Text
.,
-
-
..
-
..
.
,
,
-
..,
-
,,. -
.
'
O
'
.
,
!
U. S. NUCLEAR REGULATORY C0124ISS10N
>
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
<
i l
-
Report of Construction Inspection
,
IE Inspection Report No. 050-346/75-24
.
Licensee:
Toledo Edison Company Edison Plaza
300 Madison Toledo, Ohio 43652 License No. CPPR-80 Davis-Besse Nuclear Fower Station Category: B Unit 1
Oak Harbor, Ohio
.
(
Type of Licensee:
.-.
,
Type of Inspection:
Routine, Announced Dates of Inspection:
December 22-23, 1975 and January 5-6, 1976 N
. W. bbh>on h kD "lb Principal Inspector:
Q
,y
.
Accompanying Inspector :
1. J. Key.1
$ - An,h,b (Date)
.
Other Accompanying Personnel: C. E. Norelius December 22-23,1975 (only)
l D. W. Hayes January 5-6, 1976 (only)
. l
!. 0 D.-
'
ca a:s
/
,
'
// 2/ / 7(,,
,
Reviewed By:
D. U. Hayes
/ (Date)
(
Section Leader.
Projects 1J
.
eoo11599/gf'd s
.
..
.
-
...
.
._
.
..
- -
-
-
.
.
.
-
,
.
.
m 0*
,
,
l
'
i 7-~
(
-
s_ -
.
.
SUtefARY OF FINDINGS Inspection Summary Inspection of Decembar 22-23, 1975, (75-24): Reviewed licensee's procedures for: (1) cleaning of the reactor vessel (2) aligning of the indexing fixture and trial fit up of the reactor internals. Also reviewed calibration records for measuring and test equipment used in the ficup.
One a
item esf noncompliance was identified relative to lack of procedures for inspe: tion and testing of the reactor building polar crane.
.
Inspection of January 5-6, 1976, Reviewed licensee's inspection records of the polar crane and a draf t inspection procedure titled, " System Procedure
.,
i S0.1104.46 PT.5199.02 for station cranes." Also observed the lif ting of reactor internals from the reactor vessel.
'
A.
Items of Noncompliance
'
'
1.
Violations
.-
,
None.
2.
Infractions
.
Contrary to 10 CFR Part 50, Appendix B, Criterion V, procedures for inspection and testing of the reactor building polar crane were not available.
Prior to the conclusion of the December 22-23, 1975,
inspection, the inspectors determined that the corrective action taken, with respect to this item, was adequate.
Consequently, no reply to this matter is required.
(Report Details, Paragraph 2)
'
"
License Action on Previously Identified Enforcement Items Lack of Documentation of RT Location 14 arks (IE Inspection Report No. 050-346 /7 5-21 and Letter dated December 10, 1975)
!
The licensee's reply to the above Notice of Violation / Infraction had not been received at the time of. the current inspection. This matter remains open pending receipt of an acceptable response from the licensee.
i
l
!
l
,
I
'
-2-
,
C/
-
.
.
l
..
_
_
,
_
. _ _ -__
_.. _.- _
_ _. _ _. _.,.. _. - -_ ____
r
..
,
-
-
-
.
- ,..
.
(
Other Significant Findings A.
S,ystems and Components
'
Unresolved Item Polar Crane 180 ton bhin Liftine Hook Inspection-December 22-23, 1975 The indications that were reported as a result of the MT inspection performed on the main hook were being mapped and evaluated by the licensee and contractors.
(Report Details, Paragraph 2)
Inspection of January 5-6, 1976 As a result of the evaluation by the licensee of MT indications in the eye of the 180 ton Polar Crane hook the hook was rejected and replaced. This iten is considered resolved.
(Report Details, Paragraph 2)
B.
Facility Items (Plans and Procedures)
,-
None.
\\
C.
Kanagerial Items The inspector was informed that the stop-work order issued to Bagwell Coatings Inc. (Bagwell) on July 22, 1974, relative to the painting of Q listed work has been lif ted as of December 16, 1975.
Q listed painting has been resumed.
D.
Noncompliance Identi.fied and Corrected by Licensee None.
E.
Deviations
.
None.
F.
Status of Previously Reported Unresolved Items 1.
Bagwell Coating, Incorporated (Bagwell) Ston-work Order (Inspection Reports No. 050-34 6 /7 5-07, No. 050-346/75-10, No. 050-346/75-20 and No. 050-346/75-23)
.
