IR 05000397/1996014

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Weaknesses Noted in Insp Rept 50-397/96-14
ML17292A623
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/12/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9612160247
Download: ML17292A623 (5)


Text

CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I ACCESSION NBR:9612160247 DOC.DATE: 96/12/12 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION WYNN,T.P.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System SUBJECT:

Ack receipt of 961125 ltr informing NRC of steps taken to correct weaknesses noted in insp rept 50-397/96-14 dtd 961025.

DISTRIBUTION CODE:

IE35D COPIES RECEIVED:LTR J ENCL 0 SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr Exercise Rep NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTER L: FILE CENTER RB RGN4 FILE

COPIES LTTR ENCL RECIPIENT ID CODE/NAME COLBURN,T NRR/DISP/PIPB OE DIR COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

~p,fl RfQy

SUBJECT:

NRC INSPECTION REPORT 50-397/96-14

Dear Mr. Parrish:

Thank you for your letter dated November 25, 1996, in response to the emergency preparedness exercise weakness identified in NRC Inspection Report 50-397/96-14dated October 25, 1996.

We examined your reply and find it responsive to the concerns raised in our inspection report.

We will review the implementation of your corrective actions during a future inspection.

Sincerel

/

o asP. wy, Di e or Division of Reac or af y

Docket No.: 50-397 License No.:

NPF-21 CC:

Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Paul R. Bemis (Mail Drop PE20)

Vice President, Nuclear Operations Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 96i2i60247 96i2i2 PDR ADOCK 05000397

PDR

Washington Public Power Supply System-2-Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Al E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Lourdes C. Fernandez (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Malcolm H. Phillips, Jr., Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System-3-E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE35)

bcc distrib. by RIV:

L. J. Callan

. DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

WCFO File DOCUMENT NAME: R't WN2iWN614AK.GMG To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enctosures

"N" = No copy RIV:PSB/SEPA GGood 12/

CPSB i':DRS BMurrayW ~4 TGwynn 1 2/jp/96 12/ t/96 OFFICIAL RECORD COPY

Washington Public Power Supply System-3-E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE35)

bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9EI0)

Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)

WCFO File DOCUMENT NAME: R:5 WN2iWN614AK.GMG To receive copy of document, Indicate In box: "C" = Copy without encIosures

"E" = Copy with enciosures

"N" = No copy RIV'PSB/SEPA GGood C:PSB C

D:DRS BMurray~ ~4 TGwynn 12/I

1 2/f796 12/ 496 OFFICIAL RECORD COPY