133-1 P&I Diagram - Nuclear Service Cooling Water System - 56.0
System No. 1202
1X4DB133-2 P&I Diagram - Nuclear Service Cooling Water System - 62.0
System No. 1202
Procedures 11150-1 Nuclear Service Cooling Water System Alignment 18
71111.05Q Corrective Action 10655470 1A DG Fireproofing Falling from Ceiling 10/14/2019
Documents
Corrective Action 10664853 NRC Observation Concerning Fireproofing falling in 1A 11/15/2019
Documents EDG bldg.
Resulting from
Inspection
Fire Plans 92861-1 Zone 161- Diesel Generator Building Fire Fighting Preplan 4
Procedures 92805-1 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0
2805-2 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0
2806-1 Zone 106 - Control Building - Level 1 Fire Fighting Preplan 2.2
2865-1 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 2.2
Fighting Preplan
Inspection Type Designation Description or Title Revision or
Procedure Date
2865-2 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 0.2
Fighting Preplan
2866-1 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 1.2
Fighting Preplan
2866-2 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 0.2
Fighting Preplan
2883A-1 Zone 183A - Control Building - Level 1 Fire Fighting 1.2
Preplan
2921-1 Zone 601 - Technical Support Center Fire Fighting Preplan 2.2
2922-1 Zone 602 - Technical Support Center Fire Fighting Preplan 3.1
2923-1 Zone 603 Technical Support Center Electrical Equipment 1.2
Room Fire Fighting Preplan
2924-1 Zone 604 Technical Support Center Battery Room Fire 2.2
Fighting Preplan
2925-1 Zone 605 TSC Control Building Level 1 Fire Fighting 2.2
Preplan
71111.06 Calculations X6CXC-17 Flooding Analysis - Outside Areas 11/06/1989
X6CYC-26 Flooding Analysis - Auxiliary Building - Level "C" 10
Corrective Action 10658620,
Documents 10313317,
10645149, 802581,
803980, 10644143
Corrective Action 10658261
Documents
Resulting from
Inspection
Drawings 1X4DB146-2 P&I Diagram - Auxiliary Building & Misc. Drains - System 25.0
No. 1215
1X4DB174-3 P&I Diagram - Fire Protection Water Systems - System 27.0
No. 2301
1X4DB174-4 P&I Diagram - Fire Protection Water Systems - System 25.0
No. 2301
1X4DL57C20 Underground and Aboveground Permanent Facilities [Area 2
C]
Inspection Type Designation Description or Title Revision or
Procedure Date
2X4DB147-1 P&I Diagram - Auxiliary Building Flood Retaining Rooms 18.0
Alarms & Drains - System No. 1218
Miscellaneous DC-1809 Cable Systems 24
Procedures 17061-2 Annunciator Response Procedures for ALB 61 on Process 18.2
Control Panel
NMP-ES-016 Environmental Qualification Program 9.2
71111.11Q Corrective Action 10653959
Documents
Miscellaneous V-RQ-SG-20190930 Loss of 1AA02 / Unit Trip with SAT aligned 09/30/2019
V-RQ-SG-20191009 Paralleling DG1A to RAT 1A 10/09/19
Procedures 13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0
Operations
13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0
Operations
13427A-2 4160V AC Bus 2AA02 1E Electrical Distribution System 8.0
18031-2 Loss of Class 1 E Elect Systems 2.2
NMP-GM-021 Switchyard Access and Maintenance Controls 6.0
NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 1.1
Controls
71111.12 Corrective Action 10638923,
Documents 1050565,
10595737,
1039657, 1042837,
10616255,
10625219
CAR 276396
Engineering NISP-EN-02 Short Form Item Equivalency Evaluation for 3 IN x 4 IN - 0
Evaluations 13 IN Centrifugal Goulds Pump
TE 1044763 TE MREVAL-2HV1668A NSCW Tower Spray Valve will 06/01/2019
not open
Miscellaneous EPRI Report RISC-3 Seismic Assessment Guidelines December
1009669 2004
EPRI Report Program on Technology Innovation: 10CFR50.69 January
1011234 Implementation Guidance for Treatment of Structures, 2006
Inspection Type Designation Description or Title Revision or
Procedure Date
Systems, and Components
RBD-V12-5069-
1609
Procedures NMP-ES-027 Maintenance Rule Program 10
NMP-ES-065-004 10 CFR 50.69 Alternative Treatment Requirements 4.0
SCM-014 10 CFR 50.69 Alternative Treatment Procurement 4.0
71111.13 Drawings 1X4DB163-2 P&I Diagram- Feedwater Heater Drain System, System 15.0
No. 1304 (MSR, No. 6B Htr, Drains)
1X4DB163-4 P&I Diagram- Feedwater Heater Drain System No. 1304 28
(No. 4B, No. 5B, and Htr, Drn, Pump Drns.)
