IR 05000335/1987010

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-335/87-10 & 50-389/87-09.Response Meets Requirements of 10CFR2.201
ML17219A688
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/10/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8707170184
Download: ML17219A688 (2)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8707170184 DOC. DATE: 87/07/10 NOTARIZED:

NO FACIL: 50-335 St.

Lucie Plant>

Unit 1> Florida Power

& Light Co.

50-389 St.

Lucie Plant>

Unit 2> Florida Poeer

& Light Co.

AUTH. NAME AUTHOR AFFILIATION EYES> L. A.

Reg ion 2.

Office of Director REC IP. NAME REClPIENT AFFILIATION WOODY> C. O.

Florida Power

& Li,ght Co.

SUBSECT:

Ack receipt of 870623 ltr informing NRC of steps taken to correct violations noted in Insp Repts 50-335/87-10

&

50-389/87-09. Response meets requirements of 10CFR2. 201.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR (

ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET 0 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD lNTERNAL:

AEOD NRR ROE> M. L NRR/DREP/EPB NRR/DRlS DIR OE EBERMAN> J EG FIL FILE

COPIES LTTR ENCL'ECIPIENT ID CODE/NAME TOUR IGNY> E DEDRO NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OQC/HDS2 RES DEPY GI COPIES LTTR ENCL

1

1 ERNAL:

LPDR NSIC NRC PDR TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

Docket Nos.

50-335, 50-389 License Nos.

DPR-67, NPF-16

,Florida Power-and Light Company y'TTN:

Mr.

C. 0.

Moody Group Vice President Nuclear Energy Department P.

0.

Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

REPORT NOS.

50-335/87-10 AND 50-389/87-09 Thank you for your response of June 23, 1987, to our Notice of Violation issued on June 1,

1987, concerning activities conducted at your St.

Lucie facility.

Me have evaluated your response and found that it meets the requirements of

CFR 2.201.

Me will examine the implementation of your corrective actions during future inspections.

Me appreciate your cooperation in this matter.

Sincerely, Luis A. Reyes, Director Division of Reactor Projects cc:

K.

N. Harris, Vice President St.

Lucie Nuclear Plant P

.

G. Boissy, Plant Manager

~

~

~

J'.

B. Harper, Site 0A Superintendent'cc:

NRC Resident Inspector

. Document Control Desk State of Fl'orida RII HChristensen:cdg 07/IIcI/87 SPP7iTPgeo 8>oop>35 g/70720 PDR ADOCK 0 pDR G

~

RII 1 son 07/g/87 RI

~I RIIp BVerrelli

~Brownlee 07/ f /87 07/ g /87-

~ol