IR 05000346/1975009
| ML19326A447 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/19/1975 |
| From: | Hayes D, Jablonski F, Sutton J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19326A444 | List: |
| References | |
| 50-346-75-09, 50-346-75-9, NUDOCS 8002040605 | |
| Download: ML19326A447 (11) | |
Text
fn.
%);,, a
..-
-.-
a.
.
t
.-
-
.
',.
-
.
.
,
,
'
'
.
.
.
.
.
,
-
.
UNITED STATES NUCLEAR RECUL* TORY COMMISSION OFFICE OF INSPECTION AND ENTORCDENT
,
,
REGION III
,
,
.
Report of Construction Inspection
\\
.
I
'
-
.
.IE Inspention Report No. 050-346/75-09
-
-
.
.
.
Licensee:
Toledo Edison Cc=pany
.
300 Madison Avenue
.
.
Toledo, Ohio 43652
'
.
~
Davis-Besse Nuclear Power Station License No. CPPR-80 Oak Harbor, Ohio Category:
B
.
'
Type of Liet.asee:
-
.
"
Type of Inspection:
Special, Unannounced
.
.
Dates of Inspection:
May 19 - 22, 1975
-
Iu b'" k'
Principal aspector:
.
.
(Date)
.
,
3p.pd-se
Accompanying Inspectors: F. J. Jablonski S -/ ~7~ 7 I (Date)
..L
'
-
Y' /7' 7I K.
. Naidu (Date)
~
,
,
'
'
Ce.w
-
b- /.7-73~
.
C. Et ones (Date)
.
.
.
Other Accompanying Personnel: None
-
-
[//7[7[
Reviewed By:
D.
y Senior Inspector
/ (Date)
~
Construction and Engineering
Support Branch
'
,
,
.
.
,
,- * Attachment 1
,
,
8 0 02 0 4(ht>$
I
.
..
..
.
..
.
.
.
..
.
.
.
-
-v
..
.
.
,
..
-
-
.
... -
-
.
,,
.
,
,
'
SUMMARY OF FINDINGS
,
.
'
-
.
.
s
.
-
..
Inspection Summarv
'
-
.
,
.
Rev?ewed i
Inspection of May 19-22, 1975 (75-09):
Special-Electrical, cable installation records and observed cable, raceway and support installatio'ns. Five (5) items of nonco=pliance were identified:
inadequate review of QA program; failure to translate seismic and electrical separation requirenents into specifications and procedures; failure to perform electrical inspections in accordance with procedures;
,.
acceptance of cable routing cards when cables were determined to have
'
been incorrectly routed; and failure to promptly correct conditions adverse to electrical construction.
.
.
,
.
.
.
Enforcement Action
-
.
.
A.
Items of Noncompliance 1.
Violatiens
,
,
Contrary to 10 CFR Part 50," Appendix 3, Crtierion II, the licensee has not reviewed the status, adequacy and i=ple=ent-
.
ation of the Quality Assurance Program.
Specific Items of Noncompliance with 10 CFR 50, Appendix 3, criteria III, V,
-
XIV, and XVI, when tiewed ecliectivel, indicate a braak down
/
.
,
in managenent and procedural controls with respect to
maintenance of an effective-Quality Assur nee Program.
.
(Report Details, Paragraph 4)
This violation was identified by the inspectors and had the
,
substantial potential for causing or contributing to an item with safety significance.
"
2.
Infractions
-
~
Contrary to 10 CFR Part 50, Appendix 3, Criterion III,
'
s.
requirements relative to seismic support of electrical
-
-
conduit and cable separation criteria have not been translated into specifications, procedures, and instructions.
(Report Details; Paragraph 3.a)
=
.
..u
,
.
-2',
-
.
.
e
.
.
-..
,
'
.
,
.
.
,
-
- g