Toledo Edison Company has issued a letter, dated December 12, 1975, to Bechtel Power Corporation instructing them to lift the stop-work order on Q listed work that had been issued to
Bagwell on July 22, 1974.
This item is considered resolved, s_.-
.,.
se
.
.
.
-
.
-
-
,
,.
,,,
.
.
\\j 2.
Inappropriate Closure and Noncompliance Reports (NCR's)
(Inspection Reports No. 050-346 /7 5-03, No. 050-346/7 5-07, No. 050-346/7 5-13, No. 050-346/7 5-16, No. 050-346/7 5-20 and No. 050-346/7 5-23)
.
!
Results of the tests performed by the CVI Corporation on the charcoal used in the filters to determine the suitability for attentuation of radio-iodine as methyl-iodine have not been received on site.
This item remains unresolved.
3.
Incomplete Test Data (IE Inspection Reports No. 050-346/75-03, l'
No. 050-346 /7 5-07, No. 050-34 6 /7 5-13, No. 050-346/7 5-16, No. 050-346/75-20 and No. 050-346/75-23)
.
Results of the tests performed by CVI Corporation on the
" minimum elongation before rupture" tests of filters have not been received onsite. This item remains unresolved.
.
4.
Equipment Secured by "Hilti-Kwik" Devices (IE Inspection
Report s No. 050-346/7 5-10, No. 050-346/75-15, No. 050-346/75-16, No. 050-346/75-20 and No. 050-346/75-23)
'
The i<
- reviewed Bechtel letter FL14-3232 dated December 9, 1975
-. -Kwik" and determined that all wedge type "Hilti-s
-
Kwik' onchors used to mount essential equipment and supports would be retorqued to. demonstrate proper anchor installation.
'
This item remains unresolved.
5.
Motor Operated Valves (IE Inspection Reports No. 050-346/75-15, No. 050-346/7 5-16, No. 050-34 6/7 5-20 and No. 050-346/75-23)
-
The inspector was informed that documentation has been received from Velan Valves, Montreal, Canada pertaining to the Limitorque
,
'
Motor Operators furnished for the valves supplied by them. Docu-mentation has not been received from two other valve suppliers regarding their valves.
This item remains unresolved.
6.
Reactor Main Coolant Pumps - Repairs (IE Inspection Reports No. 050-346/7 5-16, No. 050-346/7 5-10, No. 050-346/75-21 and
'
No. 050-346/7 5-23)
The licensee indicated that the matter of the reactor coolant pump recertification is under discussion with u&W and remains
,
open pending review of the licensec's decision pertaining to i
rcradiographing of the repaired area. This item remains open.
.
.
-4-
> p)
.
tv
!
- MO
--
e-
. _.. _
_ _
, _ _. _, _,
..,,,
,,,.,, _
_, _ _ _ _ _.,,
._ _ _,.,, _
_
_.
._-_
_
_
_-._,
_
.__z_______
,
.
.
'
%,
Tp+*
.
-
,
i N
-'
7.
Reactor Protection and Safeguard System Cabincts -(IE Inspection leport No. 050-346/75-23)
The Protection and Safeguard Systems internal cabinet wiring appears to be in conflict with IEEE-279, Section 4.7.2.
IE headquarters staff has been notified of this item and it is under review.
8.
System for Electrical Retesting After Rework (IE Inspection Report No. 050-346/75-23)
,
No system for documentation was in effect which would pre-clude invalidating previously completed construction tests
relative to ongoing rework of electrical deficiencies.
Management Interview
i A.
The following persons attended the management interview at the conclusion of the~ inspection.
,
Toledo Edison Comoany (TECO)
December 23, 1975
\\
J. D. Lenardson, Quality Assurance Manager i
G. W. Eichenhauer, Field Quality Assurance Engineer C. T. Daft, Field Quality Assurar.ca Engineer J. Hughes, Quality Control Enginec t J. C. Buck, Quality Assurance Engineer January 6, 1976
J. P. Lenardson, Quality Assurance Manager G. W. Eichenhauer, Field Quality Assurance Engineer E. C. Novak, Proj ect Enginecr
.
