Category:INSPECTION REPORT
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000382/19980021998-03-20020 March 1998 Insp Rept 50-382/98-02 on 980202-20.No Violations Noted. Major Areas Inspected:Current Performance & Effectiveness of Corrective Action Program Including Audits & Assessments, Operations & Engineering ML20216E1461998-03-12012 March 1998 Insp Rept 50-382/98-07 on 980302-06.Violations Noted.Major Areas Inspected:Plant Support ML20216E5991998-03-12012 March 1998 Insp Rept 50-382/98-05 on 980202-12.Violations Noted.Major Areas Inspected:Licensee Physical Security Program ML20216E7621998-03-12012 March 1998 Insp Rept 50-382/97-25 on 971201-980205.Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000382/19980031998-03-10010 March 1998 Insp Rept 50-382/98-03 on 980216-20.No Violations Noted. Major Areas Inspected:Operational Status of Emergency Preparedness Program ML20203L2171998-03-0303 March 1998 Insp Rept 50-382/98-04 on 980202-06.Violations Noted.Major Areas Inspected:Radiation Protection Program Including External Exposure Controls,Training Qualifications, Facilities & Equipment & Procedures & Documentation IR 05000382/19970281998-02-11011 February 1998 Insp Rept 50-382/97-28 on 971214-980131.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Activities IR 05000382/19980011998-01-29029 January 1998 Insp Rept 50-382/98-01 on 980112-15.No Violations Noted. Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste/Matls Transportation Program.Quality Assurance Oversight,Training & Procedural Guidance Were Also Reviewed ML20198M2801998-01-12012 January 1998 Insp Rept 50-382/97-24 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198C8871998-01-0505 January 1998 Insp Rept 50-382/97-26 on 971117-1205.No Violations Noted. Major Areas Inspected:Operator Activities Re Failure to Return Valve ACC-126A,auxiliary Component CWS Flow Control Valve,To Automatic Operation When Restoring CWS ML20198C4561998-01-0202 January 1998 Insp Rept 50-382/97-27 on 971117-1205.Violations Noted. Major Areas Inspected:Review of Licensee Identification That Plant Ventilation Sys Could Adversely Affect Level Indication for Refueling Water Storage Pool IR 05000382/19970181997-12-0505 December 1997 Insp Rept 50-382/97-18 on 971104-07.Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000382/19970211997-12-0202 December 1997 Insp Rept 50-382/97-21 on 970922-26 & 1006-10.Violation Noted.Major Areas Inspected:Engineering,Maintenance & Mgt Meetings IR 05000382/19970221997-11-19019 November 1997 Insp Rept 50-382/97-22 on 970921-0001.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970231997-11-0404 November 1997 Insp Rept 50-382/97-23 on 971006-10.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Waste Mgt Program Including Organization & Mgt Controls & Radioactive Effluent Monitoring IR 05000382/19970191997-10-24024 October 1997 Partially Withheld Insp Rept 50-382/97-19 on 970922-26 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected: Plant Support Re Land Vehicle Control Measures & Security Program IR 05000382/19970171997-10-23023 October 1997 Insp Rept 50-382/97-17 on 970929-1003.Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001, Licensed Operator Requalification Program Evaluation IR 05000382/19970161997-10-17017 October 1997 Insp Rept 50-382/97-16 on 970810-0920.Violations Noted: Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19970201997-10-0909 October 1997 Insp Rept 50-382/97-20 on 970922-26.Violations Noted.Major Areas Inspected:External & Internal Exposure Control Programs,Surveys,Monitoring & Control of Radioactive Matl & Quality Assurance 1999-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000382/19990201999-10-21021 October 1999 Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support Activities IR 05000382/19990141999-10-19019 October 1999 Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training Program PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1999-10-0101 October 1999 PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily IR 05000382/19990181999-09-29029 September 1999 Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection Program IR 05000382/19990191999-09-27027 September 1999 Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant Support PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 9908101999-09-15015 September 1999 PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 IR 05000382/19990151999-09-14014 September 1999 Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile Protection IR 05000382/19990071999-09-0808 September 1999 Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:Operations IR 05000382/19990161999-09-0101 September 1999 Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed1999-08-12012 August 1999 PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed IR 05000382/19990101999-08-11011 August 1999 Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation Programs PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor1999-08-0303 August 1999 PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor IR 05000382/19990131999-07-15015 July 1999 Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities IR 05000382/19990121999-06-21021 June 1999 Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000382/19990111999-06-18018 June 1999 Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room Instruments ML20196C9461999-06-15015 June 1999 Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee IR 05000382/19990091999-06-0303 June 1999 Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20209B8581999-05-25025 May 1999 EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws IR 05000382/19990061999-05-18018 May 1999 Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201 IR 05000382/19990051999-05-10010 May 1999 Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML20206F4801999-05-0303 May 1999 Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program IR 05000382/19990041999-04-0909 April 1999 Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker Performance IR 05000382/19990021999-04-0505 April 1999 Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support Activities IR 05000382/19990031999-03-26026 March 1999 Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage Activities IR 05000382/19990011999-03-0303 March 1999 Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support ML20207F1581999-03-0303 March 1999 Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited IR 05000382/19980181998-12-21021 December 1998 Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19980151998-11-24024 November 1998 Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support Activities PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area1998-11-19019 November 1998 PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area IR 05000382/19980131998-11-17017 November 1998 Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers ML20155D0561998-10-29029 October 1998 Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program Activities ML20155D0411998-10-29029 October 1998 Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area ML20155D5111998-10-27027 October 1998 Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790) ML20155D5021998-10-27027 October 1998 Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals ML20154L0831998-10-0909 October 1998 Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station ML20154L1281998-10-0909 October 1998 Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site1998-09-28028 September 1998 PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 9809231998-09-18018 September 1998 PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923 IR 05000382/19980121998-08-21021 August 1998 Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000382/19992011998-07-27027 July 1998 Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:Engineering IR 05000382/19980101998-07-20020 July 1998 Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles ML20236P2431998-07-10010 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not Controlled IR 05000382/19980091998-07-10010 July 1998 Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in Place ML20249A9611998-06-16016 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI Flow ML20151R9131998-06-0909 June 1998 EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 Facility IR 05000382/19980081998-05-29029 May 1998 Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20248F6801998-05-29029 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided IR 05000382/19980991998-04-24024 April 1998 SALP Rept 50-382/98-99 for 961201-980321 ML20217B6731998-04-21021 April 1998 Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor ML20217B6981998-04-21021 April 1998 Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering 1999-09-08
[Table view] |
Text
- .
. .
l APPENDIX U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Inspection Report: 50-382/94-17 License: NPF-38 1 Licensee: Entergy Operations, In P.O. Box B Killona, Louisiana Facility Name: Water #ord Steam Electric Station, Unit 3 Inspection At: Taft, Louisiana Inspection Conducted: July 18-22, 1994 Inspector: Anthony D. Gaines, Radiation Specialist Facilities Inspection Programs Branch Approved: //Lft E d(.ff 686/
. Murray, Chief,LFacilitic Inspection Date' /
Programs Branch Inspection Summary V Areas Inspected: Routine, announced inspection of the solid radioactive waste management and radioactive materials transportation program Results:
- Very good audits and surveillances were performed by qualified individuals (Section 1.1).
. There had been no major changes in facilities, equipment, programs, or procedures (Section 1.2).
. The radioactive waste and transportation programs included a well qualified staff (Section 1.3).
- An excellent training program had been implemented for personnel involved in transportation activities. The licensee committed to revise a training procedure in order to satisfy their response to NRC Bulletin 79-19 (Section 1.3).
- Good implementing procedures were maintained for the radioactive waste management program (Section 1.4).
9408100012 940004 PDR O ADOCK 05000382 PDR
b . .
_2_
- Onsite radioactive waste in storage was shipped in anticipation of the closure of the offsite burial site (Section 1.4).
- Radioactive waste was properly classified, characterized, and prepared for shipment (Section 1.5).
- Individuals responsible for transportation of radioactive waste were knowledgeable of the regulatory requirements and burial site license conditions (Section 1.6).
Attachment:
- Attachment - Persons Contacted and Exit Meeting
,
!
i
,
h t
i l
l l
l
. .