71111.15 Corrective Action 10661268,
Documents 10660735,
10665316,
10661586,
10141719,
10659522
Corrective Action 10670291
Documents
Resulting from
Inspection
Drawings 1X6AU01-00306-7 CONTAINMENT PRESSURE- CABINET 02, CARD 13
FRAME 03
1X6AX01-00428 Master System Schematic Containment Pressure 5
AX3AD01B-00011 Schematic Sh 1 of 2 AMETEK/SCI 400AMP Safety Battery 1.0
Charger
AX3AD01B-00012 Schematic Sh. 2 of 2 AMETEK/SCI 400AMP Safety 1.0
Battery Charger
Procedures 14420-1 Solid State Protection System Train A Operability Test 63
14430-2 NSCW Cooling Tower Fans Monthly Test 10
25732-C Megger Testing Motors 39.0
NMP-AD-031-GL01 Past Operability / Functionality Review 1.0
Work Orders SNC854250,
SNC1059443,
SNC723975
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.18 Calculations REA01-VAA065
Drawings 1X4DB133-2 P&I Diagram Nuclear Service Water System 62
Engineering TCC SNC980101
Changes
Miscellaneous SNC980101 Recommended Procedure Changes to 27012-C Bingham
Williamette Type VCM "NSCW" Pump Removal and
Installation
Procedures 25024-C Pipe Supports 12
27012-C Bingham Wiliamette Type VCM Pump Maintenance 25
Work Orders SNC121344
71111.19 Corrective Action 10658245,
Documents 10658400,
10667344,
10657379
Miscellaneous 1-OL-22-1-DT-1561-
00148
1A1561PipingPen01
System Outage
Fragnet
Procedures 14510B-1 Train B Control Room Emergency Filtration System 7.1
Operability Test
14515A-1 Piping Penetration Area Filtration and Exhaust System 3.2
Operability Test- Train A
14625-1 SSPS Slave Relay K616 Train B Test Safety 19
Injection/Control Room Isolation
14808A-1 Train A Centrifugal Charging Pump and Check Valve IST 8.0
and Response Test
14808B-1 Train B Centrifugal Charging Pump and Check Valve IST 6.3
and Response Time Test
14809B-1 Train B ESF Chilled Water Pump Inservice Test 7.0
14825-2 Quarterly Inservice Valve Test 98.1
290-C Agastat Series 2100 And 7000 Timing Relay Calibration 39
28620-C Safety Related Filter System Carbon Adsorber Sampling 6.0
28625B-1 Train B Control Room Emergency Filtration System 1- 3
Inspection Type Designation Description or Title Revision or
Procedure Date
1531-N7-002-000 Performance Test
28626B-1 Train B Control Room Emergency Filtration System 1- 3.3
1531-N7-002-000 Test
83308-C Testing of Safety-Related NSCW System Coolers 33.3
83308-C Testing of Safety-Related NSCW System Coolers 33.3
Work Orders SNC1011463,
SNC865113,
SNC864983,
SNC736384,
SNC852302,
SNC906549,
SNC999821,
SNC974417,
SNC974697,
SNC975067,
SNC988723
71111.22 Corrective Action 10658708,
Documents 10668056,
10645322,
10642248,
10634251
Drawings 2X4DB131 P&I Diagram - Containment Spray System - System No. 32.0
206
Miscellaneous NEI 12-06 Diverse and Flexible Coping Strategies (FLEX) 4
Implementation Guide
Procedures 14806A-2 Train A Containment Spray Pump IST and Response Time 3.3
Test
14825-2 Quarterly Inservice Valve Test 98.1
83308-C Testing of Safety-Related NSCW System Coolers 33.3
NMP-OS-019-013- Vogtle Flex Equipment Unavailability Tracking Guideline 3.0
GL03
Work Orders SNC903206,
SNC903298,
SNC903299,
Inspection Type Designation Description or Title Revision or
Procedure Date
SNC829192
71114.06 Miscellaneous Emergency Preparedness Drill Report 10/15/2019
Procedures 13427A-1 4160V AC Bus 1AA02 1E Electrical Distribution System 10
18031-1 Loss of Class 1E Elect Systems 1.2
19100-1 ECA - 0.0 Loss of all AC Power 4.2
71151 Drawings 1X3D-BA-D02D Elementary Diagram Electrical System 4160V 13
1NCM.BRKR 152-1AA0219 From Emergency Diesel Gen.
