IR 05000335/1987024
| ML17221A670 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/19/1988 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8803170090 | |
| Download: ML17221A670 (7) | |
Text
REQULATO INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR: 8803170090 DOC. DATE: 88/02/19 NOTARIZED:
NO FACIL: 50-335 St.
Lucie PlantI Unit iI Florida Power 5 Light Co.
50-389 St.
Lucie Planti Unit 2I Florida Power 8c'ight Co.
AUTH. BLAME AUTHOR AFFILIATION COLLINS'. M.
Region 2I Ofc of the DirectoY REC IP. NAME RECIPIENT AFFILIATION WOODYI C. O.
Fl or i da Power 8. Light Co.
SUBJECT:
Ack receipt of 880111 analytical results of spiked liquid samples as part of NRC Confirmatory Measurements Program.
Comparison of results to known values
~4~ acceptance criteria for c ompar isons enc l for info.
DOCKE'I 0500033 0500038',
DISTRIBUTION CODE:
IEDBD COPIES RECEIVED: LTR i
ENCL J SIZE:
TITLE: Environ 5 Radiological (50 DKT)-Insp Rept/Notice of Violation Respons NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA TOURIQNYI E COPIES LTTR ENCL
0
1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL
1 INTERNAL:
ACRS AEOD/DSP NMSS/SGOB 4E4 NRR/DOEA/EAB11E NRR /DREP /RP B 10A OGC 1 5-B-18 RES RGN2 FILE
RGN4 MURRAYI B EXTERNAL:
LPDR NSIC
2
1
1
1
1
1
1
1
1
1
AEOD/DOA NMSS/LLOB SE4 NRR/DLPG/PEB11B NRR/DREP/EPB10D N
PMAS/ILRB12 EQ, IL
PS DIR RGN2/DRSS/EPRPB NRC PDR
1
1
1
1
1
1
1
1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
Florida Power and Light Company ATTN:
Mr. C. 0.
Woody Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
DOCKET NOS.
50-335 AND 50-389,
'CONFIRMATORY MEASUREMENT RESULTS, SUPPLEMENT TO INSPECTION REPORT NOS. 50-335/87-24 AND 50-389/87-23 As part of the NRC Confirmatory Measurements Program, spiked liquid samples were sent on November 5, 1987, to your St.
Lucie facility for selected radiochemical analyses.
We are in receipt of your analytical results transmitted to us by your letter dated January ll, 1988, and subsequent to verification of your values as per our conversation by telephone on February 12, 1988, the following comparison of your results to the known values are presented in Enclosure 1 for your information,.
The acceptance criteria for the comparisons are listed in Enclosure 2.
In our review of these data all comparative results were in agreement.
These data should be reviewed in greater detail by your cognizant staff members for any significant trends in the data among successive years in which samples have been analyzed by your facility.
These results and any results from previous years pertaining to these analyses will be discussed at future NRC inspections.
I
Sincerely, t.~~~IqAg S1CNED BY Enclosures:
~
Confirmatory Measurement Comparisons 2.
Criteria for Comparing Analytical Measurements Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc w/encls:
K.
N. Harris, Vice President St.
Lucie Nuclear Plant J.
G. Boissy, Plant Manager J.
B. Harper, Site QA Superintendent bcc w/encls:
(See Page 2)
8803170090 8802i9 PDR ADOCK 05000335
Florida Power and Light Company bcc w/encl:
NRC Resident Inspector DRS Technical Assistant State of Florida Document Control Desk RII NGl oersen 2/p/88 RII C
(
gKahle 2/!'7/88 RI JC lenjak 2/
/88
ENCLOSURE'
Confirmatory Heasurement Comparisons of ll-3, Fe-55, and Sr-90 Analyses for St.
Lucio Nuclear Plant, November 5, 1987
~lou Oo l!
Licensee
~uui ml NRC
~uC'l Reso I ut ion Ratio Licensee NRC Com~a r i son H-3 Fe-55 Sr-90 2.0ll E-5 1.60 E-5 2.ll3 E-6 2.28
+ 0.05 E-5 1.39
+ 0.03 E-5 2.82
+ 0. 11 E-6
<16
0. 89 1 ~ 15 0.86 Agreement Agreement Agreement Note:
Oue to the extended decay time for the isotope Sr-89, the analytical results were not compare ENCLOSURE
Criteria for Comparing Analytical Measurements This enclosure provides criteria for comparing results of capability tests and verification measurements.
The criteria are based on an empirical relationship which combines prior experience and the accuracy needs of this program.
In this criteria, the judgement limits denoting agreement or disagreement between licensee and NRC results are variable.
This variability is a function of the NRC's value relative to its associated uncertainty.
As the ratio of the NRC value to its associated uncertainty, referred to in this program as
"Resolution"'ncreases, the range of acceptable differences between the NRC and licensee values should be more restrictive.
Conversely, poorer agreement between NRC and licensee values must be considered acceptable as 'the resolution decreases.
For comparison purposes, a ratio'f the licensee value to the NRC value for each individual nuclide is computed.
This ratio is then evaluated for agreement based on the calculated resolution.
The corresponding resolution and calculated ratios which denote agreement are l.isted in Table 1 below.
Values outside of the agreement ratios for a
selected nuclide are considered in disagreement.
NRC Reference Value for a Particular Nuclide
'esolution
= Associated Uncertainty for the Value Licensee Value
'omparison Ratio =
NRC Reference Value TABLE 1 Confirmatory Measurements Acceptance Criteria Resolutions vs.
Comparison Ratio Resolution
4 -
8-
16-
51 - 200
)200 Comparison Ratio for
~Areemeet 0.4
- 2.5 0.5
- 2.0 0.6
- 1.66 0'5 1.33 0.80 - 1.25 0'5 1.18
DI< RIBUTION-D
~ee Fi e ii/o ericl..
PDaZ Reading w/o encl.
D. Miller w/encl.
E. Tourigny w/encl.
February 12, 1988 DOCKET NO(S). 50-335 and 50-389 Hr. C. 0. Moddy Executive Vice President Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408 SUBJECT:
ST.
LUCIE UNITS
AND 2 The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Sigifi tH*
d C
id i
.d d~f fe
- Exemption, dated Construction Perm &No. CPPR-
, Amendment No.
dated Facility Op rating License No.
, Amendment No.
dated Order-Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated Enclosures:
As stated Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation See next page OFFICE/
SURNAME)
I oAFE f>
LA
~ ~ ~
~ ~
De
/1&88
~ ~ ~ J'o~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ e ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~
~
~ ~ ~ ~
~ ~
NRC FORM 318 110/801 NRCM 0240 OFFICIAL RECORD COPY
A
~ 4 I
e,g
)
~ I