3
.
..
,
nt:o
UNITED STATES
%
NUCLEAR REGULATORY COMMISSION g
a REGION 11
o, 101 MARIETTA ST., N.W., EdlTE 3100 Y
ATLANTA, GEORGIA 30303
%.....o Report No. 50-370/82-14 Licensee:
Duke Power Company 422 South Church Street Charlotte North Carolina 28242 Facility Name:
McGuire Docket No. 50-370 License No. CPPR 84 Inspection at McGuire site near Charlot
, North Carolina Inspector
_
-. _,&e of _
'/ M' [E-
. D. Gibbons,
-
~ ' ~ ~-
/
' Date Signed
.
Approved bDy
.
/W"
)~2' [M T. E. Conlon, Section Chief Date Signed Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY Inspection on June 15-18, 1982 Areas Inspected This routine, unannounced inspection involved 27 inspector-hours on site in the areas of Licensee Identified Items and Review of as-built drawings.
Results Of the areas inspected, no violations or deviations were identified.
8208030409 820708 PDR ADOCK 05000370 G
PDR L
.-
-
.-
-
_
-
-
.
.
,
1 REPORT DETAILS 1.
Parsons Contacted Licensee Employees
)
- M. S. Starnes, Senior Construction Engineer
?
- J. W. Willis, Project GA Engineer
- E. B. Miller, Senior QA Engineer
.
,
'
- J. M. Hoover, Supervisor Electrical Technical Supports (TS)
- K. W. Allgood, Engineer Electrical TS
't NRC Resident Inspector P. Bemis P. Hopkins
- Attended exit interview
!
2.
Exit Interview l
The inspection scope and findings were summarized on June 18, 1982, with those persons indicated in paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings Not inspected.
-
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Review of As-Builts ( 37051B)
The inspector selected three cable tray segments to assure that the SAR and j
QAM requirements were complied with in the areas of location, routing, supports, separation, loading and identification.-The tray segments examined i
were identified by junction points 12730 to 12734; 7925 to 8445 and to 8444; i
l and 8219.
The inspector selected three as-built cable routings for examination to assure the SAR and QAM requirements were complied with in the areas of routing, identification, protection and separation.
The cables examined were 2*CA717, 2*VC504 and 2*NC792. The inspector verified the terminations at cabinet.2ATC4 for cable 2*VC504 and at cabinet 2ATC4 for cable 2*CA717.
.
The. terminations for cable 2*NC792 were not accessable because of con-l struction work.
!
Within the areas examined there were no violations or deviations identified.
I
!-
,
__i
_ _
_. _ _.
.
_
_
-
- _.
.
--
.
.-
._.______
..
..
I
6.
Licensee Identified Items i
a.
(Closed) Item 370/81-14-01 " Electrical Cable Tray S&b)smic Supports" (10 i.
CFR 50.55(e)).
The final report was submitted on April 16,1981. The
report has been reviewed and determined to be acceptable.
The in-
'
l spector held discussions with responsible licensee representatives, reviewed supporting documentation, and observed representative samples
'
of work to verify that the. corrective actions identified in the report have been completed.
The licensee has performed the siesmic calcu-
'
lations ar.d installed the necessary supports.
b.
(Closed) Item 370/CDR 82-02 " Failure of Cutler Hammer E30AA Switches" (10 CFR 50.55(e)). The final report was submitted on March 12, 1982.
The inspector held discussions with responsible licensee representa-tives and reviewed supporting documentation to verify that the
'
corrective action identified in the report has been completed.
The licensee has replaced the silver plated contacts with gold plated
contacts for all E30AA switches controlling 48 volts or less.
c.
(Closed) Item 370/CDR 81-11 "Use of Low Strength Stud Material" (10 CFR 50.55(e)). The final report was submitted on November 25, 1981. The report had been reviewed and determined to be acceptable.
The in-spector held discussions with responsible licensee representatives and reviewed supporting documentation to verify that the corrective actions
identified in the report have oeen completed.
The licensee has inspected and identified the nonconforming usage.. The low strength i
material was replaced with high strength material where rec,uired.