1A
Miscellaneous NRC Mitigating System Performance Index (MSPI) Basis 10
Document
71152 Corrective Action SNC10651125
Documents
Corrective Action 10664627 Small Packing leak on AFW SG1 Supply from MDAFW 'A' 11/14/2019
Documents (2-HV-5139)
Resulting from 10664638 Damaged Conduit support for Loop 4 Bypass Feed Reg 11/14/2019
Inspection Valve
Miscellaneous Firewatch / LCO Status Board as of 11/24/2019
Active Fire watches (1-19-063; 1-19-144; 2-19-122; 2-19- 11/14/2019
24; 2-19-133)
C-2019-15 Missed Fire Watch Stop-Gap Actions 09/18/2019
Procedures NMP-AD-028 5
NMP-ES-035-007 Fleet Fire Watch Instruction 5.0
71153 Corrective Action 10661912
Documents
Drawings AX3D-AA-A03A Vogtle- Wilson Master One Line Diagram 18.0
Procedures 91201-C Activation and Operation of the Technical Support Center 21
NMP-AD-031 SNC Reportability Roles, Responsibilities, and Fleet 9.3
Requirements
NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 05/28/2018
Controls
16|=
=IP 71111.18|count=5}}
The inspectors evaluated the following post maintenance tests:
- (1) Unit 2 Loop 4 Atmospheric Relief Valve (ARV) post-maintenance test following Loop 4 ARV internal valve work and planned maintenance, on October 22, 2019
- (2) Unit 1 Train 'A' Piping Penetration Area Filtration and Exhaust System post maintenance test following planned maintenance, on October 22, 2019
- (3) Unit 1 Train 'B' CREFS post-maintenance test following 1B CREFS 18-month planned maintenance, on October 31, 2019
- (4) Unit 1 Train 'B' CCP post-maintenance test following 1B CCP system planned maintenance, on November 25, 2019
- (5) Unit 1 Train 'A' CCP post-maintenance test following 1A CCP system planned maintenance outage, on December 11, 2019
71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Surveillance Tests (other) (IP Section 03.01)
Main article: IP 71111.22
- (1) 14806A-2, Unit 2 Train 'A' Containment Spray Pump Inservice Test (IST) and Response Time Test; and 14825-2, [Unit 2 Containment Spray Valves] Quarterly IST, on October 24, 2019
- (2) 14690B-1, Unit 1 Train 'B' CCP Quarterly IST, on October 29, 2019
FLEX Testing (IP Section 03.02) (1 Sample)
- (1) 2800-A2800G4012, Common FLEX 480V Diesel Generator Functional Tests and Inspections, on December 10, 2019
71114.06 - Drill Evaluation Drill/Training Evolution Observation (IP Section 03.02)
Main article: IP 71114.06
The inspectors evaluated:
- (1) The inspectors observed an emergency preparedness drill that focused on a steam generator tube rupture concurrent with a station blackout event, on October 15,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicator submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (October 1, 2018 to September 30, 2019)
- (2) Unit 2 (October 1, 2018 to September 30, 2019)
71152 - Problem Identification and Resolution Semiannual Trend Review (IP Section 02.02)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the performance of fire watches that might be indicative of a more significant safety issue.
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Part 21 Evaluation of Eaton A200 and Freedom Series Contactors, CR 10651125.
71153 - Followup of Events and Notices of Enforcement Discretion Reporting (IP Section 03.05)
- (1) Reportability Evaluation of Non-functional TSC Heating, Ventilation, and Air-conditioning Chiller, on November 5,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- (1) The inspectors evaluated the licensees activities related to monitoring of dry cask storage on the Independent Spent Fuel Storage Installation pad.
INSPECTION RESULTS
Observation: Semi-annual Trend Review Associated with Missed Fire Watches 71152 During a semi-annual trend review, the inspectors noted an increased trend in missed fire protection watches. Specifically, during their review of fire watch logs for both units, the inspectors identified examples where hourly fire watches were not completed within the 60 to 75 minutes allotted by procedure. The inspectors discussed their observations with the licensee and interviewed Operations personnel regarding the missed fire watches. During the interview, the inspectors learned that the missed fire watches had been previously identified by the licensee and corrective actions were implemented as a result. One of the causes identified was attributed to changes in contractors responsible for implementation of the fire watches. The corrective actions taken to address the causes included coaching and implementation of a standing order to reinforce the requirements for performing fire watches within the specified time frame. In addition, the inspectors performed a review of fire watches conducted after implementation of the licensee's corrective actions, and while the inspectors did not identify additional examples of missed fire watches, the inspectors noted the need for continued monitoring and trending in this area due to the licensee's intent to change fire watch contractors in the near future.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 17, 2020, the inspectors presented the integrated inspection results to Mr. Keith Taber and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.01 Corrective Action 10673494,
Documents 10673371,
10666777,
10666930,
10666334
Corrective Action 106743242
Documents
Resulting from
Inspection
Miscellaneous Site Certification for Winter Readiness 11/15/19
Procedures 11877-1 Cold Weather Checklist 26.2
11877-2 Cold Weather Checklist 22.2
11901-1 Heat Tracing System Alignment 19
13901-2 Heat Tracing System 10.1
NMP-GM-025 Seasonal Readiness Process 5.2
71111.04S Drawings 1X4DB133-1 P&I Diagram - Nuclear Service Cooling Water System - 56.0
System No. 1202
1X4DB133-2 P&I Diagram - Nuclear Service Cooling Water System - 62.0
System No. 1202
Procedures 11150-1 Nuclear Service Cooling Water System Alignment 18
71111.05Q Corrective Action 10655470 1A DG Fireproofing Falling from Ceiling 10/14/2019
Documents
Corrective Action 10664853 NRC Observation Concerning Fireproofing falling in 1A 11/15/2019
Documents EDG bldg.