-3-DETAILS 1 SOLID RADI0 ACTIVE WASTE MANAGEMENT AND TRANSPORTATION OF RADI0 ACTIVE MATERIALS (86750)
The inspector reviewed the licensee's radioactive material transportation program to deterrrine agreement with the commitments made in response to NRC Bulletin 79-19; compliance with the requirements of 10 CFR Parts 20, 30, and 71; and 49 CFR Parts 171 through 189. The inspector also reviewed the licensee's program for processing, control, and onsite storage of solid radioactive waste for agreement with the commitments in Chapter 11.4 of the Final Safety Analysis Report and compliance with the requirements in Technical Specification 6.8; and 10 CFR 61.55 and 61.5 ,
1.1 Audits and Appraisals The audit frequency for the solid radioactive waste and transportation programs was biennia Therefore, there had not been a comprehensive audit performed since the last inspection of this area in June 1993 which reviewed the audit performed March 5 through April 7, 1993. However, there were other specialized audits of plant wide programs that were performed that included areas in the solid radioactive waste and transportation of materials pregram The inspector reviewed the following: a draft audit report of an audit conducted May 9 through July 5, 1994, titled " Performance, Training, and Qualifications," which included a review of radwaste personnel training; an audit conducted June 29 through August 31, 1993, titled " Procedure Revision i Process / Instructions, Procedures, and Drawings," which included a review of the Radwaste Department's methods for revising procedures; and an audit conducted February 11 through May 9, 1994, titled " Computer Codes and Software," which included a review of the vendor supplied computer program Radman that the Radwaste Department used for transportation purposes. The audits reviewed were very good and pertinent items were included in the licensee's self-assessment program. Corrective actions for audit findings were appropriate and timel Surveillance reports of quality assurance activities performed since the last inspection of the solid radioactive waste and transportation programs in June 1993 were reviewed for scope, thoroughness of program evaluation, and timely followup of identified deficiencies. The inspector reviewed the quality assurance surveillances performed during the period June 1993 through July 1994 in the areas related to the performance of the solid radioactive waste and transportation programs. Comprehensive quality assurance ,
surveillances were performed by qualified individuals to evaluate program '
activities and provided a means for periodic management oversight. The surveillances did not indicate any aoverse finding The licensee used a vendor to conduct radiochemical analysis required in 10 CFR Part 61. The inspector noted that the vendor was on the licensee's Qualified Seppliers List. The licensee used an audit performed by another utility in March 1993 to maintain the vendor on the quhlified lis The inspector noted that the licensee had reviewed the audit of the vendor for appropriateness to their program. Also, the licensee's personnel performed a
- - - - - . - . ._ . __ _- . _ _
. .
i-4- !
l vendor audit of the company that distributes and supports the Radman computer program used by the Radwaste Department to ship radioactive waste. The vendor '
audit was performed March 30-31, 1993, and identified pertinent findings and observations. The licensee tracked the findings and observations to ensure that appropriate corrective actions were taken by the vendo The inspector reviewed selected Condition Reports that pertained to the solid !
radioactive waste and transportation programs. The inspector noted that they were handled appropriately, and corrective actions had been taken. The responses to corrective actions were noted to be timely, except for one. The inspector asked about the timeliness of the response and was informed that the reason that the response did not appear to be timely was that the scope of the corrective actions was increased part way through the originally allotted response time, which caused the response to be overdu :
1.2 Changes j The inspector reviewed the organization, management controls, staffing, and !
the assignment of solid radioactive waste and transportation program responsibilities for changes. The inspector noted that there had been no ;
'
major changes in facilities, equipment, programs, and procedures that would have adversely affected the solid radioactive waste management and transportation of radioactive materials programs since the last inspectio ;
i The inspector noted that only minor organizational changes had been made to ,
the program. The changes in the Radwaste Department included the upgrading of i a deconner position to that of a health physics technician positio This was t a very good change that added some technical depth to the departmen It was I also noted at the time of the inspection that the position was vacant. The !
'
individual that occupied the position accepted a promotion at another Entergy plant. The licensee was reviewing the vacancy to determine whether the ;
position would be fille l Only minor changes to procedures were noted. The majority of the changes were !
in response to the title of the head of the Radwaste Department changing from j Radwaste Supervisor to Radwaste Forema i 1.3 Training and Qualifications
,
t i
The inspector reviewed the training and qualification programs for personnel responsible for implementing the solid radioactive waste and transportation of radioactive materials programs. The licensee has established a good training program. The inspector discussed radioactive waste training and lesson plans :
with the radioactive waste instructor. The qualifications of the instructor were reviewed and found to be appropriate. The instructor had recently i attended a vendor's radioactive waste and shipping course for training i personne l t
The inspector reviewed initial and continuing traini g irovided to radioactive i waste personnel and noted that it was appropriate, lhe inspector noted that ;
all of the radwaste personnel had attended a vendor taught transportation ,
i L
!
