Forwards IE Insp Rept 50-346/75-24 on 751222-23 & 760105-06. Noncompliance Noted
ML19317F588
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1976
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19317F589 List:
References
NUDOCS 8001150910
Download: ML19317F588 (2)


See also: IR 05000346/1975024

Text

_

_

_

-

,

,.

.--

_.

..

__

._ . _ .

._.-_i_._

,

!=

-

.

Q

.

IE FILE COP 10

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGloN lli

799 ROOSEVELT ROAD

'

CLEN ELLYN, ILLINOIS 60137

JAN 22 1976

Toledo Edison Company

Docket No. 50-346

ATTN

Mr. Iowell E. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

'

Toledo, Ohio 43652

Gentlemen

,

This refers to the the inspection conducted by Mest,rs. Sutton

and Key of this office on December 22-23, 1975 and January 5-6,

1976, of activities at Davis-Basse Nuclear Power Plant Station

Unit 1 authorized by HRC Construction Permit No. CPPR-80 and

to the discussion of our findings with Messrs. Novak and

i

Lenardson and others of your staff at the conclusion of the

1

inspections.

A copy of our report of these inspections is enclosed and identi-

fies the areas examined during the inspections. Within these

areas, the inspections consisted of a selective =-4etion of

procedures cud representative records, interviews witl plant

personnel, and observations by the inspectors.

hiring the inspections, it was found that certain of your

activities appear to be in noncompliance with NRC require-

mants. The item and reference to the pertinent requirements

is listed under Enforcement Action in the Summary of Find-

ings section of the enclosed inspection report. Prior to

the conclusion of the inspections, the inspectors determined

that corrective action hcd been taken with respect to this item

of noncompliance and that neacureo have been tchen to assure

that a nimilar, future nonecc:pliance will be cvoided. Con-

sequently, no reply to this letter is required, and we hcve

no further qucations regarding this mattor at this time.

i

,, +

. .l Y , . l,

'

V ;?" ~

t

t. ),

1

E00 1150

s

,

O

f

- -

-

-

-

.

__

.

. .

-

..

a.

.

I

.

JAN 2 2 1976

,

2-

Toledo Edison Company

-

In accordance with Section 2.790 of the NRC's " Rules of

\\

Practica," Part 2, Title 10, Code of Federal Regulations, a

copy of this latter and the enclosed inspection report will

be placed in the NEC's Public Document Roota. If this report

contains any information that you or your contractors believe

'

to be propriatary, it is necessary that you make a written

application to this office, within twenty days of your

receipt of this latter, to withhold such information fresa

public disclosure. Any such application :cust include a full

stata= ant of the reasons for which it is clained that the

information is proprietary, and should be prepared so the

proprietary information identified in the application is

con McM in a separata part of the document. Unless va

e

receive an application to withhold information or are other .

visa contacted within the specified time period, the written

material identified in this paragraph will be placed in the

Public Document Room.

'

Should you have any questions concerning these inspecticus, we

will be glad to discuss them with you.

Sincerely yours,

.

1

.

.

D. M. Hunnicutt, Chief

Reactor Conscruction and

Engineering Support Eranch

.

Enclosura:

IE Inspection Rpt No. 050-346/75-24

bec w/ enc 1:

PDR

Local PDR

NSIC

,

TIC

U. Young Park

Nuclear Engineer

.

4

-- .,