IR 05000400/1978006
| ML18003A315 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/31/1978 |
| From: | Girard E, Swan W, Vandoorn P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML18003A307 | List: |
| References | |
| 05-402-78-06, 5-402-78-6, 50-400-78-06, 50-400-78-6, 50-401-78-06, 50-401-78-6, 50-403-78-06, 50-403-78-6, NUDOCS 7812180343 | |
| Download: ML18003A315 (19) | |
Text
0~i
>>>>*~~
Report. Nos.:
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303 50-400/78-06, 50-401/78-06 50-402/78-06, and 50-403/78-06 Docket Nos.:
50-400, 50-401, 50-402, and 50-403 License Nos.:
CPPR-158, CPPR-'159, CPPR-160, and CPPR-161 Category:
A2, A2, A2, and A2 Licensee:
Carolina Power and Light. Company 336 Fayetteville Street Raleigh, North Carolina 27602 Facility Name:
Shearon Harris Nuclear Power Station Units 1, 2, 3, and
Inspection at:
Wake and Chatham Count,ies, North Carolina Inspect,ion Conducted:
October 3-6, 1978 Inspectors W.
B.
Swan P.
K. VanDoorn E.
H. Girard r
Reviewed by:
C. Bryant Chief Engineering Support Section No.
React, or Construction and Engineering Support Branch I
J b >I )
Ins ection Summar Ins ection on October 3-6 1978 (Re ort Nos. 50-400/78-06 50-401/78-06, 50-402/78-06 and 50-403/78-06 building; containment liner components and major equipment.
supports; containment liner welding, Unit
and service water piping and spent fuel piping, Unit ).
The inspection involved
inspector-hours on-site hy three (3) inspectors.
Results:
In the five areas inspected, no apparent items of noncompliance were identified in four areas; one item of noncompliance was ident.ified in the area of containment we) ding {deficiency - failure to sign-off weld rod control document
- Paragraph 6, details 111).
RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 DETAILS I Prepared by:
W. 8.
wan Engineering Support.
Section No.
React, or Construction and Engineering Support Branch Date Dates of Inspection:
October 3-6, 1978 Reviewed by:
J.
C.
ya
,
hief Engi ering upport Section No.
Reactor Const, ruction and Engineering Support Branch ate Persons Contacted a.
Carolina Power and Li ht Com an (CP&L)
S.
D. Smith, Manager of Power Plant Construction
- "T.
H. Wyllie, Manager of Nuclear Construction
-"R.
M. Parsons, Harris Site Manager
='A.
M. Lucas, Resident.
Engineer G. L. Forehand, Principal QA Specialist J. Nevill, Civil Engineer J. Davis, Head of Field Survey Parties D. Whitehead, Senior QA Specialist,,
Material Control M. Acree, QA Technician, Containment Liner Welding Contractor Or anizations (1)
Ebasco Services Incor orated (Ehasco)
F.
Clawson, Site QA Representative I. Ciloglu, Geologist.
(2)
Daniel Construction~Cpm anv (Daniel )
W.
B.
Goodman, Project Manager C.
Pa i t, General Concret~
Sup( rinten(lent (3)
~Chica o
B~r(d c and iron~Cpm arm (CBB1)
"-R.
Le rch, Cons t ruc t i on Superintendent
RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 I-2
""E. H. Dengler, Melding and QA Superintendent
- "Participated in management.
interview.
2.
Licensee Action on Previous Ins ection Findin s
This area was not inspected.
3.
Unresolved It.ems There were no unresolved items identified during the inspection.
4.
Inde endent Ins ection Effort a.
Preparations were observed for concrete placement 1FHSL236015, estimated to require 3, 100 cubic yards of concrete mix.
h'o noncompliance was identified in the observed conditions.
b.
The inspect. or was informed at. the start of the i:nspection that KRC geologists had requested additional information on the foundation rock at three locations at the main dam.
The licensee's resident engineer and principal (}A specialist accompanied the inspect. or to the main dam excavations and the excavation for the west auxiliary dam.
Exposed rock formations were examined, discussed with the Ebasco geologist, and photographed.
Reports, including geologic maps, by Ebasco and CPSL geologists were to be forwarded directly to DSE in NRC Headquarters.
The inspector observed no evidence of fault displacements in the folded rock surface examined at the main dam excavations.
5.
