IR 05000338/1982010

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-338/82-10 & 50-339/82-10 on 820322-26.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementing Procedures & Security Organization.Details Withheld (Ref 10CFR73.21)
ML20054C509
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/13/1982
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054C503 List:
References
50-338-82-10, 50-339-82-10, NUDOCS 8204210219
Download: ML20054C509 (1)


Text

-

-

.

o-UNITED STATES

-

~g

.

NUCLEAR REGULATORY COMMISSION n

c

REGION II

,o 101 MARIETTA ST., N.W., SulTE 3100 Y

ATLAf1TA, GEORGIA 303o3 g*****o APR 151982 Report Nos. 50-388/82-10 and 50-339/82-10 Docket Nos.

50-338, 50-339 License Nos.

NPF-4 and NPF-7 Licensee:

Virginia Electric and Power Company Richmond, VA 23261 Facility Name:

North Anna Power Station, Units 1 and 2 Inspection at:

North Anna Site Near Mineral, VA Inspection conducted:

March 22-26, 1982 Date of Last Physical Security Inspection Visit:

February 8-12, 1982 Type of Inspect n:

nannounced Physical Security Inspector:

}l/ /tJ D h r

/]QM J

/

SS A. T'illman,f ysTcaT 'Sdcurity Inspector Dite Signed

~

~'

Approved by:

_

_

ffl D. R. McGuire, Chief, Physical Security Section ate igned Inspection Summary The inspection included review of Security Plan and Implementing Procedures; Security Organization - Management; Security Organization - Personnel; Security Organization - Response; Security Program Audit; Records and Reports:

Testing and Maintenance; Locks, Keys and Combinations, Physical Barriers -

Protected Areas; Physical Barriers - Vital Areas; Security System Power Supply: Lighting; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protected Areas; Detection Aids - Vital Areas; Alarm Stations; and Communications.

The Region II Security Inspector was accompanied by O. S. Chambers and N. E.

Ervin, Physical Security Specialists, Operating Reactor Program Branch, I.E.,

who actively participated in the inspection.

The inspection involved 102 inspector hours on site by 3 NRC inspectors.

,

Twelve inspection hours were accomplished during offshift periods.

)

Results:

The licensee was found to be in compliance with NRC requirements within the 20 areas examined during the inspection.

Q

. Copies Copy

Of-c ENCLOSURE CONTAINS

/A Pages

'

SAFEGUARDS IN70MATION.

This Docu:::ent is not to be UPON SEPARATION THIS reproduced without specifio PAGE IS DICONTFOLLED.

approval of IE:II l

l 8204210219 920415 PDR ADOCK 05000330

'

O PDR,

'

_

-,,.

. _ _