Text
, .
[ga asc
o
'o,
UNITED STATES
E'
'n
NUCLEAR REGULATORY COMMISSION
'
s ,q
.
S
REGION 11
$
. ' . ,
'
o-
~
101 MARIETT A sT., N.W., sull E 3100
g
ATLANT A, GEORGI A 30303
'
- ...
In Reply Refer To:
g 34g
RII TDG
V79-9
50-4?4/79-9
Duke Power Company
Atta:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by T. D. Gibbons of this office
on May 8-11, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-ll6 and CPPR-1.17 for the Catawba Nuclear Plant facility,
Units 1 and 2, and to the discussion of our findings held with D. L.
Freeze at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and reprecentative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Tit 1.
10, C,3de of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the h7C's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such informition f rom public disclosure. Any such application must
include a full statement oi the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
yt 2
012
7007110.,66 3
@
. .
&!AY 24 gg
.
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
n -
/
a
Charles E. Mu phy,
ief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-413/79-9
and 50-414/79-9
cc w/ enclosures:
D. G. Beam, Project Manager
Post Office Box 223
Clover, South Carolina 29710
I
y12
00