Containment (Steel Structures and Su orts) - Review of ualit Assurance Im lementin Procedures
- Units
2 3 6 4 Paragraph 5.
of Details I
of Report 50-400/78-04, covering an IE inspection made July 11-13, 1978, describes the contractural and work division relationships between CPEL, EBASCO and CBE1 on the containment liners.
Key documents discussed included subsection 5.5.1.2 and Appendix 5H of the PSAR; EBASCO specification CAR-SH-AS-01,
"Containment Liner, Air Locks and Hatch";
and CBR1 huclear QA Manual for ASME Section III Products.
Implementation is through specific procedures in Section IV of the CBSI manual; CPSL procedures CgC-6, -7, -8 and -10; and notes on drawings CAR-2168, G228 thru G-231 for Unit.
1; CAR-2168, G-286 to G-289 for Unit 2; CAR-2168, G"392 thru G-395 for Unit 4 together with Graver Tank and Manufacturing Company
RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 1-3 fabrication drawings and CB&1 erection drawings.
These procedures and drawings include inspection and performance; receiving inspections to assure conformance with procurement.,
cleanliness, protection, receiving inspection reports and storage and storage inspections.
These procedures and drawings were examined during this inspection and appear adequate to assure control of required activities.
During this followon review, no noncompliances with requirements were identified in the cont. rolling and implementing documents.
Containment.
(Steel Structures and Su orts) - Observation of Work and Work Activities, Units 1 and 2 (Exce t Weldin
)
Graver Tank and Manufacturing Co.
(Graver)
had fabricated and delivered to the Harris site the steel containment liner plate segments, the polar crane support assemblies and the valve chambers for Units 1 and 2 and, apparently, most of the liner segments for L'nits
and 4.
Until transfer of the containment liner erection contract from Graver to CB&I, Graver had retained custody of materials and CP&L had provided required storage without making formal receiving inspections.
Receiving inspections have now been made for the Units
and
materials by Ebasco Services, CP&L and CB&1.
The liner segments as fabricated by Graver could not, in many cases, be utilized with the CB&l erection methods.
The discrepancies in dimensions, omissions of openings, joint preparation details, and damages received during handling and storage were tabulated in detail by Ebasco and CB&1.
Needed corrections have been documented on DDR's and NCR's.
After disposition of each has been determined, corrective action is to be performed by CB&I under CP&L survei)lance.
Note:
No receiving inspections nor official accounting has been made of materials for Units 3 and 4.
The inspector inspected the newly completed floor liner plate in L'nit
containment which included the Graver fabricated shear key pits.
installation of plates in the second course of the wall liner was observed.
The Graver supplied valve boxes for Unit
had been installed and Daniel workmen were correcting honeycomb voids in the surface of the concrete basemat adjacent to the valve chambers.
An inspection was made of the storage of liner materials now under CB&I custody.
Materials for Unit 3 and
stored by CP&L in a
large
RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 I-4 fiberglass
"balloon" warehouse were inspected in company with the licensee's senior materials QA representative.
Conditions and work observed were judged according to requirements of the controlling documents and implementing procedures listed i n paragraph No.
5 above.
In the work observed, complet,ed work inspected, storage conditions observed and applicable documents reviewed, no noncompliances were idei.tified.
7.
Containment (Steel Structures and Su orts) - Review of Qualitv Records
- Units
and
Exce t Weldin The materials supplied by Graver Tank and Manufacturing Company for the Units
and 2 containment liner consist. of liner plates, shear key pit assemblies for the containment floor liner, the polar crane support.
assemblies and valve chambers.
An Ebasco site representative has assembled the Graver quality records for fabrication and testing and the required Materials Certification records for containment. liner sections, shear key pits and polar crane support assemblies for Units 1 and 2 and has started a similar file for materials delivered by Graver for Units 3 and 4.
Ebasco has evaluated the Graver records against the requirements of the procurement specifications, drawings and other controlling documents before acceptance.
The inspector reviewed these Graver records as follows:
a.
Graver Material Test Certificates (2 books designated as Document Package 1-S)
b.
Graver Document.
Package No. 3-S, Rev. 6/15/78, Unit 1, Order No.
60510H.
This package refers to each item with heat numbers, slab numbers and certification numbers.
The package includes copies of NDE reports for magnetic particle, vacuum leak test, visual, and pressure and halogen tests of channels.
