IR 05000346/2025011

From kanterella
Jump to navigation Jump to search
Post-Approval License Renewal Phase 4 Report 05000346/2025011
ML25218A164
Person / Time
Site: Davis Besse 
Issue date: 08/06/2025
From: Nestor Feliz-Adorno
NRC/RGN-III/DORS/ERPB
To: Tony Brown
Vistra Operations Company
References
IR 2025011
Download: ML25218A164 (1)


Text

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - POST-APPROVAL LICENSE RENEWAL; PHASE 4 REPORT 05000346/2025011

Dear Terry Brown:

On July 29, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Feliz Adorno, Chief Engineering and Reactor Projects Branch Division of Operating Reactor Safety Docket No. 05000346 License No. NPF-3

Enclosure:

As stated

Inspection Report

Docket Number:

05000346

License Number:

NPF-3

Report Number:

05000346/2025011

Enterprise Identifier:

I-2025-011-0032

Licensee:

Vistra Operations Company, LLC

Facility:

Davis-Besse Nuclear Power Station

Location:

Oak Harbor, OH

Inspection Dates:

July 14, 2025 to July 29, 2025

Inspectors:

B. Jose, Senior Reactor Inspector

E. Magnuson, Reactor Inspector

A. Shaikh, Senior Reactor Inspector

Approved By:

Néstor J Feliz Adorno, Chief

Engineering and Reactor Projects Branch

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Post-Approval License Renewal; Phase 4 at Davis Besse Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted this Phase 4 Post-Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP). Per Inspection Manual Chapter 2516, the LRIP is the process used by NRC staff to verify the adequacy of Aging Management Programs (AMPs), Time Limited Aging Analyses (TLAAs), and other activities associated with the renew an operating license of a commercial nuclear power plant beyond the initial licensing period under Title 10 of the Code of Federal Regulations (CFR), Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. This inspection evaluated the licensee implementation of aging management activities by reviewing the AMPs listed below.

Post-Approval Site Inspection for License Renewal===

(1) Nickel Alloy Management Program
(2) Structures Monitoring Program
(3) Above Ground Steel Tanks Inspection Program
(4) Fire Water Aging Management Program
(5) One Time Inspection Program
(6) Inaccessible Medium Voltage Cables not Subject to 10 CFR 50.49 EQ Requirements Program

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 29, 2025, the inspectors presented the Post-Approval License Renewal; Phase 4 results to Terry Brown and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-2014-04548