Resulting from
Inspection
Fire Plans 92861-1 Zone 161- Diesel Generator Building Fire Fighting Preplan 4
Procedures 92805-1 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0
2805-2 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0
2806-1 Zone 106 - Control Building - Level 1 Fire Fighting Preplan 2.2
2865-1 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 2.2
Fighting Preplan
Inspection Type Designation Description or Title Revision or
Procedure Date
2865-2 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 0.2
Fighting Preplan
2866-1 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 1.2
Fighting Preplan
2866-2 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 0.2
Fighting Preplan
2883A-1 Zone 183A - Control Building - Level 1 Fire Fighting 1.2
Preplan
2921-1 Zone 601 - Technical Support Center Fire Fighting Preplan 2.2
2922-1 Zone 602 - Technical Support Center Fire Fighting Preplan 3.1
2923-1 Zone 603 Technical Support Center Electrical Equipment 1.2
Room Fire Fighting Preplan
2924-1 Zone 604 Technical Support Center Battery Room Fire 2.2
Fighting Preplan
2925-1 Zone 605 TSC Control Building Level 1 Fire Fighting 2.2
Preplan
71111.06 Calculations X6CXC-17 Flooding Analysis - Outside Areas 11/06/1989
X6CYC-26 Flooding Analysis - Auxiliary Building - Level "C" 10
Corrective Action 10658620,
Documents 10313317,
10645149, 802581,
803980, 10644143
Corrective Action 10658261
Documents
Resulting from
Inspection
Drawings 1X4DB146-2 P&I Diagram - Auxiliary Building & Misc. Drains - System 25.0
No. 1215
1X4DB174-3 P&I Diagram - Fire Protection Water Systems - System 27.0
No. 2301
1X4DB174-4 P&I Diagram - Fire Protection Water Systems - System 25.0
No. 2301
1X4DL57C20 Underground and Aboveground Permanent Facilities [Area 2
C]
Inspection Type Designation Description or Title Revision or
Procedure Date
2X4DB147-1 P&I Diagram - Auxiliary Building Flood Retaining Rooms 18.0
Alarms & Drains - System No. 1218
Miscellaneous DC-1809 Cable Systems 24
Procedures 17061-2 Annunciator Response Procedures for ALB 61 on Process 18.2
Control Panel
NMP-ES-016 Environmental Qualification Program 9.2
71111.11Q Corrective Action 10653959
Documents
Miscellaneous V-RQ-SG-20190930 Loss of 1AA02 / Unit Trip with SAT aligned 09/30/2019
V-RQ-SG-20191009 Paralleling DG1A to RAT 1A 10/09/19
Procedures 13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0
Operations
13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0
Operations
13427A-2 4160V AC Bus 2AA02 1E Electrical Distribution System 8.0
18031-2 Loss of Class 1 E Elect Systems 2.2
NMP-GM-021 Switchyard Access and Maintenance Controls 6.0
NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 1.1
Controls
71111.12 Corrective Action 10638923,
Documents 1050565,
10595737,
1039657, 1042837,
10616255,
10625219
CAR 276396
Engineering NISP-EN-02 Short Form Item Equivalency Evaluation for 3 IN x 4 IN - 0
Evaluations 13 IN Centrifugal Goulds Pump
TE 1044763 TE MREVAL-2HV1668A NSCW Tower Spray Valve will 06/01/2019
not open
Miscellaneous EPRI Report RISC-3 Seismic Assessment Guidelines December
1009669 2004
EPRI Report Program on Technology Innovation: 10CFR50.69 January
1011234 Implementation Guidance for Treatment of Structures, 2006
Inspection Type Designation Description or Title Revision or
Procedure Date
Systems, and Components
RBD-V12-5069-
1609
Procedures NMP-ES-027 Maintenance Rule Program 10
NMP-ES-065-004 10 CFR 50.69 Alternative Treatment Requirements 4.0
SCM-014 10 CFR 50.69 Alternative Treatment Procurement 4.0
71111.13 Drawings 1X4DB163-2 P&I Diagram- Feedwater Heater Drain System, System 15.0
No. 1304 (MSR, No. 6B Htr, Drains)
1X4DB163-4 P&I Diagram- Feedwater Heater Drain System No. 1304 28
(No. 4B, No. 5B, and Htr, Drn, Pump Drns.)