The Ebasco representative stated that Graver had supplied nn documentation for materials supplied for Units
and
beyond drawings and material certifications in package 1-RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 I-5 Graver records package transmitted t.o CPSL on 4/18/78 included shop and field drawings with a
list.
of titles and item identificat.ion, material lists for Unit. 1, material test, results for Units 1,
2,
and
and shop document, ation packages for materials and drawing it.ems.
Graver drawings L25201 to L26023 show fabrication and erection details on Units 1 to 4.
The inspector referred to the procurement drawings from which Graver developed their drawings.
These were:
For Unit 1, Containment. Building Liner Drawings CAR-2168, G-228 to G-231 For Unit. 2, Drawings CAR-2168, G-286 to G-289 For Unit. 3, Drawings CAR-2168, G-339 to G-342 For Unit 4, Drawings CAR-2168, G-392 t.o G-395 The locations and types of 164 penetrations (S-1 to S-107; S-150, 151, 152; and S-201 to S-254) are detailed on drawing CAR-2168, G-229.
At t,he CBRI field office t.railer the inspect, or reviewed the CBgl Print.
Control Record, nine sheets of Record Drawings and Field Check Lists for Cont,ainment Liner, Unit. 1.
Asbuilt data are recorded on prints of these drawings as the work progresses.
For background in the records review the inspector reviewed PSAR Chapter 5, as amended, ent.itled Containment.
Section 5.1 Containment Syst.em Structures Subsection 5.1.1.8 Component Design and Analysis 5.1.1.9 Penet,rations 5.1.2 Containment Internal Structures 5.5.1.4 Liner Construction Tests PSAR Appendix 5E Design Bases for Structures, t hru Amendment Nn.
60, was also reviewed.
For Graver materials for Units
and
" for whirh receiv,>ng inspection reports and documentation receipt reports had been generated, the inspector reviewed CNL file QA-435003.
Records for dome plates, shell plates, crane related materials, bottom
RII Rpt.
Nos. 50-400/78-06, 50-40l/78-06, 50-402/78-06 and 50-403/78-06 I-6 liner plates, shear key pits, and penetrations were sampled in the files.
Typically, the records included CP&L Receiving Inspection Report gA-7 and work sheets; Ebasco Certification that documentation for the piece had been evaluated and is in compliance; CBI Jobsite Receiving and Refurbishing Checklist.;
CBI Material Rejection Sheet; CBI Recommendations; CBI Shop Discrepancy Report; CBI Dimensional Sketches.
For each reported discrepancy CBI made recommendations for correction.
As appropriate, DDR's and NCR's were prepared by CP&L.
The inspector traced the progress of analysis, disposition, and corrective orders on a
sampling of these documents and determined that, discrepancies were being processed in a manner to assure correction.
In the records review, no noncompliances nor deviations were identified.
8.
Mana ement Interview An exit interview was held with Mr. R.
M. Parsons, Harris site manager, and members of the site engineering and (}A staffs.
Mr. S.
D. Smith Corporate Manager of Power Plant.
Const, ruction and Mr. T.
H. Myllie, Manager of Nuclear Construction attended and participated.
The inspector stated that his part. of the inspection involved the steel contai:iment liners, (except welding), observation of preparations for concrete placement in the fuel handling building and a
followon observation of geologic foundation conditions at the main dam and west auxiliary dam.
He stated that in these areas no deviations, noncompliances or unresolved items had been identifie RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 II-1 DETAILS II I
Prepared bg
~
~ <g~c P.
K. VanDoorn, Metallurgical ngineer Engineering Support. Section No.
Reactor Construction and Engineering Support.
Branch 7g Date Dates of Inspection:
Oct,ober 3-6, 1978 Reviewed bow,
w We'F~
T.
E.
Conl on, Chief Engineering Support Section No.
Reactor Construction and Engineering Support.
Branch
/r
'z Da e
Persons Contacted a.
Carolina Pover and Li ht Com any (CPSL)
R.
M.
"'S.
D.
-T.
H.
-"G. L.
L. E.
A.
M.
H. J.
Parsons, Site Manager Smith, Manager of Pot"er Plant Construction Wyllie, Manager of Nuclear Construction Forehand, Principal QA Specialist Jones, Principal QA Engineer Lucas, Resident.
Engineer Young, Senior QA Specialist.,
Welding and NDE b.
