June 16, 2006
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - NRC SECURITY BASELINE INSPECTION REPORT NO. 50-400/2006006
Dear Mr. Gannon:
On May 19, 2006, the NRC completed the onsite portion of a security baseline inspection at your Shearon Harris Nuclear Facility. Portions of Inspection Procedures 71130.01, Access Authorization, and 71130.08, Fitness for Duty, were completed at the Progress Energy Corporate office on February 10, 2006. The enclosed report documents the inspection results, which were discussed with Mr. Eugene Martin, at the corporate office, on February 10, 2006, and with Mr. B. Duncan and other members of your staff on May 19, 2006 and June 12, 2006.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection no findings of significance were identified. However, licensee-identified violations which were determined to be of very low safety significance are listed in this report. The NRC is treating these violations as a non-cited violations (NCV)
consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low safety significance of the violations and because they were entered into your corrective action program. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Shearon Harris Facility.
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS.
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electric Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this letter, please contact us.
Sincerely,
/RA/
Brian R. Bonser, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-400 License Nos.: NPF-63 Enclosure:
NRC Inspection Report No. 05000400/2006006 w/Attachment: Supplemental Information (Safeguards Information)
cc w/encl:
Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs CPB 9 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551 (cc w/o encl contd - See page 3)
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS.
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
(cc w/o encl contd)
Robert J. Duncan II Director of Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165 MC: Zone 1 New Hill, NC 27562-0165 Eric McCartney Plant General Manager--Harris Plant Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 Christos Kamilaris, Manager Support Services Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 J. Wayne Gurganious Training Manager-Harris Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center P. O. Box 327 New Hill, NC 27562-0327 David H. Corlett, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 (cc w/o encl contd - See page 4)
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS.
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
(cc w/o encl contd)
David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551 John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environmental Commerce & Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721 Peggy Force Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. O. Box 29510 Raleigh, NC 27626-0510 (cc w/o encl contd - See page 5)
DOCUMENT CONTAINS CP&L
DOCUMENT CONTAINS ENCLOSURE CONTAINS.
UPON REMOVAL, THIS LETTER IS EXEMPT FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390(d)(1)
(cc w/o encl contd)
Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, NC 27602 Tommy Emerson, Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC 27344