71111.15 Corrective Action 10661268,
Documents 10660735,
10665316,
10661586,
10141719,
10659522
Corrective Action 10670291
Documents
Resulting from
Inspection
Drawings 1X6AU01-00306-7 CONTAINMENT PRESSURE- CABINET 02, CARD 13
FRAME 03
1X6AX01-00428 Master System Schematic Containment Pressure 5
AX3AD01B-00011 Schematic Sh 1 of 2 AMETEK/SCI 400AMP Safety Battery 1.0
Charger
AX3AD01B-00012 Schematic Sh. 2 of 2 AMETEK/SCI 400AMP Safety 1.0
Battery Charger
Procedures 14420-1 Solid State Protection System Train A Operability Test 63
14430-2 NSCW Cooling Tower Fans Monthly Test 10
25732-C Megger Testing Motors 39.0
NMP-AD-031-GL01 Past Operability / Functionality Review 1.0
Work Orders SNC854250,
SNC1059443,
SNC723975
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.18 Calculations REA01-VAA065
Drawings 1X4DB133-2 P&I Diagram Nuclear Service Water System 62
Engineering TCC SNC980101
Changes
Miscellaneous SNC980101 Recommended Procedure Changes to 27012-C Bingham
Williamette Type VCM "NSCW" Pump Removal and
Installation
Procedures 25024-C Pipe Supports 12
27012-C Bingham Wiliamette Type VCM Pump Maintenance 25
Work Orders SNC121344
71111.19 Corrective Action 10658245,
Documents 10658400,
10667344,
10657379
Miscellaneous 1-OL-22-1-DT-1561-
00148
1A1561PipingPen01
System Outage
Fragnet
Procedures 14510B-1 Train B Control Room Emergency Filtration System 7.1
Operability Test
14515A-1 Piping Penetration Area Filtration and Exhaust System 3.2
Operability Test- Train A
14625-1 SSPS Slave Relay K616 Train B Test Safety 19
Injection/Control Room Isolation
14808A-1 Train A Centrifugal Charging Pump and Check Valve IST 8.0
and Response Test
14808B-1 Train B Centrifugal Charging Pump and Check Valve IST 6.3
and Response Time Test
14809B-1 Train B ESF Chilled Water Pump Inservice Test 7.0
14825-2 Quarterly Inservice Valve Test 98.1
290-C Agastat Series 2100 And 7000 Timing Relay Calibration 39
28620-C Safety Related Filter System Carbon Adsorber Sampling 6.0
28625B-1 Train B Control Room Emergency Filtration System 1- 3
Inspection Type Designation Description or Title Revision or
Procedure Date
1531-N7-002-000 Performance Test
28626B-1 Train B Control Room Emergency Filtration System 1- 3.3
1531-N7-002-000 Test
83308-C Testing of Safety-Related NSCW System Coolers 33.3
83308-C Testing of Safety-Related NSCW System Coolers 33.3
Work Orders SNC1011463,
SNC865113,
SNC864983,
SNC736384,
SNC852302,
SNC906549,
SNC999821,
SNC974417,
SNC974697,
SNC975067,
SNC988723
71111.22 Corrective Action 10658708,
Documents 10668056,
10645322,
10642248,
10634251
Drawings 2X4DB131 P&I Diagram - Containment Spray System - System No. 32.0
206
Miscellaneous NEI 12-06 Diverse and Flexible Coping Strategies (FLEX) 4
Implementation Guide
Procedures 14806A-2 Train A Containment Spray Pump IST and Response Time 3.3
Test
14825-2 Quarterly Inservice Valve Test 98.1
83308-C Testing of Safety-Related NSCW System Coolers 33.3
NMP-OS-019-013- Vogtle Flex Equipment Unavailability Tracking Guideline 3.0
GL03
Work Orders SNC903206,
SNC903298,
SNC903299,
Inspection Type Designation Description or Title Revision or
Procedure Date
SNC829192
71114.06 Miscellaneous Emergency Preparedness Drill Report 10/15/2019
Procedures 13427A-1 4160V AC Bus 1AA02 1E Electrical Distribution System 10
18031-1 Loss of Class 1E Elect Systems 1.2
19100-1 ECA - 0.0 Loss of all AC Power 4.2
71151 Drawings 1X3D-BA-D02D Elementary Diagram Electrical System 4160V 13
1NCM.BRKR 152-1AA0219 From Emergency Diesel Gen.