Contractor Or anization Chica o Brid e and Iron Com any (CBI)
-'E.
C. Dengler, Welding and QA Superintendent
-'R. <<rch
,
Const. ruction Superintendent R.
B. West, QA Technician
"-Denotes those present.
at.
t,he exit interview.
2.
Licensee Actions on Previous
~lns ection Findings Actions on previous inspection findirigs ~eri ~
not examined during this inspection.
3.
Unresolved Items
RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 II-2 No unresolved items. were identified during this inspection.
4.
Inde endent Ins ection Effort a.
The inspect, or conducted a walk-through inspection of the site to observe construction progress and construction activities such as containment.
welding, pipe welding, material handling, housekeeping and storage.
b.
The inspect. or reviewed QA records for 8 (Unit 2) Class 3 pipe welds to determine if Code, NRC and SAR requirements were being met.
The applicable Code is the ASME Boiler and Pressure Vessel Code> Section III, 1974 edition plus addenda through the winter of 1976.
Records for Field Weld Nos.
18, 16, 14, 12, 10, 8, 6 and 4 of ISO 2SW-1/2165-G-211 were reviewed.
Types of records reviewed included weld history records which included inspection and NDE signoffs, NDE reports, weld material certifications, welder qualifications and inspector qualifications.
No items of noncompliance or deviations were identified.
5.
Containment (Structural Steel Weldin ) - Review of Quality Assurance Im lementin Procedures Units
and
The applicable Code for containment welding is the ASME Boiler and Pressure Vessel Code,Section III, Division 2, 1975 edit.ion plus addenda through the winter of 1975 with exceptions listed in Chapter 5 of the PSAR.
The inspect, or reviewed CBI quality assurance implementing manual, specifications, procedures, programs and documentation forms for the areas of welding, NDE and inspection to determine if Code, NRC and SAR requirements were being met.
Documentation of weld history and inspections was being accomplished by use of record drawings, record check lists and inspection forms.
The inspector reviewed these documents, the applicable contract drawings and the applicable design specification (CAR-SH-AS-1, Rev.
7, Containment Liner, Air Locks, and Hatch).
The inspect. or also reviewed the following manual, procedures, programs and specifications:
CBl QA Manual for ASME Section III Products, Division 4 GWPS-SAW-X, Rev.
1, General Welding Procedure Specif>cation for the Automatic Submerged Arr Process GWPS-SMAW-X, Rev.
1, General Welding Procedure Specification for the Shielded Metal Arc Process GWPS-Stud, Rev.
0, Genera1 We1ding Procedure Specification for the Stud Welding Process
RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, 50-402/78-06 and 50-403/78-06 II-3 GR-27, Rev. 0, General Repair Procedure for Materials and Welds GRP-Stud, Rev. 0, Stud Repair Procedure HT-11, Rev. 8, Post Veld-Post. Form Heat, Treatment. Procedure HT-11 Instructions, Rev. 0, Post Weld Heat. Treatment Operator Instruction's WPAT, Rev. 0, Welding Procedure Application Table WPS-E7010, Rev.
WPS-EM12K-585(2G),
Rev.
WPS-Stud Welding, Rev.
o WPS-E7010/7018, Rev.
WPS-E7018(B),
Rev.
WPS-E7018(A),
Rev.
LC5X, Rev.
1, Leak Chase Channel Solution Film and Pressure Decay Procedure MT1, Rev.
1, Magnetic Particle Examination Procedure, Continuous Prod, Dry, Visible Particles MT2, Rev.
1, Magnetic Particle Examination Procedure, Continuous Yoke, Dry, Visible, Particles PT13, Rev.
1, Liquid Penetrant Examination Procedure Color Contrast, Solvent Removable, Wet Developer RT5, Rev. 2, Radiographic Examination Procedure for Welds VB4, Rev.
1, Vacuum Box Test Procedure VT3, Rev.
1, Visual Examination Procedure TIP-1, Rev. 2, Training, Indoctrination and qualification Program Nondestructive Examination Personnel Training Qualification and Certificat.ion Program, Rev.
50-402/78-06 and 50-403/78-06 RII Rpt.
Nos. 50-400/78-06, 50-401/78-06, II-4
Corporate Calibration Program (dated 7/27/78)
NRP-1, Rev. 8, Nuclear Records Procedure QAS-311, Rev.
