IE Insp Rept 50-358/79-34 on 791107-08.No Noncompliance Noted.Majors Areas Inspected:Emergency Planning, Implementation Procedures & Planning Preparation
ML19257B252
Person / Time
Site: Zimmer
Issue date: 12/05/1979
From: Essig T, Oestmann M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19257B251 List:
References
50-358-79-34, NUDOCS 8001150413
Download: ML19257B252 (3)


Text

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-358/79-34 Docket No. 50-358 License No. CPPR-58 Licensee:

Cincinnati Gas and Electric Company 139 East 4th Street Cincinnati, Ohio 45201 Facility Name:

Wm. H. Zimmer Nuclear Power Station Inspection At:

Zimmer Site, Moscow, OH Inspection Co ducted: November 7-8, 1979 (2f6fh Inspector:

tmann t

Approved By: T H. Es g, Chief 12f5fh Environmental and Special Projects Section Inspection Summary:

Inspection on November 7-8, 1979 (Report No. 50-358/79-34)

Areas Inspected: Routine, announced preoperational inspection of emergency planning for Unit 1, including review of the licensee's proposed emergency planning implementing procedures and observation of emergency planning pre-paration.

The inspection involved sixteen inspector-hours on site by one NRC inspector.

Results: No apparent items of noncompliance or deviations were identified during this inspection.

8001150 4/3 1749 202

.

DETAILS

.

1.

Persons Contacted E. A. Borgmann, Vice President Engineering J. Flynn, Manager, Licensing and Environmental Affairs G. Pemberton, Principal Licensing Engineer S. Salay, Manager, Nuclear Production J. Schott, Plant Superintendent, Zimmer Site

  • P. King, Assistant Superintendent, Zimmer Site D. Erickson, Rad Chem Supervisor
  • J. M. Niswander, Health Physics Technician G. Ficke, Licensing Engineer
  • Denotes those present at the plant exit interview 2.

Emergency Planning Preparation A technical review meeting, open to the public, was held between the licensee representatives and NRC representatives on November 7, 1979, regarding the need to revise the licensee's proposed emergency plan dated July 1979 in accordance with new guidance in NUREG 0578 and 0610. Revisions to the licensee's emergency plan are due from the licensee on December 17, 1979. On November 8, 1979, the meeting on emergency planning was open to the States (Ohio and Kentucky) and local counties, and to the public.

The licensee's revised emergency plan will be reviewed by NRC prior to its approval. The inspector will examine the licensee's coordination with offsite support agen-ies during a furture inspection.

3.

Emergency Plan Implementing Procedures (EPIPs)

At the time of this inspection, the licensee had prepared the follow-ing twelve EPIPs.

OP.EPP.01 Fire and Explosion OP.EPP.02 Tornado OP.EPP.03 Flooding OP.EPP.04 Earthquake OP.EPP.05 Personal Injury OP.EPP.06 General Emergency OP.EPP.07 Fuel Handling Emergency OP.EPP.08 Airborne Release Calculations OP.EPP.09 Waterborne Release Calculations OP.EPP.10 Personnel Accountability and Station Evacuation OP.EPP.12 Emergency at Adjacent Properties OP.EPP.13 New Fuel Emergency-2-1749 203

The licensee will be required to review these procedures in light of of revised emergency plan. This list of procedures is considered to be incomplete and will remain as an open item. They will be reviewed during a further inspection.

4.

Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on November 8, 1979. The in-spector summarized the scope and findings of the inspection. The licensee acknowledged the need to revise the EPIPs to be in accordance with new NRC guidance.

.