Forwards IE Inspec Repts 50-400/78-06, 50-401/78-06, 50-402/ 78-06 & 50-403/78-06 on 781003-06 & Notice of Violation
ML18003A310
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/15/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18003A307 List:
References
NUDOCS 7812180336
Download: ML18003A310 (2)


See also: IR 05000400/1978006

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II,

101 MARIETTASTREET, N.IN.

ATLANTA.GEORGIA 30303

NOV 15

1978

In Reply Refer To:

RII:JCB

50-400/78-06

50-401/78-06

50-402/78-06

50-403/78-06

Carolina

Power

and Light Company

ATTN:

Mr. J.

A. Jones

Executive Vice President

Engineering,

Construction

and Operation

336 Fayetteville Street.

Raleigh,

North Carolina

27602

Gentlemen:

This refers

to the inspection

conducted

by

W.

B.

Swan of this office on

October 3-6,

1978 of act.ivities authorized

by ÃRC Construction

Permit.

Sos.

CPPR-158,

CPPR-159,

CPPR-160,

and

CPPR-161

for the Shearon Harris nuclear

Plant, Units

1, 2, 3,

and

4 facility, and to the discussion

of our findings

held with MR.

R.

M. Parsons,

Site Manager,

at. the conclusion of the

inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records,

inter-

views with personnel,

and observations

by the inspector.

During the inspection, it was

found that. certain activities under your

license

appear

to be in noncompliance

with NRC requirement.s.

This item and

references

to pertinent.

requirements

are list.ed in the hotice of Violation

enclosed

herewith

as Appendix A.

This not.ice is sent

to you pursuant

to

the provisions of Section

2.201 of the

NRC's "Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulations.

Section

2.201

requires

you to

submit, to this office; within 20 days of your receipt of t.his notice,

a

written statement

or explanation

in reply including:

(1) corrective

steps

which have

been

taken

by you,

and the results

achieved;

(2) corrective

steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

%81-z s 80 83@

Carolina

Power

and Light Company

In accordance

vith Section

2.790 of the NRC's Rules of Practice," Yart 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and the enclosed

inspection

report vill be placed in the

NRC's Public Document

Room.

If

this report contains

any information that. you (or your contractor)

believe

to be proprietary, it is necessary

that

you make

a written application

vithin 20 days of this office to withhold such information from public

disclosure.

Any such application

must. include

a full statement

of the

reasons

on the basis

of which it. is claimed that the informati'on is

proprietary,

and should

be prepared

so that, proprietary information

identified in the application is contained

in

a separate

part. of the

document,.

If we do not hear

from you in this regard within the specified

period,

the report. will be placed in the Public Document

Room.

Should

you have

any questions

concerning this letter,

ve vill be glad to

discuss

them vi th you.

Sincerely,

Charles

E. Morphy, Chief

Reactor Construction

and Engineering

Support.

Branch

Enclosures:

1.

Appendix A, Notice of 'Violation

2.

Inspection

Report. Nos.: 50-400/78-06,

50-401/78-06,

50-402/78-06

and 50-403/78-06

cc v/encl:

Mr. Roland Parsons,

Site Manager

Shearon Harris Nuclear

Power Plant.

P.

0.

Box

101

Nev Hill, North Carolina

27562