.. . .
l l
,
-5-training course and met the licensee's required qualification The Radwaste '
Foreman had attended appropriate training within the last yea The instructor mentioned to the inspector that for 1994, the licensee planned to have the Radwaste Foreman and designated personnel attend a vendor ,
transportation course and a Radman computer course, instead of providing the training to all radwaste personnel as had been the practice in the pas The inspector noted that most of the personnel that had taken the vendor course ,
annually were decor personnel, who were not directly responsible for the shipping and transportation of radioactive waste. A review of the licensee's response dated June 16, 1983, to NRC Bulletin 79-19, " Packaging of Low-Level Radioactive Waste for Transport and Burial," stated that training and periodic retraining of radwaste personnel involved in the transfer, packaging, and transport of radioactive materials would be accomplished in accordance with Radwaste Procedure RW-1-410, "Radwaste Personnel Qualifications." The procedure did not require radwaste helpers (decon personnel) to have the type of vendor training that had been provided to them annually. Therefore, the past practice of providing the training to all radwaste personnel was beyond the licensee's commitment to NRC Bulletin 79-19. The procedure specified the positions and the training requirements for each position. The inspector noted that the procedure had been deleted in 1985, and the contents were switched to the licensee's training manual. The inspector reviewed the corresponding procedures in the training manual and noted that the training procedures did not detail, as the previous procedure had, the positions (personnel) which required training in response to NRC Bulletin 79-19. This was discussed with the licensee and, before the exit meeting, the licensee revised the procedure for initial training of radwaste personnel to indicate the positions that required the training in response to NRC Bulletin 79-1 However, the inspector noted that the procedure for periodic retraining of radwaste personnel had not been revised. This was discussed with the licensee and, at the exit meeting, John Houghtaling, the Technical Services Manager, committed to revise Training Procedure NTC-238, "Radwaste Services Continuing Training," to iriclude the radwaste personnel required to attend periodic training in response to NRC Bulletin 79-1 .4 Solid Radioactive Waste Management The inspector reviewed selected radioactive waste procedures that implemented the licensee's solid radioactive waste management program. The inspector noted that good quality procedures had been established for the processing and disposal of low-level radioactive waste, and the procedures met the requirements of the licensee's Technical Specification t The licensee had shipped for burial the majority of radioactive waste onsite before the burial site was closed to them on July 1, 199 As part of the licensee's long-range radwaste management plan, the licensee had been keeping abreast of the burial site development in their compact and have reviewed their storage capabilities. The licensee estimated that they have approximately 12 to 18 months of onsite space for generated radioactive wast The licensee's review of the burial site development indicated that their compact may not have a burial site for 5 years or mor Therefore, the licensee had been designing an onsite storage space for the amount of
. L
. .
i
!
-6-radioactive waste that they would generate in 5 years with the possibility of future expansions of another 5 years' inventory of radioactive waste. The licensee plans to have the design completed by September 1994, and the ,
building finished by July 1995. The licensee had not completed a 10 CFR 50.59 '
review or changes to their Final Safety Analysis Report for the building; therefore, these items will be reviewed during a future inspectio .5 Radioactive Waste Classification. Waste Characterization, and Shipping Reauirements ,
The inspector reviewed the licensee's radioactive waste procedures and found i the licensee's program for classification and characterization of radioactive waste to meet the requirements of 10 CFR Part 61. The licensee and a
~
contractor laboratory performed radiochemical analyses on samples of various radioactive waste types as required in 10 CFR 61.55 and 61.56. The inspector noted that the sample analyses had been completed at the proper frequenc The test sample analyses results were used for determination of radwaste classification and radionuclide composition of the radwaste sources. The licensee performs radionuclide analyses for radionuclide characterization on radioactive waste packaged for shipment and burial and employs correlation factors for characterization of radionuclides not directly identifie The inspector reviewed selected radioactive waste shipment manifests and shipping papers that accompanied the licensee's shipments of radioactive waste. The inspector determined that the completed manifests complied with the requirements of 10 CFR 20.200 .6 Transportation Activities The inspector reviewed the licensee's transportation program for shipment of radioactive materials and radioactive wast . Quality A.ssurance Program The licensee had maintained an approved (Approval 0604) quality assurance program in accordance with 10 CFR Part 71, Subpart H, for the transportation of radioactive materials. The approval expires June 30, 199 . Procurement and Selection of Packages The licensee used strong-tight containers for the shipment of radioactive waste. Most of the shipments were in sea / land containers which contained uncompacted waste that was shipped to vendors who segregated and repackaged the radioactive waste. Other shipments included laundry shipments in steel containers and shipping casks with spent resin in high integrity container The licensee was on the user's list for all NRC and DOT certified packages use The licensee maintained current documentation on the manufacturer's design testing, maintenance, and the NRC Certificate of Compliance for all radioactive material packages used by the license /' . .
