IR 05000338/1982002
| ML20041E328 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 03/02/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| References | |
| NUDOCS 8203100376 | |
| Download: ML20041E328 (2) | |
Text
.
,
.
.
.
.
"
MAR 0 2 r32
'
o C51y q 9] fAR s k h %
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
-
Nuclear Operations Y
P. O. Box 26666
-
Richmond, VA 23261
%
s to Gentlemen:
Subject: Report Nos. 50-338/82-02 and 50-339/82-02 This refers to the routine safeguards inspection conducted by Mr. A. Tillman of this office on February 8-12, 1982, of activities authorized by NRC License Nos. NPF-4 and NPF-7 at the North Anna Power Station and to the discussions of our findings held with Mr. W. R. Cartwright, Station Manager at the conclusion of the inspection.
Areas examined during this inspection included your physical security program as implemented under the provisions of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials" and the specific requirements of your approved Security Plan.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified enforcement matters.
These are discussed in the enclosed inspection report.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the material, with the exception of the report cover page which is an inspection summary, will not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
" CEAMS
Sincerely
. OZWON.
WARNI:G: rapEGUAIS I?ir0' CATION
SECTION 147 A;c;410 h2 GY ACI 1954*
PAGE IS DECO::IROLLED.
V10LAT10:,3c; m nr.; g ig;;
REUan:aIs cr 10 CFs 7,5.21 F. J. Long, Acting Chief SUBJECT 10 CIVIL UR C2U.:I i AL SA:iCTICNS.
Reactor Projects Branch 1 Division of Project and Resident Programs
.
REVIEEED BY :
David R McGuire h
y Enclosure:
See Page 2 ( NA24E (SIGNAIURE)
$RC-Q)
8203100376 820302 MAR 0 21982 PDR ADOCK 05000338 G
PDR (ORGANIZATIOli)
(DATE)
go[Ml. Virginia Electric and Power Company
M O '2 M
,
-
.
Enclosure:
Inspection Report Nos. 50-338/82-02 and 50-339/82-02 (Safeguards Information)
cc w/ encl:
P. G. Godwin, Director Nuclear Security J. H. Ferguson, Executive Vice President W. R. Cartwright Station Manager
,
bcc w/ encl:
_y Document Management BranclV bcc w/ Inspection Summary Commonwealth of Virginia NRC Resident Inspector a
.
J RI I ().:(--
RII RII'
RII 6~
R ATillman:Ig DMc
.e AGits'n KLan is RCLewis 02/f//82 03 / 2./82 GB/k/82 03 / 1/ /82 03/ M 2 L::CEO.TD.E CO:: TAI:15 SAFE 1UAR33 I:;79:CAII027 UPO!i UEPl>F;ATI01 Tiii5 re.c a : = x:u. m za.
SAFEGUARDS INFORMATiON