1A
Miscellaneous NRC Mitigating System Performance Index (MSPI) Basis 10
Document
71152 Corrective Action SNC10651125
Documents
Corrective Action 10664627 Small Packing leak on AFW SG1 Supply from MDAFW 'A' 11/14/2019
Documents (2-HV-5139)
Resulting from 10664638 Damaged Conduit support for Loop 4 Bypass Feed Reg 11/14/2019
Inspection Valve
Miscellaneous Firewatch / LCO Status Board as of 11/24/2019
Active Fire watches (1-19-063; 1-19-144; 2-19-122; 2-19- 11/14/2019
24; 2-19-133)
C-2019-15 Missed Fire Watch Stop-Gap Actions 09/18/2019
Procedures NMP-AD-028 5
NMP-ES-035-007 Fleet Fire Watch Instruction 5.0
71153 Corrective Action 10661912
Documents
Drawings AX3D-AA-A03A Vogtle- Wilson Master One Line Diagram 18.0
Procedures 91201-C Activation and Operation of the Technical Support Center 21
NMP-AD-031 SNC Reportability Roles, Responsibilities, and Fleet 9.3
Requirements
NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 05/28/2018
Controls
16]] [[IP sample::=
=IP 71111.18|count=5}}
The inspectors evaluated the following post maintenance tests:
- (1) Unit 2 Loop 4 Atmospheric Relief Valve (ARV) post-maintenance test following Loop 4 ARV internal valve work and planned maintenance, on October 22, 2019
- (2) Unit 1 Train 'A' Piping Penetration Area Filtration and Exhaust System post maintenance test following planned maintenance, on October 22, 2019
- (3) Unit 1 Train 'B' CREFS post-maintenance test following 1B CREFS 18-month planned maintenance, on October 31, 2019
- (4) Unit 1 Train 'B' CCP post-maintenance test following 1B CCP system planned maintenance, on November 25, 2019
- (5) Unit 1 Train 'A' CCP post-maintenance test following 1A CCP system planned maintenance outage, on December 11, 2019
71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Surveillance Tests (other) (IP Section 03.01)
Main article: IP 71111.22
- (1) 14806A-2, Unit 2 Train 'A' Containment Spray Pump Inservice Test (IST) and Response Time Test; and 14825-2, [Unit 2 Containment Spray Valves] Quarterly IST, on October 24, 2019
- (2) 14690B-1, Unit 1 Train 'B' CCP Quarterly IST, on October 29, 2019
FLEX Testing (IP Section 03.02) (1 Sample)
- (1) 2800-A2800G4012, Common FLEX 480V Diesel Generator Functional Tests and Inspections, on December 10, 2019
71114.06 - Drill Evaluation Drill/Training Evolution Observation (IP Section 03.02)
Main article: IP 71114.06
The inspectors evaluated:
- (1) The inspectors observed an emergency preparedness drill that focused on a steam generator tube rupture concurrent with a station blackout event, on October 15,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicator submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)
- (1) Unit 1 (October 1, 2018 - September 30, 2019)
- (2) Unit 2 (October 1, 2018 - September 30, 2019)
MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)
- (1) Unit 1 (October 1, 2018 to September 30, 2019)
- (2) Unit 2 (October 1, 2018 to September 30, 2019)
71152 - Problem Identification and Resolution Semiannual Trend Review (IP Section 02.02)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends in the performance of fire watches that might be indicative of a more significant safety issue.
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Part 21 Evaluation of Eaton A200 and Freedom Series Contactors, CR 10651125.
71153 - Followup of Events and Notices of Enforcement Discretion Reporting (IP Section 03.05)
- (1) Reportability Evaluation of Non-functional TSC Heating, Ventilation, and Air-conditioning Chiller, on November 5,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- (1) The inspectors evaluated the licensees activities related to monitoring of dry cask storage on the Independent Spent Fuel Storage Installation pad.
INSPECTION RESULTS
Observation: Semi-annual Trend Review Associated with Missed Fire Watches 71152 During a semi-annual trend review, the inspectors noted an increased trend in missed fire protection watches. Specifically, during their review of fire watch logs for both units, the inspectors identified examples where hourly fire watches were not completed within the 60 to 75 minutes allotted by procedure. The inspectors discussed their observations with the licensee and interviewed Operations personnel regarding the missed fire watches. During the interview, the inspectors learned that the missed fire watches had been previously identified by the licensee and corrective actions were implemented as a result. One of the causes identified was attributed to changes in contractors responsible for implementation of the fire watches. The corrective actions taken to address the causes included coaching and implementation of a standing order to reinforce the requirements for performing fire watches within the specified time frame. In addition, the inspectors performed a review of fire watches conducted after implementation of the licensee's corrective actions, and while the inspectors did not identify additional examples of missed fire watches, the inspectors noted the need for continued monitoring and trending in this area due to the licensee's intent to change fire watch contractors in the near future.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 17, 2020, the inspectors presented the integrated inspection results to Mr. Keith Taber and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.01 Corrective Action 10673494,
Documents 10673371,
10666777,
10666930,
10666334
Corrective Action 106743242
Documents
Resulting from
Inspection
Miscellaneous Site Certification for Winter Readiness 11/15/19
Procedures 11877-1 Cold Weather Checklist 26.2
11877-2 Cold Weather Checklist 22.2
11901-1 Heat Tracing System Alignment 19
13901-2 Heat Tracing System 10.1
NMP-GM-025 Seasonal Readiness Process 5.2
71111.04S Drawings 1X4DB133-1 P&I Diagram - Nuclear Service Cooling Water System - 56.0
System No. 1202
1X4DB133-2 P&I Diagram - Nuclear Service Cooling Water System - 62.0
System No. 1202
Procedures 11150-1 Nuclear Service Cooling Water System Alignment 18
71111.05Q Corrective Action 10655470 1A DG Fireproofing Falling from Ceiling 10/14/2019
Documents
Corrective Action 10664853 NRC Observation Concerning Fireproofing falling in 1A 11/15/2019
Documents EDG bldg.