11, Quality Assurance Specification for Welding Materials Certified to SFA Specification QAS-313, Rev.
5, Quality Assurance Specification for Testing of Welding Materials QAS-315, Rev. 7, Quality Assurance Specification for Welding Fluxes QAS-370, Rev. 2, Qualitv Assurance Specification for Stud Materials SHlN, Rev.
1, Site Receiving and Storage Procedure of Nuclear Product Items SH9, Rev.
2, Packaging, Shipping, Site Storage Procedure of Nuclear Product Items No items of noncompliance or deviations were identified.
6.
Containment (Structural Steel Weldin
) - Review of Quality Records(Unit 1)
The inspector reviewed the CP&L audit program for the containment welding activities being performed by CBI.
CP&L indicated that a full time QA surveillance specialist had been assigned to review CBI welding activities.
The inspector reviewed all CP&L audits generated from August 31, 1978 through September 14, 1978 to determine if records were adequate, legible and retrievable and that management review was provided.
The inspector also reviewed qualifications of audit personnel.
No items of noncompliance or deviations were identified.
7.
Exit Interview The inspect. or met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection.
The inspector summarized the scope and findings of the inspectio ~
~
RII Rpt.
Nos. 50-400/78-6, 50-401/78-6, 40-402/78-6 and 50-403/78-6 II1-1 DETAILS III Prepared b
E.
H. Girard, Reactor Inspecto Engineering Support Section No.
Reactor Construct.ion and Engineering Support Branch I I /~
Da e
Dates of Inspection:
October 3-6, 1978 Reviewed T. E. Conlon, Chief Engineering Support Section No.
Reactor Construction and Engineering Support Branch c"
iS'a e
1.
Persons Contacted a.
Carolina Power and Li ht Com an (CPRL)
- "G. L. Forehand, Principal QA Specialist
-'L. E. Jones, Principal gA Engineer
"-T. H. Wyllie, Manager of Nuclear Construct, on
""R.
M. Parsons, Harris Site Manager
-"S.
D. Smith, Manager of Power Plant Construction B. Giles, Welding Inspector J.
Johanson, gA/NDE Technician
-"A. M. Lucas, Resident Engineer b.
Chica o Brid e and Iron {CBKI)
'"E.
C. Dengler, Welding 6 gA Superintendent K.
M.
Wayman, Assistant.
Construction Welding 6 gA Manager R.
B. West, gA Technician
-'Denotes those present at the exit interview.
Licensee Action On Previously Identified In~sert ion Fin~din s
This inspector did not review any licensee actions with respect tn previous inspection findings.
3.
Unresolved Items No unresolved items resulted from this inspectio RII Rpt.
Nos. 50-400/78-6, 50-401/78-6, 40-402/78-6 and 50-403/78-6 III-2 4.
Inde endent Ins ection Effort (Unit 1 and/or 2 as noted below)
Reviev of welding Procedure Specifications (WPS's)
and Procedure Qualification Records (PQR's) for containment liner welding (Units 1 and 2).
Three WPS's and the associated PQR's were revieved for compliance with the applicable code.
The WPS's were:
(1)
7018(A)/84030, Rev.
(2)
7018(B)/84030, Rev.
(3)
STUD/84030 Rev.
These were CBSI's procedures and the applicable code is ASME Section III, Div. 2, Subsection CC (W75).
No items of noncompliance or deviations were identified.
Service Water System Piping - Welding, Observation of Work in Progress, and Review of Welding Documentation at the Work Stations (Unit 2).
Fitup and welding in progress vere observed and records available at the work stations were reviewed for velds 2-SW-2-FW-33 and-FM-35.
The licensee's inspector stated these vere ASME Section III Cl.
3 welds.
The welding and records were reviewed for compliance with this code and requirements stated in CPQ. Procedures MP-03 Rev.
1 (Welding Material Control)
and MP-05 Rev.
3 (Stamping of Meldments).
Record information was examined on form QA-28, on form MP/3-1 and stamped adjacent to the velds.
Welding had not been completed on these welds when last viewed.
No items of noncompliance or deviations were identified.
Spent, Fuel Piping - Observation of 'Melding and Handling of Pipe Spool Pieces and Review of Weld Records at the Work Station (Unit 1).
Fitup, welding in progress and the completed weld vere observed and records available at the work station vere examined for veld 1-SF-1-FM-3.
