IE Insp Repts 50-413/79-09 & 50-414/79-09 on 790508-0511.No Noncompliance Noted.Major Areas Inspected:Electrical Work & Work Activities,Quality Records & Instrumentation Storage
ML19241B027
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/24/1979
From: Bryant J, Gibbons T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19241B019 List:
References
50-413-79-09, 50-413-79-9, 50-414-79-09, 50-414-79-9, NUDOCS 7907110568
Download: ML19241B027 (3)


Text

..

.

o UNITED ST AES

+

$

,"'.gf(t 8 \\

,,

NUCLEAR REGULATOhY COMMISSION

'

pf $

REGION 11 101 M ARIETT A sT., N.W., sulTE 3100

%.'.w. Q.. e8 o

"

AT LANT A, GEORGI A 30303

<

Report Nos. 50-413/79-9 and 50-414/79-9 Licensee: Duke Power Company 422 S. Church Street Charlotte, North Carolina Facility Name:

Catawba Nuclear Plant, Units 1 and 2 Docket Nos. 50-413 and 50-414 License Nos.

CPPR-116 and CPPR-117 Inspection at Catawba Site near Rockhill, South Carolina Inspector:

hMw f /NM

-

T. y GibborrV

[

Dste' Signed

'

Approved by.

f'//f Jo/

/

J. g. Bryant,G$ection Chief, RCES Branch Dite Signed SUMMARY Inspection on May 8-11, 1979 Areas Inspected This routine unannounced inspection involved 29 inspector-hours onsite in the areas of electrical work and work activities, quality records, and instrumentation storage.

Results Of the areas inspected, no apparent items of noncompliance or deviations were identified.

014 7907110,f6 7

@

.

.

DETAILS 1.

Persons Contacted Licensee Employees D. Beam, Project Manager

  • D. L. Freeze, Project Fngineer
  • R. A. Morgan, Senio-QA Engineer
  • L.

R. Loci-nn. Senior QC Engineer

  • H. D. Mason, QA Engineer
  • Attended exit inte rview.

2.

Exit Interview The inspection scope and findings were summarized on May 11, 1979, with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Ipdependent Inspection Effort The inspector examined the warehouse storage areas used for instrumentation and electrical equipment.

The in place installation and storage of the emergency diesel generator and the installation of the safety-related cable tray system in the auxiliary building was observed. The Duke Transmissions Department electrical instrument test procedures manual was reviewed. This manual includes procedures for the setting of relays and the calibration of electrical instrumentation.

Within the areas examined, there were no items of noncompliance or deviations identified.

6.

Electrical (Components and Systems) Review of Quality Records (Unit 1)

Ten conconforming item (NCI) reports were selected for a review to assure that the requirements of Duke Power Company's (DPC) NCI procedure Q1 were being complied with in the areas of current status, legibility, review of QC, retreivability and corrective action. The NCI's reviewed were 4953, 4907, 4667, 4657, 4649, 4618, 4970, 3996, 3953, and 3952.

312 015

..

..

'

-2-The training and certification records of five inspectors and three QA dnalySts were reviewed to establish that they were complete and current.

The records confirm that the individuals are qualified for the duties they perform.

Within the areas examined, there were no items of noncompliance or deviaticas identified.

7.

Electrical (Components and Systems) Observation of Work and Work A.

_.it es (Unit 1)

The inspector selected the following items for examination to assure that the requirements of DPC's Quality Assurance Manual (QAM) procedures P1, P3, Q1, J1 and M41 which cover receiving inspection, storage, installation inspection, protection, nonconformance control, and qualification of inspectors were being followed.

a.

120 Volt DC Battery IEBA b.

120 Volt DC Bus IEDA c.

120 Volt DC Distributor IEPA d.

120 Volt DC Battery Charger IECA e.

120 Volt DC to AC Inverter IEIA f.

120 Volt Vital AC Distributor 1ERPA Within the areas examined, there were no items of noncompliance or deviations identified.

8.

Electrical (Components and Systems) Review of Quality Records (Unit 1)

The inspector selected the equipment identified in paragraph 7 for a quality records review to assure that the DPC QAM procedures were being followed in the areas of receipt inspection, certification system, storage inspection, handling, cleanliness, installation inspection and protection.

Eleven NCI's were selected to assure compliance with the procedural require-ments for status legibility, completeness, QC review, retrievability and corrective action status.

NCI's selected were 4332, 4327, 4316, 4315, 4314, 4312, 4311, 4566, 4557, 4553, and 4584.

Within the areas examined, there were no items af noncompliance or deviations identified.