IR 05000397/1991036

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/91-36
ML17289A318
Person / Time
Site: Columbia 
Issue date: 02/12/1992
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Grumme L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9202190022
Download: ML17289A318 (3)


Text

(I gpss flEQQ (4 P0 Cy

IIh,

." g

+>>*<<<<

Docket No. 50-397 uNITED STATES NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 FEB 1~

'ashington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Nr.

L.

L. Grumme, Acting Director Licensing and Assurance SUBJECT:

WPPSS RESPONSE TO NOTICE OF VIOLATIONS CONTAINED IN NRC INSPECTION REPORT NO. 50-397/91-36 Thank you for your letter dated January

1992, in response to our Notice, of Violation and Inspection Report No. 50-097/91-36, dated December 17, 1991, informing us of the steps you have taken to correct the items which we brought to your attention.

Your corrective actions appear to resolve our concerns regarding the violations referenced in the subject report.

Your corrective actions will be reviewed during future inspections of your activities.

Your cooperation with us is appreciated.

Sincerely, o.P ~

Gregory P.

uhas, Chief Reactor Radiological Protection Branch

'P202f90022 920212 PDR ADOCK 05000397

PDR

FEB y2 1S92

'

Docket No. 50-397 Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr.

L.

L.

Grumme, Acting Director Licensing and Assurance SUBJECT:

WPPSS RESPONSE TO NOTICE OF VIOLATIONS CONTAINED IN NRC INSPECTION REPORT NO. 50-397/91-36 Thank you for your letter dated January 24, 1992, in response to our Notice of Violation and Inspection Report No. 50-397/91-36, dated December 17, 1991, informing us of the steps you have taken to correct the items which we brought to your attention.

Your corrective actions appear to resolve our concerns regarding the violations referenced in the subject report.

Your corrective actions will be reviewed during future inspections. of your activities.

Your cooperation with us is appreciated.

~

Sincerely, Gregory P.

Yuhas, Chief Reactor Radiological Protection Branch bcc w/copy of letter dated January 24, 1992 Docket File Resident Inspec'tor Project Inspector G.

Cook R.

Huey B. Faulkenberry J. Martin J. Zollicoffer State of Washington bcc w/o copy of letter dated January 24, 1992 M. Smith REGI N V/vivian LCa on GYuh s

0//~</4~

~

i f

0