IR 05000370/1982021
| ML20027B073 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 08/17/1982 |
| From: | Jape F, Andrea Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20027B072 | List: |
| References | |
| 50-370-82-21, NUDOCS 8209160326 | |
| Download: ML20027B073 (3) | |
Text
..
. -_ -
_ _.
-.-
-.
.
_.
-.
.. -. _. -
-
.
...-
-
-
-
.
A "%c UNITED STATES
+[t Io NUCLEAR REGULATORY COMMISSION g
g p,
REGION 11
)
g E
101 MARIETTA ST N.W SUITE 3100 I
o ATLANTA, GEORGIA 30303
'%.....$
,
Report No. 50-370/82-21 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name:
McGuire Unit 2 Docket No. 50-370 License No. CPPR-84 Inspection at McGuire site on Lake Norman, North Carolina Inspector:
ctivb ja.A
~ f~/[f2_
A. H. Johnson g //
Date signed 4cmk hoA 7//782_
Approved by:
F. Jape,' Se'ction Chief gf/
/
Date Si'ne'd g
,
Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY Inspection on August 3-6, 1982 Areas Inspected This routine, unannounced inspection involved 32' inspector-hours on site in the areas of preoperational test procedure reviewing and preoperational test witnessing.
Results Of the two areas inspected, no violations or deviations were identified.
!
!
8209160326 820824
!
PDR ADOCK 05000370 G
, _. _.. _ _ _.,. _.. _ _ _
. _ _. _ _. _. _. - _ _ _ _ _ _ -
~.. _, _ _ _ _ _ _ _. _ _ _ _ _, _. _ -... _ _ _.., _,.... _,., _...... _. _,. _
r
.
!
DETAILS 1.
Persons Contacted Licensee Employees
- W. M. Sample, Projects and Licensing Engineer
- H. B. Barron, Operations Engineer
- J. W. Boyle, Performance Engineer
- D. Mendezof f, Licensing Engineer Other licensee employees contacted included operators, test engineers, and technicians.
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on August 6,1982, with those persons indicated in paragraph 1 above.
The licensee acknowledged the inspector's comments and findings.
3.
Licensee Action on Previous Enforcement Matters Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Hot Functional Preoperational Test (70301, 70308, and 70314)
l The following test procedures were reviewed and witnessed to verify that testing, up to and including the 250 degree F plateau, was being conducted using approved procedures and that changes to these procedures were in accordance with station directives:
a.
TP/2/A/1100/01, Controlling Procedure for Hot Functional Testing j
b.
TP/2/A/1150/08, ASME Code Piping Thermal Expansion Test c.
OP/2/A/6100/01, Controlling Procedure for Unit Startup The following test procedures were reviewed:
-
TP/2/A/1350/38, D/G and Load Sequencer Pre-HFT Checkout
F.
,,
-
MCS-1117.00-00-0018. Specifications for Shimming of Major NSS Equipment Supports and Reactor Coolant System Thermal Expansion
-
OP/2/A/6100/02, Controlling Procedure for Unit Shutdown The above inspection was also performed to verify that the commitments identified in FSAR Section 14. Table 14.1.3-1 (page 25), 3.9.1.1, 3.9.1.2, and supplements Q413.16 and Q413.23 had been incorporated into the preoper-ational testing procedures being implemented during hot functional testing.
Within the areas inspected, no violations or deviations were identified.
-
-
-
.
.
-