SUBJECT:
FERMI POWER PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000341/2025420
Dear Peter Dietrich:
On August 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with Christopher Domingos and other members of your staff. The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.
However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 07, 2025, to December 23, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations December 22, 2025 Signed by Clark, Jefferson on 12/22/25
Enclosure Docket No. 05000341 License No. NPF-43
Enclosure:
As stated
Inspection Report
Docket Number:
05000341
License Number:
Report Number:
Enterprise Identifier:
I-2025-420-0005
Licensee:
DTE Electric Company
Facility:
Fermi Power Plant, Unit 2
Location:
Newport, MI
Inspection Dates:
July 14, 2025, to August 15, 2025
Inspectors:
D. Bradfield, Team Leader, NSIR
N. Egan, Senior Physical Security Inspector, RIII
D. Hostetter, Senior Physical Security Inspector, NSIR
P. Negrete, Physical Security Inspector, NSIR
J. Willis, Senior Physical Security Inspector, NSIR
A. Woyansky, Senior Physical Security Inspector, NSIR
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
- (1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat (DBT) of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126203.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On August 20, 2025, the inspectors presented the security baseline inspection results to Christopher Domingos and other members of the licensee staff
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
C.1 through C.39
Multiple
CR-2025-48878:
07/16/2025
CR-2025-48896
07/17/2025
CR-2025-49295
08/05/2025
Corrective Action
Documents
Fermi Security
FOF Corrective
Action Program
25 NRC Force-on-Force Corrective Action Program -
Handout
25
ATRK 2025-0365
07/17/2025
ATRK 2025-0365-
GA01
07/17/2025
ATRK 2025-0365-
GA02
07/17/2025
ATRK 2025-0365-
GA03
07/17/2025
ATRK 2025-0365-
GA04
07/17/2025
ATRK 2025-0365-
GA05
07/17/2025
ATRK 2025-0365-
GA06
07/17/2025
CR-2025-48878
07/17/2025
CR-2025-48896
07/17/2025
CR-2025-49433
08/12/2025
CR-2025-49434
08/12/2025
CR-2025-49449
08/12/2025
CR-2025-49450
08/12/2025
CR-2025-49470
08/12/2025
CR-2025-49472
08/12/2025
Corrective Action
Documents
Resulting from
Inspection
CR-2025-49474
08/13/2025
Drawings
HO-301-04
Force Continuum
N/A
Miscellaneous
Table of Security Personnel
N/A
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
LP-SE-301-0001
Course 301 - Use of Force and Arrest
N/A
Fermi 2 Physical Security Plan, Security Training and
Qualification Plan, Safeguards Contingency Plan, and
Security and Contingency Plan for Independent Spent Fuel
Storage Facilities
03/09/2023
Fermi 2 General
Administration
Conduct Manual
6.8 Authorization for Use of a Camera Onsite
Revision 52
LP-SE-301-0002
Arrest Authority
Revision 0
SEP-SE1-09
Security Communications
Revision 11
Procedures
SEP-SE1-20
Fermi 2 2023 Protective Strategy
23
Ltr ML25248A011
OFFICE
NSIR/DSO/SPEB
/ETA
R-III/DRS/PSB
NSIR/DPCP/RSB
NSIR/DPCP/RSB
NAME
PNegrete
NEgan
DHostetter
DHostetter
DATE
Sep 8, 2025
Sep 9, 2025
Dec 16, 2025
Dec 18, 2025
OFFICE
NSIR/DSO/SPEB
/ETA
NAME
JClark
DATE
Dec 22, 2025