R. E. Blanchong, Construction Superintendent J. Evans, Stations Superintendent E. M. Wilcox, Field Quality Assurance Engineer Bechtel Corporation (Bechtcl)
December 23, 1975 and January 6, 1976 C. L. Huston, Field Construction Ibnager (January 6 only)
J. L. Davis, Proj ect Superintendent (December 23 only)
J. D. i!caton, Proj ect Field Quality Control Engineer J. J. Ford, Quality Control Engineer G. G. Heiser. Quality Assurance Engineer
/'~'N P. R. Britnell, Qualxty Control Engineer (January 3 only)
,
,
e m
5.
i
,.
- __.
.
.
..
- -
-
-
-
--. -
--
= _
_
_ _ _
.
"
e.-
-
,
,
[
t Babcock and Wilcox Company (B&W)
.
December 23, 1975
J. W. Marshall, Quality Control Engineer i
D. E. Kinsala, Assistant Construction Manager B.
Matters discussed and comments, on the part of the management personnel, were as follows:
<
December 23, 1975
,
i 1.
The inspector stated that the inspection had been scheduled to review the reactor internal fit up procedures and observe the trial fitup of the reactor internals.
Due to conditions
>
and problems encountered with the Polar Crane and documented by TECO the inspection of the reactor internals trial fitup was not possible.
He further indicated that he had i
reviewed NCR 870 that had been issued on the Polar Crane indicating that the main hook had not been NDE examined as required by ANSI-B30.2 requirements.,. The inspector added that due to the fact that neither TECO or their contractors, Babcock and Wilcox or Bentley, had documented approved pro-cedures to cover the inspection testing and certification of lif ting equipment as required by 10 CFR, Part 50, Appendix B, Criterion V, an infraction in regard to this item would be issued.
Since the use of the equipment had been curtailed an NCR issued and procedures preparation was in progress the inspector stated that no reply to this item would be required.
(Report Details, Paragraph 2)
The licensee stated that the entire matter would be further reviewed and that steps had been taken to generate the l
necessary procedures to prevent this condition from reocurring.
2.
The inspector stated that he had also been informed and had been shown documentation that the stop-work order issued to
,
Bagwell had been lifted. He further added that during a
'
subsequent inspection IE:IIT. inspectors would examine Q painted areas previously coated within containment.
3.
The inspector stated that an unresolved item would be generated as a result of the inspection. This item pertains to review of the results of th'c MT examination of the main polar crane book.
,
e de
-
a
-,
.
.,aa
t
-- -
_
_
_
. _ _
,
. - _.. - -. -.
.. _ _
.
-
9,.
.
.
.
i January 6, 1976_
'
,
1.
The inspector stated that this inspection h' d been'rcscheduled a
to observe the trial fitup of the reactor internals and to resolve the probicms encountered during the December 22-23, 1975, inspection, lic further stated, that his observation of the lif ting of the reactor internals from the reactor vessel appeared to be in accordance with B&W approved trial fit up
!
l procedure No. 151.
,
!
2.
The inspector stated that he had reviewed the draf t of the i
station Polar Crane operation, testing and maintenance proce-
!
dures. He further indicated that the procedure did not include, f
in the inspection and maintenance section, inspection require-i ments of Chapter 2-2 of ANSI B30.2.0-1967. The licensee stated
that they would review this item.
3.
The inspector stated that the cleanliness of the reactor pool j
and reactor vessel had improved since the last inspection, and that necessary precautions should be taken to insure the cicanli-ness of the Reactor Vessel internals during the cleaning and painting of the containment vessel.
,
l
,
<
l,
,
.
!
J
.
.
7-
-
s.
.
-
---
- -.
-,,,
,,
e-
.
,,
m,
.m-_-
,.
.,,, _ _,,,,,,.,.
_., _.,
,
, _.,., _ _
..._
.
._
. _.
'
-
.
.
.
'
}
e.-
I
.
i i
\\_>
-
,
REPORT DETAILS
!
Personnel Contacted The following personnel, in addition to those listed in the Management Interview section were contacted during the inspection.
.
Toledo Edison Company (TECO)
J. Woods, Assistant Engineer (Power)
i
'
Babcock and Wilcox (B&W)
R. Sulser, Quality Control Engineer
'
Bechtel Corporation (Bechtcl)
J. Grover Quality Control Engineer Benticy Crane Company (Bentley)
,-
R. Sanders, Quality Control Manager
[
D. Haden, Safety Engineer
..
,
Results of Inspection
- l.
