July 8, 1982
i
Duke Power Company
ATTN: Mr. W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
'
Gentlemen:
'
Subject: Report No. 50-370/82-14
This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of
1
this office on June 15-18, 1982, of activities authorized by NRC Construction
'
Permit No. CPPR-84 for the McGuire facility and to the discussion of our findings
,
i
held with Mr. M. S. Starnes, Senior Construction Engineer, at the conclusion of
the inspection.
l
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
1
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
,
I
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
,
Sincerely,
I
(Original signed by HCDance)
l
H. C. Dance, Chief
'
Reactor Projects Branch 2
Division of Project and
Resident Programs
f
Enclosure:
(See Page 2)
i
i
!
8208030329 820708
PDR ADOCK 05000370
0
'
T Eol
4
. --- .
_-
-_ .
-
.-.
_
.
,
,
a
Duke Power Company
2
July 8, 1982
Enclosure:
Inspection Report
No. 50-370/82-14
cc w/ encl:
M. D. McIntosh, Plant Manager
J. T. Moore, Project Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
i
(, )
i
R
RII
RII
RII
g
,,
TDGibthns:aw
T Conlon
ARHer t
AI
is
HCDqnce
/