Q
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGloN lli
799 ROOSEVELT ROAD
'
CLEN ELLYN, ILLINOIS 60137
JAN 22 1976
Toledo Edison Company
Docket No. 50-346
ATTN
Mr. Iowell E. Roe
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
'
Toledo, Ohio 43652
Gentlemen
,
This refers to the the inspection conducted by Mest,rs. Sutton
and Key of this office on December 22-23, 1975 and January 5-6,
1976, of activities at Davis-Basse Nuclear Power Plant Station
Unit 1 authorized by HRC Construction Permit No. CPPR-80 and
to the discussion of our findings with Messrs. Novak and
i
Lenardson and others of your staff at the conclusion of the
1
inspections.
A copy of our report of these inspections is enclosed and identi-
fies the areas examined during the inspections. Within these
areas, the inspections consisted of a selective =-4etion of
procedures cud representative records, interviews witl plant
personnel, and observations by the inspectors.
hiring the inspections, it was found that certain of your
activities appear to be in noncompliance with NRC require-
mants. The item and reference to the pertinent requirements
is listed under Enforcement Action in the Summary of Find-
ings section of the enclosed inspection report. Prior to
the conclusion of the inspections, the inspectors determined
that corrective action hcd been taken with respect to this item
of noncompliance and that neacureo have been tchen to assure
that a nimilar, future nonecc:pliance will be cvoided. Con-
sequently, no reply to this letter is required, and we hcve
no further qucations regarding this mattor at this time.
i
,, +
. .l Y , . l,
'
V ;?" ~
t
t. ),
1
E00 1150
s
,
O
f
- -
-
-
-
.
__
.
. .
-
..
a.
.
I
.
JAN 2 2 1976
,
2-
Toledo Edison Company
-
In accordance with Section 2.790 of the NRC's " Rules of
\\
Practica," Part 2, Title 10, Code of Federal Regulations, a
copy of this latter and the enclosed inspection report will
be placed in the NEC's Public Document Roota. If this report
contains any information that you or your contractors believe
'
to be propriatary, it is necessary that you make a written
application to this office, within twenty days of your
receipt of this latter, to withhold such information fresa
public disclosure. Any such application :cust include a full
stata= ant of the reasons for which it is clained that the
information is proprietary, and should be prepared so the
proprietary information identified in the application is
con McM in a separata part of the document. Unless va
e
receive an application to withhold information or are other .
visa contacted within the specified time period, the written
material identified in this paragraph will be placed in the
Public Document Room.
'
Should you have any questions concerning these inspecticus, we
will be glad to discuss them with you.
Sincerely yours,
.
1
.
.
D. M. Hunnicutt, Chief
Reactor Conscruction and
Engineering Support Eranch
.
Enclosura:
IE Inspection Rpt No. 050-346/75-24