IR 05000346/2025005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Davis-Beese Nuclear Power Station Report 05000346/2025005
ML25237A166
Person / Time
Site: Davis Besse  
Issue date: 08/28/2025
From: Sanchez-Santiago E
NRC/RGN-III/DORS/RPB2
To: Tony Brown
Vistra Operations Company
References
IR 2025005
Download: ML25237A166 (1)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR DAVIS-BESSE NUCLEAR POWER STATION (REPORT 05000346/2025005)

Dear Terry Brown:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Davis-Besse Nuclear Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

August 28, 2025 Please contact me at 630-829-9520 with any questions you have regarding this letter.

Sincerely, Elba M. Sanchez Santiago, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000346 and 07200014 License No. NPF-3 Enclosure:

Inspection Plan cc: Distribution via LISTSERV Signed by Sanchez Santiago, Elba on 08/28/25

ML25237A166

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE RIII RIII NAME RNg:gmp ESanchezSantiago DATE 08/25/2025 08/28/2025

Site Inspection Activity Plan Davis-Besse 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline Inspection

1 7/7/2025 7/11/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation License Renewal Phase 4

1 7/14/2025 7/29/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security Baseline Inspection - DAV

1 7/28/2025 7/31/2025 IP 71130.07 000739 Security Training

7/28/2025 7/31/2025 IP 71130.09 001656 Security Plan Changes

7/28/2025 7/31/2025 IP 71151 001338 Performance Indicator Verification Functional Engineering Inspection - Aging of SSCs - DAV

1 10/20/2025 11/7/2025 IP 71111.21N.04 001832 Age-Related Degradation Radiation Protection Baseline Inspection - DAV

1 10/20/2025 10/24/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

10/20/2025 10/24/2025 IP 71124.04 000728 Occupational Dose Assessment

10/20/2025 10/24/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program

10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification Eplan and EAL Changes Review - DAV

1 11/1/2025 12/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Davis Besse 2026 Initial License Examination

1 1/11/2026 1/17/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

2/8/2026 2/21/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Inservice Inspection - DAV

1 3/2/2026 3/20/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Radiation Protection Baseline Inspection - DAV

1 3/9/2026 3/13/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

3/9/2026 3/13/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

3/9/2026 3/13/2026 IP 71124.04 000728 Occupational Dose Assessment

3/9/2026 3/13/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation Security Baseline Inspection - DAV

1 4/27/2026 5/1/2026 IP 71130.01 000733 Access Authorization

4/27/2026 5/1/2026 IP 71130.08 000740 Fitness-For-Duty Program Security Baseline Inspection - DAV

1 5/18/2026 5/22/2026 IP 71130.02 000734 Access Control Prepared on 8/27/2025 5:27:15 PM 1 of 4

Site Inspection Activity Plan Force-on-Force Planning and Exercise Weeks - DAV

1 5/18/2026 5/22/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

6/8/2026 6/12/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Radiation Protection Baseline Inspection - DAV

1 6/8/2026 6/12/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation Security Baseline Inspection - DAV

1 7/20/2026 7/24/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

7/20/2026 7/24/2026 IP 71130.09 001656 Security Plan Changes

7/20/2026 7/24/2026 IP 71151 001338 Performance Indicator Verification Emergency Preparedness Baseline Inspection / Performance Indicator Verification - DAV

1 8/10/2026 8/14/2026 IP 71114.02 000717 Alert and Notification System Testing

8/10/2026 8/14/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

8/10/2026 8/14/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness

8/10/2026 8/14/2026 IP 71151 001397 Performance Indicator Verification Functional Engineering Inspection - Fire Protection - DAV

1 8/17/2026 9/4/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

EAL & EPlan Changes Review - DAV

1 11/1/2026 12/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Davis-Besse 2026 Licensed Operator Biennial Requalification Program Inspection

1 11/8/2026 11/14/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Triennial Material Control and Accounting Inspection - DAV

1 1/1/2027 12/31/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)

Functional Engineering Inspection Placeholder - DAV

1 1/25/2027 2/12/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)

Radiation Protection Baseline Inspection - DAV

1 2/1/2027 2/5/2027 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Cyber Security - DAV

1 4/26/2027 4/30/2027 IP 71130.10 000741 Cybersecurity Emergency Preparedness Exercise Inspection / Performance Indicator Review - DAV

1 5/10/2027 5/14/2027 IP 71114.01 000716 Exercise Evaluation

5/10/2027 5/14/2027 IP 71114.08 000723 Exercise Evaluation - Scenario Review

5/10/2027 5/14/2027 IP 71151 001397 Performance Indicator Verification Security Baseline Inspection - DAV

1 5/17/2027 5/21/2027 IP 71130.02 000734 Access Control

5/17/2027 5/21/2027 IP 71130.05 000737 Protective Strategy Evaluation Prepared on 8/27/2025 5:27:15 PM 2 of 4

Site Inspection Activity Plan

5/17/2027 5/21/2027 IP 71130.09 001656 Security Plan Changes Prepared on 8/27/2025 5:27:15 PM 3 of 4

Site Inspection Activity Plan Davis-Besse 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count ISFSI Program Review and License Renewal Inspection

8/18/2025 8/22/2025 IP 60855 001001 Operation Of An ISFSI 8/18/2025 8/22/2025 IP 60859 001921 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection ISFSI Preoperational and Initial Loading Inspection

5/24/2027 5/28/2027 IP 60854 001000 Preoperational Testing Of An ISFSI 5/31/2027 6/4/2027 IP 60855 001001 Operation Of An ISFSI 6/7/2027 6/11/2027 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations Prepared on 8/27/2025 5:27:15 PM 4 of 4