IR 05000358/1979007
| ML19261C213 | |
| Person / Time | |
|---|---|
| Site: | Zimmer |
| Issue date: | 03/12/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Borgmann E CINCINNATI GAS & ELECTRIC CO. |
| References | |
| NUDOCS 7903200192 | |
| Download: ML19261C213 (3) | |
Text
~ ' ' ' ~ **
~
'
T
.
TEM -
'
4#
(g UNITED STATES c
NUCLEAR REGULATORY COMMISSION y
$
g REGION til
f 799 ROOSEVELT ROAD
$,
GLEN ELLYN, ILLINOIS 60137 NR 12.1979 Cincinnati Gas and Electric Company ATTN:
Mr. Earl A. Borgmann
-
Vice President Engineering 139 East 4th Street
'
Cincinnati, OH 45201
-
Gentlemen:
Please replace page two of the transmittal letter and report cover sheet numbered 50-358/79-01, from NRC Region III, Reactor Constructior and Engineering Support Branch with the attached replacements numbered 50-358/79-07.
The originals were incorrectly numbered. Thank you.
.
Sincerely, t
-
G. Fiorelli, Chief Reactor Construction and Engineering Support Branch
Enclosure:
As stated
REGION III==
Report No. 50-358/79-07 Docket No. 50-358 License No. CPPR-88 Licensee:
Cincinnati Gan and Electric Compcny
.
139 East 4th Street Cincinnati, OH 45201 Facility Name:
W. H. Zimmer Nuclear Power Plant Inspection At:
W. H. Zimmer Site, Moscow, OH t
Inspection Conducted: January 23-26, 1979 W
.Y2
~7 Inspectors:
H. M. Wescotr
' JG'
3[!
Erb
/
7f
.
3lff 79 7a Bd
.
J. Hughes b
'?//l? 9 P. Barrett
'
Observer:
T. H. Daniels Approved By:
R. C Kno f
Projects Section Inspection Summary Inspection on January 23-26, 1979 (Report No. 50-358/79-07)
Areas Inspected: Review of quality records for Class 1 and 2 valves, NDE records for feedwater nozzle modification, observation of work activities and QA records for instrumentation, calibration records, electrical testing, design change control, NDE implementing procedures, piping QA records and nonconformance reports, weld material control, RHR system, and 50.55(e) steam jet air ejector. The inspection involved a total of 112 inspector-hours onsite by four NRC inspectors.
.
Results: Four items of noncompliance were identified in four of ten areas inspected.
(Infractions - use of unapproved procedures,Section II,
Paragraph 5 and Section III, Paragraph 5.b; Deficiencies - inadequate review of test procedures,Section II, Paragraph 3.b. and thermometers not installed in weld rod ovens.Section III, Paragraph 4c.
'.
.
e*
w.-.-
..
,.
y