Confirms 931022 Telcon Between J Pellet & J O'Hern Re Arrangements Made for Administration of Licensing Exams at Plant.Exams Scheduled for Wk of 940228 & Will Be Part of IR 50-382/94-01
ML20059E538
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/27/1993
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Barkhurst R
ENTERGY OPERATIONS, INC.
References
NUDOCS 9311030257
Download: ML20059E538 (4)


Text

. - - - . .

..

UNITED STATES

'-

f[p Richk NUCLEAR REGULATORY COMMISSION f M R EGION IV

%1; f 611 RYAN PLAZA ORIVE, SUITE 400 AR LINGT ON, T E X AS 70011-8064

.G s, j

          • - 7 7 icqq

.

Docket: 50-382 License: NPF-38

,

.

Entergy Operations, In ATTN: Ross P. Barkhurst, Vice President Operations, Waterford P.O. Box B Killona, Louisiana 70066

,

SUBJECT: LICENSED OPERATOR EXAMINATIONS AT WATERFORD 3, NRC INSPECTION REPORT NO. 50-382/94-01 ,

s In a telephone conversation on October 22, 1993, between Mr. J. Pellet snd Mr. J. O'Hern, arrangements were made for the administration of licensing examinations at Waterford ,

The examinations are scheduled for the week of February 28, 199 Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) earlier that mont To prepare the examinations and meet the above schedule,-it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by November 30, 1993. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being reschedule The NRC will prepare and administer the written examinations in accordance u with ES-401 and ES-402 of NUREG-102 In order to conduct the requested exaniinations, it will be necessary for your staff to provide adequate space  ;

and accommodations on the date noted above. The NRC's guidelines for  :

administering the written examinations are described in ES-402, Attachment .

The NRC will' prepare and administer the operating tests.in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation. facility ,

available on the dates noted above. Your staff should retain the original  !

simulator performance data (e.g., system pressures, temperatures, and levels) j generated during the dynamic operating tests until the examination results are  !

fina !

l ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC j policies and guidelines that will be in effect while the written examination i and operating tests are being administere ;

I 9311030257 931027~

PDR ADOCK 05000382 '/ t i l

.

V P0fL l P j

'

- .

.. _ .- ._ _ _ . . -- ..

,

t l

..

l Entergy Operations, In Your staff should submit preliminary reactor operator and senior reactor operatnr license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications '

and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessar Final, signed applications certifying that all -l training has been completed should be submitted at least 14 days before the 4 first examination dat ,

-

This request is covered by Office of Management and Budget (OMB) Clearance ,

Number 3150-0101, which expires October 31, 1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying, and mailing  :

the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including ~ suggestions for reducing'this burden, to the Information and Records Management Branch, MNBB-  !

7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission,. Washington, D.C.,

20555; and to the Paperwork Reduction Project (3150-0101), Office of  ;

Information and Regulatory Affairs, NE0B-3019, Office of Management and  ;

Budget, Washington, D.C., 2050 Thank you for your cooperation in this matter. Mr. O'Hern has been advised of the policies and guidelines referenced in this letter. If you have any '

questions regarding the NRC's examination procedures and guidelines, please contact Mr. Lantz at (817)860-8158 or Mr. J. Pellet, Chief, Operations Section, at (817)860-815

Sincerely, S i Director Division of Reactor Projects Attachments: As stated cc w/ attachments:

Entergy Operations, In ATTN: Mark Ferri, Training Manager P.O. Box B Killona, Louisiana 7006 )

l Entergy Operations,-In _j

'

ATTN: Jay O'Hern, Training Supervisor P.O. Box B Killona, Louisiana 70066

}

l

. - . . - . - - - - . .. ., ... - - - .- . - .-

. . . .- -. . - -

-

l

..

.' i I

Entergy Operations, In bec to DMB w/ attachments (IE01) & (IE42)

bec w/ attachments distrib. by RIV: ,

J. L. Milhoan Resident Inspector l Section Chief (DRP/D) Lisa Shea, RM/ALF, MS: MNBB 4503 !

MIS System DRSS-FIPS j RIV File Project Engineer (DRP/f.)- )

Section Chief (DRP/TSS) D. Wigginton, NRR R. Lantz R. Lantz Reading File i J. Pellet '

i i

.

RIV:C/OS:DRS AD S_ AD:DR j D-6JPellet:cs (CT s TGwynn '5 s C ins 10/lM/93 h E,793 {0/g]/93 0

,

-,

. . -.

fr

.

Entergy Operations, In beccto;;DMB:w/ attachment d ::21) * ' {Ey) -

.

bec w/ attachments distrib. by RIV:

J. L. Milhoan Resident Inspector Section Chief (DRP/D) Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV file Project Engineer (DRP/D)-

Section Chief (DRP/TSS) D. Wigginton, NRR '

R. Lantz R. Lantz Reading File J. Pellet

,

d

i RIV:C/OS:DRS ADD:DRS AD:DRh j D-JPellet:cs <CTh,omds TGwynn < Collins 10/1M /93 o l793 {0/g]/93 0 020020

. -