IR 05000413/1979019

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-413/79-19 & 50-414/79-19 on 791009-12.No Noncompliance Noted.Major Areas inspected:safety-related 4160-volt switchgear,600-volt Load Ctr & 600 Motor Control Ctr Installation & Quality Records
ML19211A422
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/08/1979
From: Conlon T, Walters D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19211A423 List:
References
50-413-79-19, 50-414-79-19, NUDOCS 7912180174
Download: ML19211A422 (4)


Text

.

.

.

'o, UNITED STATES

3 NUCLEAR REGULATORY COMMISSION

{

. Aj/,<,

'

E REGION il

o,,

[

101 MARIETTA ST N.W.. SUITE 3100

%./

ATLANTA, GEORGIA 30303 o

NOV - 81979 Report Nos. 50-413/79-19 and 50-414/79-19 Licensee: Duke Power Company 422 South Church Street Charlotte, North Carolina 28242 Facility Name:

Catawba Nuclear Station

' Docket Nos. 50-413 and 50-414 License Nos. CPPR-116 and CPPR-117 Inspection at Catawba site near Rock Hill, South Carolina Inspector:

/

/

'

/ / - s'- 7'i D. K! WaltersI Date Signed Approved b p

w

// - B*- 7 9 T. E. Conlon, Section Chief, RC&ES Branch Date Signed SUMMARY Inspection on October 9-12.. 1979 Areas Inspected This routine unannounced inspection involved 29 inspector-hours onsite in the areas of safety-related 4160 volt switchgear, 600 volt load center and 600 motor control center installation and qualtiy records; follow-up inspection of inspector follow-up item 413/79-16-01 and unresolved item 413/79-16-02.

Results Of the areas inspected, no apparent items of noncompliance or deviations were identified.

1599 071 7912180/7i

.

.

.

.

DETAIL 3 1.

Persons Contacted Licensee Employees

  • S. W. Dressler, Senior Construction Engineer
  • L. R. Davison, Senior QC Engineer
  • J. W. Rowell, Electrical Construction Engineer
  • H. D. Mason, QA Engineer
  • R. A. Morgan, Senior QA Engineer
  • J. W. Cox, Licensing and Projects Engineer, Steam M. R. Bove, Assistant QA Engineer J. M. Surratt, Assistant, Design Engineer L. A. Lecares, Assistant Design Engineer T. Moleff, Assistant Design Engineex Other licensee employees contacted included 2 construction craftsmen and 2 QC inspectors.
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on October 12, 1979, with those persons indicated in Paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings (0 pen) Unresolved item 413/79-16-02, Cable tray hangers not installed per drawings. The licensee has issued Nonconforming Item Reports (NIR) 6358, 6370, 6371 and 6396 concerning this item. The scope of each of the NIR;s is as follows:

NIR 6358 documents the installation of a 3/8" x 6" x 10" steel plate a.

on hanger 1 HA5C in lieu of a 3/8" x 7" x 10" plate as required by drawing CN-1903-04, R7.

Evaluation / disposition of the NIR has not been completed.

b.

NIR 6370 documents three longitudinal brace connections on hanger 1 HA6C as not being per the requirements of detail "B", HS-58 of drawing CN-1903-05, R3.

This item was identified by the licensee during subsequent inspection of the hanger 1 HA6C installation. The incorrect installation has been attributed to a dimensional error in the location of the unistrut fittings connecting the rungs to the hanger legs on HS-57 of the design drawings which prevented installation per detail

"B" HS-58.

Variation Notice (VN) 7225 has been issued to correct the drawings and allow Jongitudinal brace installation per detail "B",

HS-58.

NIR corrective action requires hanger rework per VN 7225 and reinspection.

The licensee's corrective action has not been completed for NIR 6370.

1599 072

.

-2-

.

NIR 6371 documents conflicting measurement requirements between drawings c.

CN-1903-05, R3 and CN-1893-05, R7.

Drawing CN-1903-05 requires lengths L2, L3 and L4, of hanger 1 HA6C to be 5'-6", and drawing CN-1893-05 requires L2, L3 and L4 to be 5'-8".

Additionally, drawing CN-1893-05 requires L1 to be 3'-6" whereas the installed L1 is 3'-8".

L1 exceeds the plus or minus 1" tolerance specified by note 18 of CN-1903-01, R13.

Licensee evaluation / disposition of NIR 6371 has not been completed.

d.

NIR 6396 documents installation of hangers 1 HASC and 1 HA6C as not being per de rign drawing requirements altuough QC inspections per procedure Ci-301 had been completed. Although not completed, NIR 6396 corrective actions are as follows.

(1) Revise QA procedure M-41B, serial number 2, to document individual hanger inspections.

(2) Revise procedure CP-301 to control work on inspected hangers including modification of inspected hangers after acceptance by QC.

(3)

Initiate QA surveillance program to ensure hanger inspections are being performed per procedure requirements.

(4) Train QC and craft personnel on revised procedural requirements.

It was determined by the licensee that the two anchor bolts for the hanger 1 Hl.5C mounting plate did have sufficient engagement, and the licensee removed the excess washers from the bolt installations.

Although the licensee had completed weld and bolt torque inspections per DPC procedure CP-301, complete hanger installation inspections per the requirements of M-41B, serial number 27 had not been performed.

This item will remain open pending completion of licensee evaluation and implementation of corrective action.

4.

Unresolved Items Unresolved items were n.t identified during this inspection.

5.

Inspector Follow-up Items (0 pen) Item 413/79-16-01, Pull box installation not covered by procedure.

The licensee has not completed evaluation and corrective action of this item. Planned licensee corrective actions include the following.

a.

Revise Installation Specification Number CNS-1390.01-00-0048 to author-ize the use of seismically qualified installations which are detailed by design drawings.

1599 073

.

.

e-3-

b.

Re-install pull boxes per a seismically qualified design drawing detail. Disposition of this action will be per NCI 6339.

This item will remain open pending licensee completion of corrective action.

6.

Independent Inspection Effort The inspector toured the unit 2 facility to determine the status of con-struction. Safety-related 4160 volt switchgear is currently being placed into the unit 2 auxiliary building and has not yet been installed.

Within the areas inspected, no items of noncompliance or deviations were identified.

7.

Electrical (Components and Systems I) - Observation of Work and Work Activities and Review of Quality Records The inspector selected 4160 volt switchgear panel number 1 ETA, 600 volt load center IEXLA, and 600 volt motor control centers IEMXA, IEMXC, IEMXE and IEMXG for inspection of panel, breaker and bus installation and quality records.

Installation of IETA, IEXLA, IEMXC, IEMXE and IEMXG were in accordance with the drawings referenced on the installation inspection records.

Inspection of the installation of the panels had been documented on form M-471A in accordance with DPC procedure M-41, " Electrical Equipment Installation Inspection".

Periodic storage and maintenance inspections for 1 ETA (discontinued after energization) and IEXLA had been documented on DPC form P-3A in accordance with DPC procedure P-3, " Storage Inspection".

Receiving inspections had been documented on DPC form P-1A which had been completed per procedure P-1, " Receiving Inspection".

Completed vendor certification forms (DPC form 930.1C) and vendor certification tests were reviewed for compliance with DPC specification CNS-1312.02-1, CNS-1314.01-1 and CNS-1314.01-1.

The inspector reviewed the two most recent QA audits (serial number E-1-7-79 and E-1-8-79) of the electrical equipment instal-lation/ inspection program. The audits had been documented on DPC form QA-300A, " Surveillance Checklist".

Within the areas inspected, no items of noncompliance or deviations were identified.

1599 074