Demin Water Supply Line Pipe Hanger Bent in Service Water

Tunnel

03/07/2014

CR-2014-12083

Volumetric Examination of Reactor Coolant System Branch

Connection Butt Welds Under ASME Code Case N-770-1

07/22/2014

CR-2016-09196

2016 Structures Monitoring; Room 30; Thru Wall Crack

Identified

07/26/2016

CR-2021-04894

Service Water Tunnel Ceiling Leak Impacting Conduits

Below

06/23/2021

CR-2022-09153

FSWOLs Item F-1 Compliance Review with 1 Additional

Weld Required for 4th Interval

11/30/2022

CR-2023-04143

Inadequate Timeliness to Complete Repairs to Switchyard

Tower Foundations

05/17/2023

CR-2023-05494

Transformer Structures Monitoring Inspection Findings

07/13/2023

CR-2023-05610

Manhole 3044 Support Degradation

07/18/2023

CR-2023-06260

Structures Monitoring - Turbine Building 567' Level

08/11/2023

CR-2023-06565

Structures Monitoring - Turbine Building North Slab

08/23/2023

CR-2023-06910

Structures Monitoring - Decay Heat Exchanger Pit

Intermediate Deficiency

09/07/2023

CR-2023-07979

Auxiliary Building Roof EN-DP-01511 Intermediate

Deficiency

10/24/2023

CR-2023-07990

Structures Monitoring - Diesel Oil Pump House

10/24/2023

CR-2023-08369

Structures Monitoring - Water Treatment Facility

11/08/2023

CR-2023-08568

Structures Monitoring - Service Water Tunnel and Valve

Rooms Deficiencies

11/16/2023

CR-2023-08841

Aging Management Inspection Scope Does Not Include

Stairwell AB-1

11/29/2023

CR-2023-08974

Structures Monitoring - BWST Trench Intermediate

Deficiencies

2/06/2023

CR-2024-03609

DB1R23 Cooling Tower and Canal Inspection Results

04/24/2024

71003

Corrective Action

Documents

CR-2024-03873

Leakage from Service Water Tunnel Ceiling Dripping on

Service Water Piping

04/30/2024

71003

Corrective Action

Documents

CR-2025-03016

Structures Monitoring - BWST Trench Intermediate

Deficiencies

04/21/2025

CR-G201-2008-

49007

Demin Water Header in Service Water Tunnel is Impacting

Plant Equipment

11/06/2008

Corrective Action

Documents

OE-2015-0418-5

RIS 15-10, Applicability of ASME Code Case N-770-1 as

Conditioned in 10 CFR 50.55a, Codes and Standards, to

Branch Connection Butt Welds

08/03/2015

CR 2025-05109

25 LR Phase 4 Inspection: NRC-Identified Temporary

Heater in DFP Room not Sufficiently Secured

07/16/2025

Corrective Action

Documents

Resulting from

Inspection

CR 2025-05360

25 LR Phase 4 Inspection: NRC-Identified Improvement

Opportunity for DB-FP-04035 Acceptance Criteria

07/28/2025

ISI-SK-006

Reactor Vessel Instrumentation Nozzle Details

M-503-00095

Reactor Vessel Details

M-503-00214

Instrument Nozzle Detail and Assembly

Drawings

M-503-00224

Modified Instrumentation Nozzle

Engineering

Changes

2-0764-000

Intake Canal Embankment

03/26/2013

CTLGroup Project

No. 000110

Petrographic Examination of Concrete Cores from Davis-

Besse Nuclear Power Plant, Oak Harbor, Ohio

03/26/2021

LRPD-05

Aging Management Program Evaluation Results - Fire Water

Program

LRPD-05,

2.11

Aging Management Program Evaluation Results - One Time

Inspection Program

LRPD-05;

4.3

Aging Management Program Evaluation Results for

Inaccessible Power Cables not Subject to 10 CFR 50.49

Requirements

Engineering

Evaluations

LRPD-06

Aging Management Program Evaluation Results - Above

Ground Steel Tanks Inspection Program

20-Vendor-003

Ultrasonic Examination of RC-MK-B-61-1-SW69A OWOL

03/13/2018

20-Vendor-006

Ultrasonic Examination of RC-MK-B-56-1-SW143A OWOL

03/13/2018

20-Vendor-009

Ultrasonic Examination of RC-MK-B-61-1-SW69A OWOL

03/14/2018

2-Vendor-001

Bare Metal Visual Examination of Reactor Pressure Vessel

Bottom Head and Instrument Penetrations

03/21/2022

24P-VT-033

Bare Metal Visual Examination of Hot Leg Level Tap RC-MK-

2-1-WLB

03/22/2024

71003

NDE Reports

API 653

Out of Service Inspection Report CST T31-2

04/10/2016

API 653

Out of Service Inspection Report CST T31-1

04/10/2016

API 653

In Service Inspection Report DOST T-45

04/08/2016

BOP-PT-16-085

PT Exam of 25 Locations on BWST 1-1

09/21/2016

BOP-UT-16-048

UT Exam of 25 Locations on BWST 1-1

09/22/2016

BOP-VT-16-083

VT-3 of T31-1 CST Inside Surface

04/11/2016

BOP-VT-16-084

VT-3 of T31-1 CST Outside Surface

04/11/2016

BOP-VT-16-101

VT-3 of T31-2 CST Inside Surface

04/14/2016

BOP-VT-16-102

VT-3 of T31-2 CST Outside Surface

04/14/2016

BOP-VT-16-184

VT-1 of BWST 1-1 Outside Surfaces

09/22/2016

BOP-VT-25-006

VT-3 of BWST Tank for Aging Mechanisms

06/03/2025

DB-VE-1R23-001

Ultrasonic Examination of DH-33A-CCA-4-1-FW1 Overlay

03/22/2024

DB-VE-1R23-002

Ultrasonic Examination of RC-MK-A-67-3-FW105B Overlay

03/22/2024

NUC2016118

Ultrasonic Thickness (UT) Examination of Borated Water

Storage Tank (BWST) Floor

DB-FP-04035

Year Flow Test

DB-OP-06272

Station Drainage and Discharge System

DB-PF-00104

Inservice Inspection Program

DB-PF-00108

Alloy 600/690 Management Program

DB-PF-00108

Alloy 600/690 Management Program

EN-DP-01511

Structures Monitoring

EN-DP-01521

Administrative Procedure; Inaccessible Power Cables Not

Subject to 10 CFR 50.49, Environmental Qualifications

Requirements

ISIS-5

Fifth Ten Year Inservice Inspection Schedule

NG-EN-00552

Administrative Procedure for One Time Inspection Program

NOP-CC-5003

Processing Deviations to Materials Initiative Guidance

NOP-CC-5708

Written Practice for the Qualification and Certification of

Nondestructive Examination Personnel

NOP-CC-5735

System Leakage (VT-2) Examinations

NOP-ER-2003

Alloy 600/690 Management Program

NOP-OP-1012

Material Readiness and Housekeeping Inspection Program

Procedures

NOP-WM-4007-

Excavation Permit

Procedures

WDI-STD-1151

Generic Procedure for the Manual Ultrasonic Examination of

Weld Overlaid Similar and Dissimilar Metal Welds Using

EPRI-WOL-PA-01

200380013

DOST T-45 Internal Inspection

08/19/2021

200556326

Intake Canal Embankment

2/12/2014

200600767

Core Boring in ECCS Pump Rm 1

2/14/2014

200631788

DOST T-45 Calking Inspection

09/16/2016

200675052

DB-T31-1 CST External Visual Exam and UT PM

01/18/2019

200675053

DB-T31-2 CST External Visual Exam and UT PM

2/12/2019

200882586

DOST T-45 PM

01/08/2024

200919164

BWST Pit Structures Monitoring Inspection

04/21/2025

71003

Work Orders

200919196

Remote Insp Mkup/Purif FItr Rm

05/21/2025