Resulting from
Inspection
Fire Plans 92861-1 Zone 161- Diesel Generator Building Fire Fighting Preplan 4
Procedures 92805-1 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0
2805-2 Zone 105 - Control Building - Level 1 Fire Fighting Preplan 6.0
2806-1 Zone 106 - Control Building - Level 1 Fire Fighting Preplan 2.2
2865-1 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 2.2
Fighting Preplan
Inspection Type Designation Description or Title Revision or
Procedure Date
2865-2 Zone 165 - Diesel Generator Tanks and Pumphouse Fire 0.2
Fighting Preplan
2866-1 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 1.2
Fighting Preplan
2866-2 Zone 166 - Diesel Generator Tanks and Pumphouse Fire 0.2
Fighting Preplan
2883A-1 Zone 183A - Control Building - Level 1 Fire Fighting 1.2
Preplan
2921-1 Zone 601 - Technical Support Center Fire Fighting Preplan 2.2
2922-1 Zone 602 - Technical Support Center Fire Fighting Preplan 3.1
2923-1 Zone 603 Technical Support Center Electrical Equipment 1.2
Room Fire Fighting Preplan
2924-1 Zone 604 Technical Support Center Battery Room Fire 2.2
Fighting Preplan
2925-1 Zone 605 TSC Control Building Level 1 Fire Fighting 2.2
Preplan
71111.06 Calculations X6CXC-17 Flooding Analysis - Outside Areas 11/06/1989
X6CYC-26 Flooding Analysis - Auxiliary Building - Level "C" 10
Corrective Action 10658620,
Documents 10313317,
10645149, 802581,
803980, 10644143
Corrective Action 10658261
Documents
Resulting from
Inspection
Drawings 1X4DB146-2 P&I Diagram - Auxiliary Building & Misc. Drains - System 25.0
No. 1215
1X4DB174-3 P&I Diagram - Fire Protection Water Systems - System 27.0
No. 2301
1X4DB174-4 P&I Diagram - Fire Protection Water Systems - System 25.0
No. 2301
1X4DL57C20 Underground and Aboveground Permanent Facilities [Area 2
C]
Inspection Type Designation Description or Title Revision or
Procedure Date
2X4DB147-1 P&I Diagram - Auxiliary Building Flood Retaining Rooms 18.0
Alarms & Drains - System No. 1218
Miscellaneous DC-1809 Cable Systems 24
Procedures 17061-2 Annunciator Response Procedures for ALB 61 on Process 18.2
Control Panel
NMP-ES-016 Environmental Qualification Program 9.2
71111.11Q Corrective Action 10653959
Documents
Miscellaneous V-RQ-SG-20190930 Loss of 1AA02 / Unit Trip with SAT aligned 09/30/2019
V-RQ-SG-20191009 Paralleling DG1A to RAT 1A 10/09/19
Procedures 13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0
Operations
13418A-2 Standby Auxiliary Transformer Unit Two Train A 7.0
Operations
13427A-2 4160V AC Bus 2AA02 1E Electrical Distribution System 8.0
18031-2 Loss of Class 1 E Elect Systems 2.2
NMP-GM-021 Switchyard Access and Maintenance Controls 6.0
NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 1.1
Controls
71111.12 Corrective Action 10638923,
Documents 1050565,
10595737,
1039657, 1042837,
10616255,
10625219
CAR 276396
Engineering NISP-EN-02 Short Form Item Equivalency Evaluation for 3 IN x 4 IN - 0
Evaluations 13 IN Centrifugal Goulds Pump
TE 1044763 TE MREVAL-2HV1668A NSCW Tower Spray Valve will 06/01/2019
not open
Miscellaneous EPRI Report RISC-3 Seismic Assessment Guidelines December
1009669 2004
EPRI Report Program on Technology Innovation: 10CFR50.69 January
1011234 Implementation Guidance for Treatment of Structures, 2006
Inspection Type Designation Description or Title Revision or
Procedure Date
Systems, and Components
RBD-V12-5069-
1609
Procedures NMP-ES-027 Maintenance Rule Program 10
NMP-ES-065-004 10 CFR 50.69 Alternative Treatment Requirements 4.0
SCM-014 10 CFR 50.69 Alternative Treatment Procurement 4.0
71111.13 Drawings 1X4DB163-2 P&I Diagram- Feedwater Heater Drain System, System 15.0
No. 1304 (MSR, No. 6B Htr, Drains)
1X4DB163-4 P&I Diagram- Feedwater Heater Drain System No. 1304 28
(No. 4B, No. 5B, and Htr, Drn, Pump Drns.)
