IR 05000335/1987025

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-335/87-25 & 50-389/87-25
ML17221A692
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/11/1988
From: Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8803300023
Download: ML17221A692 (4)


Text

p(

ACCESSION NBR FACIL: 50-335 50-38'P AUTH. NAME LSONs B. *.

ECIP. NAME 4JOODYz C. Q.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

8803300023 DOC. DATE: 88/03/11 NOTARIZED:

NO St.

Lucie Planti Unit ii Florida Power 5 Light Co.

St.

Lucie Planti Unit 2. Florida Power 5 Light Co.

AUTHOR *FFILIATION Region 2i Qfc of the Director RECIPIENT AFFILIATION Florida Power 5 Light Co.

DOCKET 05000335 0500038)

SUBJECT:

Ack receipt of 880219 ltr informing NRC of steps taken to correct violations noted in Insp Repts 50-335/87-25 8<

50-389/87-25.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp R'ept/Notice of Violation Response NOTES:

REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME TOUR IGNYe E COP IES LTTR ENCL INTERNAL:

ACRS DEDRO NRR/DLP6/PEB11B NRR/DQEA DIRi1E NRR/DREP/RPB10A NRR/PMAS/ILRB12 OGC 15-B-18 RES/DRPS DIR ERNAL:

LPDR NSIC AEOD NRR MORISSEAUi D NRR/DLPG/GABiOA NRR/DREP/EPB10D NRR/DRIS DIR9*2 OE LIEBERMAN,J

"

QPEC FIL

1 FILE

NRC PDR

1

1

1'1

0 TOTAL NUMBER QF COPIES REQUIRED:

LTTR

ENCL

~'

Florida Power and Light Company

+I

~

~N:

Mr. C. 0.

Woody Group Vice President Nuclear Energy Department P. 0.

Box 14000 Crystal River, FL 33408 Gentlemen:

MAR 11 1S88 SUBJECT:

NRC INSPECTION REPORT NOS. 50-335/87-25 AND 50-389/87-24 Thank hank you for your response of Februar

1988 d

J

1988, concerning activities conducted at your St. Lucie t

f 10 CFR

'

the implementation of your

's uring uture inspections.

We appreciate your cooperation in this matter.

Sincerely, Qe cc: Jk'. Harris, Vice President St. Lucie Nuclear Plant

. Boissy, Plant Manager

.

B. Harper, Site QA Superintendent bcc:

4RC Resident Inspector DRS Technical Assistant Document Control Room State of Florida MNlslgneg Qy BRUCE A. W(LSON Bruce A

Wilson Chief Reactor Projects Branch

Division of Reactor Projects agQ+3QQQ2+

8 5QQQ335

@Qadi i PDR ADOCV o pDR

RI+

H ristensen:saj 3/)P/88 RIQ RCrlenjak 3/)Q/88