Ack Receipt of Re 911216 Insp Rept 50-397/91-41, Clarifying That Fire Brigade Personnel Tests Are Not Required Unless Physician Deems Necessary
ML17289A361
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/21/1992
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9203050025
Download: ML17289A361 (5)


Text

~gS IlE0y, c" 'po

~c

%y*y4 UNITED STATES NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 Docket No. 50-397 Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr. G.

C. Sorenson, Manager Regulatory Programs Gentlemen:

Thank you for your letter of January 31, 1992,.in response to our Inspection Report No. 50-397/91-41, dated December 16, 1991, informing us that routine stress tests for fire brigade personnel at WNP-2 are not r'equired unless the examining physician deems it necessary to ensure the job function can be performed.

Your clarification of program requirements is appreciated.

Sincerely, ennis F. Ki

, Chief Reactor Safety Branch e

9203050025 920221 PDR

. ADOCK 05000397 G

PDR r ~Ca

Oocket No.

50-397 Mashington Public Power Supply System P.O.

Box 968 3000 George Washington May Richland, Mashington 99352 Attention:

Nr.

G.

C. Sorenson, Manager Regulatory Programs

.Gentlemen:

Thank you for your letter of January 31, 1992, in response to our Inspection Report No. 50-397/91-41, dated Oecember 16, 1991, nforming us that routine stress tests for fire brigade personnel at MNP-2 is not required unless the examining physician deems it necessary to ensure the ob 'function can be performed.

Your clarification of program requirements is appreciated.

Sincerely, Oennis F. Kirsch, Chief Reactor Safety Branch bcc w/copy of letter dated January 31, 1992; Oocket File Resident Inspector Project Inspector G.

Cook R.

Huey B. Faulkenberry J. Martin J. Zollicoffer State of Mashington bcc w/o copy of letter dated January 31, 1992 M. Smith REGION V/vivian BMag ohnson Z/r /N h.R~

P arbut z /i5/0 z.

OKirsch

'Dg( /q~

Docket No. 50-397 Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention: 'r.

G.

C. Sorenson, Manager Regulatory Programs Gentlemen:

Thank you for your letter of January 31, 1992, in response to our Inspection R'eport No. 50-397/91-41, dated December 16, 1991, informing us that routine stress tests for fire brigade personnel at WNP-2 are not required unless the examining physician deems it necessary to ensure the job function can be performed.

Your clarification of program requirements is appreciated.

Sincerely, Dennis F. Kirsch, Chief Reactor Safety Branch bcc w/copy of letter dated January 31, 1992:

Docket Fi,le Resident Inspector Project Inspector G.

Cook R.

Huey B. Faulkenberry J. Martin J. Zollicoffer State of Washington bcc w/o copy of letter dated January 31, 1992 N. Smith REGION V/vivian BWagner

/ /