71111.15 Corrective Action 10661268,
Documents 10660735,
10665316,
10661586,
10141719,
10659522
Corrective Action 10670291
Documents
Resulting from
Inspection
Drawings 1X6AU01-00306-7 CONTAINMENT PRESSURE- CABINET 02, CARD 13
FRAME 03
1X6AX01-00428 Master System Schematic Containment Pressure 5
AX3AD01B-00011 Schematic Sh 1 of 2 AMETEK/SCI 400AMP Safety Battery 1.0
Charger
AX3AD01B-00012 Schematic Sh. 2 of 2 AMETEK/SCI 400AMP Safety 1.0
Battery Charger
Procedures 14420-1 Solid State Protection System Train A Operability Test 63
14430-2 NSCW Cooling Tower Fans Monthly Test 10
25732-C Megger Testing Motors 39.0
NMP-AD-031-GL01 Past Operability / Functionality Review 1.0
Work Orders SNC854250,
SNC1059443,
SNC723975
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.18 Calculations REA01-VAA065
Drawings 1X4DB133-2 P&I Diagram Nuclear Service Water System 62
Engineering TCC SNC980101
Changes
Miscellaneous SNC980101 Recommended Procedure Changes to 27012-C Bingham
Williamette Type VCM "NSCW" Pump Removal and
Installation
Procedures 25024-C Pipe Supports 12
27012-C Bingham Wiliamette Type VCM Pump Maintenance 25
Work Orders SNC121344
71111.19 Corrective Action 10658245,
Documents 10658400,
10667344,
10657379
Miscellaneous 1-OL-22-1-DT-1561-
00148
1A1561PipingPen01
System Outage
Fragnet
Procedures 14510B-1 Train B Control Room Emergency Filtration System 7.1
Operability Test
14515A-1 Piping Penetration Area Filtration and Exhaust System 3.2
Operability Test- Train A
14625-1 SSPS Slave Relay K616 Train B Test Safety 19
Injection/Control Room Isolation
14808A-1 Train A Centrifugal Charging Pump and Check Valve IST 8.0
and Response Test
14808B-1 Train B Centrifugal Charging Pump and Check Valve IST 6.3
and Response Time Test
14809B-1 Train B ESF Chilled Water Pump Inservice Test 7.0
14825-2 Quarterly Inservice Valve Test 98.1
290-C Agastat Series 2100 And 7000 Timing Relay Calibration 39
28620-C Safety Related Filter System Carbon Adsorber Sampling 6.0
28625B-1 Train B Control Room Emergency Filtration System 1- 3
Inspection Type Designation Description or Title Revision or
Procedure Date
1531-N7-002-000 Performance Test
28626B-1 Train B Control Room Emergency Filtration System 1- 3.3
1531-N7-002-000 Test
83308-C Testing of Safety-Related NSCW System Coolers 33.3
83308-C Testing of Safety-Related NSCW System Coolers 33.3
Work Orders SNC1011463,
SNC865113,
SNC864983,
SNC736384,
SNC852302,
SNC906549,
SNC999821,
SNC974417,
SNC974697,
SNC975067,
SNC988723
71111.22 Corrective Action 10658708,
Documents 10668056,
10645322,
10642248,
10634251
Drawings 2X4DB131 P&I Diagram - Containment Spray System - System No. 32.0
206
Miscellaneous NEI 12-06 Diverse and Flexible Coping Strategies (FLEX) 4
Implementation Guide
Procedures 14806A-2 Train A Containment Spray Pump IST and Response Time 3.3
Test
14825-2 Quarterly Inservice Valve Test 98.1
83308-C Testing of Safety-Related NSCW System Coolers 33.3
NMP-OS-019-013- Vogtle Flex Equipment Unavailability Tracking Guideline 3.0
GL03
Work Orders SNC903206,
SNC903298,
SNC903299,
Inspection Type Designation Description or Title Revision or
Procedure Date
SNC829192
71114.06 Miscellaneous Emergency Preparedness Drill Report 10/15/2019
Procedures 13427A-1 4160V AC Bus 1AA02 1E Electrical Distribution System 10
18031-1 Loss of Class 1E Elect Systems 1.2
19100-1 ECA - 0.0 Loss of all AC Power 4.2
71151 Drawings 1X3D-BA-D02D Elementary Diagram Electrical System 4160V 13
1NCM.BRKR 152-1AA0219 From Emergency Diesel Gen.
1A
Miscellaneous NRC Mitigating System Performance Index (MSPI) Basis 10
Document
71152 Corrective Action SNC10651125
Documents
Corrective Action 10664627 Small Packing leak on AFW SG1 Supply from MDAFW 'A' 11/14/2019
Documents (2-HV-5139)
Resulting from 10664638 Damaged Conduit support for Loop 4 Bypass Feed Reg 11/14/2019
Inspection Valve
Miscellaneous Firewatch / LCO Status Board as of 11/24/2019
Active Fire watches (1-19-063; 1-19-144; 2-19-122; 2-19- 11/14/2019
24; 2-19-133)
C-2019-15 Missed Fire Watch Stop-Gap Actions 09/18/2019
Procedures NMP-AD-028 5
NMP-ES-035-007 Fleet Fire Watch Instruction 5.0
71153 Corrective Action 10661912
Documents
Drawings AX3D-AA-A03A Vogtle- Wilson Master One Line Diagram 18.0
Procedures 91201-C Activation and Operation of the Technical Support Center 21
NMP-AD-031 SNC Reportability Roles, Responsibilities, and Fleet 9.3
Requirements
NMP-GM-021-003 Plant Vogtle 1-2 Switchyard Access and Maintenance 05/28/2018
Controls