The licensee's inspect. or stated this vas an ASME Section 111 Cl.
3 weld.
The welding and records were reviewed for compliance with this Code and Procedures HP-07 Rev.
(General Welding Procedure for Stainless Steel Welding),
HP-05 Rev.
(Stamping of Weldments)
and HP-03 Rev.
1 (Welding Haterial Control).
Weld material tagging,,data on form QA-28, and welder identification applied adjacent to the completed weld were not examined.
Welding inspection and final data entries had not been completed when form QA-28 was last examine RII Rpt.
Nos. 50-400/78-6, 50-401/78-6)
40-402/78-6 and 50-403/78-6 III-3 Handling of pipe spool pieces Fl-236-1-SF-2-1 and -2-2 was observed during their positioning for weld fitup.
The handling was evaluated on the basis of "normal good practice".
Specific licensee procedures applicable to this operation were not checked by the NRC inspector.
No deviations or items of noncompliance were noted.
5.
Containment (Liner Plate Weldin ) - Observation of Work and Work Activities Unit
Welding of Containment Liner Seams Weld identification and location, joint preparation and alignment, and QC verification were observed for weld N (containment liner first ring to floor weld) and second ring vertical liner weld I, prior to and during welding.
Use of the appropriate welding procedure (7018(B)/84030),
welder qualifications (for welders J.N
, C.B.,
and G.W.A.), and use of the specified welding material (7018) were verified.
Inspection personnel were noted periodically observing the welding.
Recording of welding variable checks was verified.
Performance of required magnetic particle inspections on liner welds was not specifically observed, but was verified from discussions with inspection personnel and a review of the records.
Handling, storage, and issuance of welding material was
'lso examined.
This work was checked for compliance with the requirements of ASME Section III, Div. 2, Subsection CC (W75).
No deviations or items of noncompliance were identified.
Stud Welding on Liner Plate Stud welding on liner plate is required to comply with ASIDE Section III, Di v. 2, Subsection, CC (W75).
Compliance with the applicable identification, location, preparation, QC verification, welding procedure, inspection and welding material controls was checked for the stud welding observed during the NRC inspection.
Actions required prior to welding (location marking, preparation of weld area by grinding, etc.)
were specif>cally examined for plate 11B3.
Actual performance of welding and inspection was observed for liner plate 12B3.
No deviations or items of noncompliance were identifie RII Rpt.
Nos. 50-400/78-6, 50-401/78-6, 40-402/78-6 and 50-403/78-6 III-4 Containment (Liner Plate Vertical Seam Weldin
- Review of Qua1i tv Records Unit 1)
The records applicable to this welding must comply with ASME Section III, Div. 2, Subsection CC.
Weld history records
- including visual and dimensional inspection (on the CBSI Record Drawing Table),
magnetic particle inspection (CBSI MT Report 18), welder and welding materials identification, etc.,
were reviewed for the containment liner bottom ring vertical welds and several second ring welds.
Specific welder qualification records were examined for welders J.N., L.H., and C.B.
Applicable records for storage identification, and issue control of the welding materials were examined.
The issue control of the welding material for the liner seam welding is specified in CB&1 "Contract Quality Assurance Handbook, Contract 8403/1/2, Div. 4" (implementing the controls required by
CFR 50, ASME Section III, and licensee contractual documents).
The referenced CBRI document (in its Sect.
8.0 Welding, Rev.
7) requires sign-off entries for both issuance and return (or completed usage)
of welding electrodes on a "Daily Weld Distribution Log" (form WL180).
In examining the log record sheets the NRC inspector found that the sign-offs required to verify return or complete usage of electrodes (under the heading "Material Disposition Complete" ) were missing for one issuance on 9/21/78 and all issuances on 10/4/78.
There was no evidence to indicate that electrodes were actually being allowed to remain out uncontrolled.
This was apparently only a
documentation error.
The missing record entries are a noncompliance with Criterion V of 10 CFR 50 Appendix B, which the licensee implements as stated in Paragraph 1.8.5.5 of his PSAR.
This noncompliance is categorized as a deficiency and is identified for record as item 400/78-06-01.
One noncompliance, item 400/78-06-01, was found in this inspection.
No deviations were identified.
Exit Interview The scope and findings of the inspection were summarized and the noncompliance described in 6 above (item 400/78-06-01)
was briefly discusse A
~