Reactor Vessel Cleanliness Inspection December 22-23, 1975 The inspectors reviewed Babcock and Wilcox Field Construction Procedure No. 156, Revision 0, Approved 12-8-75, Titled " Clean reactor vessels." During the visual inspection the inspectors
noted that the vessel had not been made ready for trial fitup of the reactor internals, scaf folding, cables, and other items were still in place in the vessel.
Inspection January 5-6, 1976 The inspector observed the cleanliness of the reactor pool and
-
reactor vessel, noting that improvements had been made to maintain the area in the required class "B" cleanliness level.
.
-h-
4J
.
.
.
.
.
., _.. -.
, _ _ ~. -,
-,.. _.. _
. -.,. _ _... -,. -
, --
.-
-
-.
. -.
.
.--
.
.
.
.
.
- a.
,
.
b\\
s-2.
Polar Crane Test and Inspection
,
Inspec tion-Dec ember 22-23, 1975
.
The incpectors requested documentary evidence that the Polar Crane had been inspected prior to a trial fitup of the reactor internals.
Monthly visual inspection records were available and reviewed.
llowever, no records were available to indicate that the crane had been inspected and tested as required by ANSI B30.2.0-1967, Chapccr 2-2, " Inspection Testing and Ibintenance of Cverhead and Gantry Cranes."
In addition, there were no instructions available to control the inspection of the crane.
On December 12, 1975, a Nonconformance Report No. 870 was generated indicating that the hooks of the Polar Crane had not received a magnetic particle inspection since Fbrch 3, 1972. As a result of
'
the NCR,. the 180 Ten polar crane hook S/N 8E770-P1 was magnetic particle tested. The test en December 22, 1975, showed that indications detected in the hook during an earlier inspection were still present in the 6" diameter hole however, evaluations of the test results had not been completed.
'
,
l Original record s in "Redock packet" - No. 93 indicated that the material of the polar crane hook had not received a physical test
'
)
when manufactured, however, a nonconformance report was generated, an engineering evaluation made, and the heck was accepted.
Other s/m i
original test results were'found to be in order.
I Inspection Januarv 5-6, 1976
'
The inspectors reviewed a nonconformance report (No. 881) issued on December 29, 1975, as a result of further evaluation of the MT indications in the eye of hook SIN 8E770-Pl. Also revicued were reports of a inspection of the Polar Crane performed by llarneschfeger Corporation on December 30, 1975, certifying the crane for use.
The Polar Crane hook and block assembly was removed and replaced with the 190 ton assembly from the Turbine Building Crane. The hook of
,
,
this assembly was MT inspected Ly Testmaster.
The MT report indicated i
that this hook was acceptable for use. The hook and bloch assembly
removed from the Polar Crane is being returned to the llarneschfcger Corporation for repair or replacement.
.
.
-9-LO l
.
I
.
.
-e s
,e
-
c-
-
-
m-
..
-
,w
, <,
-p-----,,r.e,n
. - -,
v--------------,-v-w,-
-
..
-
-
_
_
.-
'
.
.
.
,
,. -
'
-
.
\\s ')
3.
B&W Procedures - Reactor Internals Fitup
.
Inspection December 22-23, 1975
.
The inspectors reviewed the following procedures relative to installatior of Reactor Internals.
a.
B&W Field Construction Procedure No. 149, Revision 2, Align Indexing Fixture, approved December 5, 1975.
b.
B&W Field Construction Procedure No.151, Revision 0, Trial Fit Reactor Internals, approved July 22, 1975.
Inspection of January 5-6, 1976
'
,The inspectors reviewed the following procedures relative to installation of Reactor Internals and testing of cranes.
TECO Procedures-Cranes Testing (Drafts)
J i
a.
Periodic Test Procedure PT.5199.02 for,ptation cranes.
b.
System Procedure S.P. 1104.46 for the Polar Crane,
\\
B&W Procedure-Reactor Internals Vent Valves
[Y i
<
Field Construction Procedure No.194-Rev.0, for Installation
'
'
of Internals Vent Valves.
l Observation of Work (January 5-6, 1976)
The inspectors observed the lif ting of the Reactor Internals from the vessel, noting the scribe lines for indication of movenent of the Guide Blocks.
The inspecters determined that work was being performed in accordance with B&W approved procedures.
i Three Guide Blocks showed indications of bearing on the guides, these
'
are to be investigated and the raised metal removed by honing prior to a subsequent fit up of the Vessels Internals.
.
,