SUBJECT:

FERMI POWER PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000341/2025420

Dear Peter Dietrich:

On August 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with Christopher Domingos and other members of your staff. The results of this inspection are documented in the enclosed report.

Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.

However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 07, 2025, to December 23, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations December 22, 2025 Signed by Clark, Jefferson on 12/22/25

Enclosure Docket No. 05000341 License No. NPF-43

Enclosure:

As stated

Inspection Report

Docket Number:

05000341

License Number:

NPF-43

Report Number:

05000341/2025420

Enterprise Identifier:

I-2025-420-0005

Licensee:

DTE Electric Company

Facility:

Fermi Power Plant, Unit 2

Location:

Newport, MI

Inspection Dates:

July 14, 2025, to August 15, 2025

Inspectors:

D. Bradfield, Team Leader, NSIR

N. Egan, Senior Physical Security Inspector, RIII

D. Hostetter, Senior Physical Security Inspector, NSIR

P. Negrete, Physical Security Inspector, NSIR

J. Willis, Senior Physical Security Inspector, NSIR

A. Woyansky, Senior Physical Security Inspector, NSIR

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat (DBT) of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126203.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 20, 2025, the inspectors presented the security baseline inspection results to Christopher Domingos and other members of the licensee staff

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C.1 through C.39

Multiple

CR-2025-48878:

07/16/2025

CR-2025-48896

07/17/2025

CR-2025-49295

08/05/2025

Corrective Action

Documents

Fermi Security

FOF Corrective

Action Program

25 NRC Force-on-Force Corrective Action Program -

Handout

25

ATRK 2025-0365

07/17/2025

ATRK 2025-0365-

GA01

07/17/2025

ATRK 2025-0365-

GA02

07/17/2025

ATRK 2025-0365-

GA03

07/17/2025

ATRK 2025-0365-

GA04

07/17/2025

ATRK 2025-0365-

GA05

07/17/2025

ATRK 2025-0365-

GA06

07/17/2025

CR-2025-48878

07/17/2025

CR-2025-48896

07/17/2025

CR-2025-49433

08/12/2025

CR-2025-49434

08/12/2025

CR-2025-49449

08/12/2025

CR-2025-49450

08/12/2025

CR-2025-49470

08/12/2025

CR-2025-49472

08/12/2025

Corrective Action

Documents

Resulting from

Inspection

CR-2025-49474

08/13/2025

Drawings

HO-301-04

Force Continuum

N/A

71130.03

Miscellaneous

Table of Security Personnel

N/A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LP-SE-301-0001

Course 301 - Use of Force and Arrest

N/A

Fermi 2 Physical Security Plan, Security Training and

Qualification Plan, Safeguards Contingency Plan, and

Security and Contingency Plan for Independent Spent Fuel

Storage Facilities

03/09/2023

Fermi 2 General

Administration

Conduct Manual

6.8 Authorization for Use of a Camera Onsite

Revision 52

LP-SE-301-0002

Arrest Authority

Revision 0

SEP-SE1-09

Security Communications

Revision 11

Procedures

SEP-SE1-20

Fermi 2 2023 Protective Strategy

23

Ltr ML25248A011

OFFICE

NSIR/DSO/SPEB

/ETA

R-III/DRS/PSB

NSIR/DPCP/RSB

NSIR/DPCP/RSB

NAME

PNegrete

NEgan

DHostetter

DHostetter

DATE

Sep 8, 2025

Sep 9, 2025

Dec 16, 2025

Dec 18, 2025

OFFICE

NSIR/DSO/SPEB

/ETA

NAME

JClark

DATE

Dec 22, 2025