-7-1. Preparation of Packages for Shipment The inspector verified that the licensee had procedures and checklists for the preparation of radwaste shipment These procedures provided for visual inspection of the package prior to filling the container, instructions for closing and sealing the container, marking and labeling requirements, and ,
determination of radiation and contamination limits. The licensee used a checklist to assure that the procedures were followed and that packages were properly prepared for shipment in accordance with NRC, DOT, state, and burial i site requirements. Discussions with licensee personnel indicated that the individuals involved in the transportation of radioactive waste and materials '
,
possessed a good knowledge of the procedures and NRC and DOT regulations pertaining to the preparation of packages for shipmen .6.4 Delivery of Completed Packages to Carriers The inspector verified that the licensee's procedures included the required NRC and DOT regulations. A review of selected records and shipping papers for i radioactive waste shipments indicated that the licensee had prepared appropriate manifests and shipping papers in accordance with approved .
procedures. The shipping papers included the necessary information to comply ;
with regulatory requirements. The licensee only used exclusive use carriers for all radioactive waste shipments and assured that the following items were in accordance with NRC and DOT regulations and station procedures: radiation levels were within required limits, transport vehicles were properly ,
placarded, surface contamination on packages did not exceed requirement levels, and blocks and/or braces were in place to prevent damage or shifting of the load during transi The inspector was not able to observe licensee activities involving radioactive materials shipments, because no shipments were performed during the period of the inspection. This was d':e to the fact that the burial site was closed to the licensee for shipment of radwaste, and the licensee did not have any laundry shipments scheduled for the wee .6.5 Records, Reports, and Notifications The inspector reviewed selected records of radioactive waste shipments made by the licensee during 1994. The licensee's shipments were adequately documented r
'
to meet NRC and D0T regulations. The licensee maintained records of all radioactive waste and materials shipments as required. The records included all shipping documentation, radiation surveys, and required notification data. t 1.7 Conclusions Very good audits and surveillances were performed by qualified individual The audits and surveillances identified pertinent findings and corrective actions for the findings were timely. There had been no major changes in facilities, equipment, programs, or procedures; only minor organizational and procedural changes were mad (. .
-8-The Radwaste Department had an adequate, well-qualified staff to meet staffing requirements. The licensee had maintained an excellent training program for radwaste personne Good implementing procedures had been established for the radioactive waste management progra Radioactive waste was shipped offsite for burial in the first half of 1994 to reduce the onsite inventor The low-level radioactive waste disposal program was conducted in accordance with the requirements of 10 CFR 20.2006, 61.55, and 61.5 The licensee maintained good implementing procedures that addressed waste classification and characterization, selection of packages, preparation of packages, and delivery of the completed packages to the carrier. Individuals responsible for transportation of radioactive waste were knowledgeable of the regulatory requirements and burial site license condition !
!
i
$
- - _
. - . _ . . - . . _ .
f 0 ATTACHMENT I PERSONS CONTACTED Licensee Personnel
- D. F. Boan, Quality Assurance Specialist
- J. Houghtaling, Technical Services Manager
- D. A. Landeche, Lead Supervisor, Radiation Protection Support
- S. Landry, Radwaste Foreman
- R. LeBlanc, Acting Licensing Manager
- A. S. Lockhart, Quality Assurance Manager
- R. Prados, Senior Engineer, Licensing L. Simon, Senior Engineer, Radiation Protection
- T. A. Thiesse, Modifications Manager, Plant Modification and Control 1.2 NRC Personnel E. J. Ford, Senior Resident Inspector
- Denotes personnel that attended the exit meeting. In addition to the personnel listed, the inspector contacted other personnel during this inspection perio EXIT MEETING An exit meeting was conducted on July 22, 199 During this meeting, the inspector reviewed the scope and findings of the report. The Technical Services Manager committed to revise a training procedure as discussed in Section 1.3 of this repor The licensee did not identify as proprietary, any information provided to, or reviewed by the inspector.