ML18003A312

From kanterella
Jump to navigation Jump to search
Notice of Violation from Inspec on 781003-06
ML18003A312
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/15/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18003A307 List:
References
50-400-78-06, 50-400-78-6, 50-401-78-06, 50-401-78-6, 50-402-78-06, 50-402-78-6, 50-403-78-06, 50-403-78-6, NUDOCS 7812180338
Download: ML18003A312 (1)


Text

APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company License No.

CPPR-158 Based on the results of the NRC inspection conducted on October 3-6,

1978, it appears that certain of your activities were not conduct ed in full compliance with NRC requirements as indicated below.

These items have been categorized as described in our correspondence to you dated December 31, 1974.

Criterion V of Appendix B to 10 CFR 50 as implemented by Carolina Power and Light PSAR Section 1.8.5.5.,

states in part that, "Activities affecting quality shall be prescribed by documented instructions, procedures or drawings....

and shall be accom-plished in accordance with these instructions, procedures or drawings."

Procedures applicable to control of welding electrodes used in construction of the containment liner are included in Chicago Bridge Iron's "Cont.ract equality Assurance

Handbook, Contract 84031/2, Div. 4".

This document requires record keeping sign-off entries for issuance and return (or complete usage) of welding electrodes on a "Daily field Distribution Log".

Contrary to the described requirements, an examination of the log on October 6,

1978, revealed that the record keeping sign-offs required to verify return or complete usage of electrodes were not entered for one issuance on September 21,
1978, and all issuances on October 4,

1978.

This is a deficiency.

'2 812 180 QF