IR 05000334/1990080

From kanterella
Jump to navigation Jump to search
Ack Receipt of Discussing Need to Extend Original Commitment Date of 920901 for in-plant Walkdown of EOP Attachments & Associated Satellite Procedures to 930331,per Insp Repts 50-334/90-80 & 50-412/90-80.Delay Acceptable
ML20127F178
Person / Time
Site: Beaver Valley
Issue date: 11/05/1992
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
References
NUDOCS 9211090207
Download: ML20127F178 (2)


Text

e

.OC7

.,

t

.

NOV 51992 Doexet Nos. 50-334 50-412 Mr. J. Vice President Nuclear Group Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077

Dear Mr. Sieber:

SUBJECT: INSPECTION NOS. 50-334/90-80 AND 50-412/90-80 This refers to your letter dated October 22,1992, which discusses the need to extend your original commitment date of September 1,1992, for in-plant walkdown of Emergency Operating Procedure. Attachments and associated satellite procedures to March 31,1993.

Thank you for informing us of the corrective and preventive actions taken to date and of your expected schedule of completion. Based on a previous review of your procedures (July 1991)

and a review of the proposed schedule, we have concluded that your proposed delay will not compromise plant or public safety. We understand that identification of any deficiencies that could pose such a problem will be promptly corrected by issuing an Operating Manual Change Notice to the affected procedure. Final corrective actions will be examined during a future inspection cf your licensed program.

We appreciate your cooperation.

Sincerely, pf4 hen,$<f C f

hw b Uy?h'

Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety OFFICIAL RECORD COPY G: RESP 1192.LEB nnn0MG 9211090207 921105 PDR ADOCK 05000334

-

~ /[@, o

-

i d

/ {/ c I

G PDR v

,

. -.,

-

.-

-

,

-

-

.

- - -

-

.

-

.-

__

'.

.

Mr. }. Sieber

cc:

G.-S. Thomas, Gveral Manager, Corporate Nuclear Services N. R. Tonet, Manager, Nuclear Safety -

T. P. Noonan, General Manager, Nuclear Operations

,

K. D. Grada, Manager, Quality Service Unit H. R. Caldwell, General Superintendent, Nuclear Operations K. Abraham, PAO (2) (w/ copy of letter dtd 10/22/92)

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector (w/ copy of letter dtd 10/22/92)

Commonwealth of Pennsylvania (w/ copy of letter dtd 10/22/92)

-

State of Ohio bec:

Region 1 Docket Room (with concurrences)

DRS/EB SALP Coordinatoi L. Bettenhausen, DRS G. Meyer, DRS L. Briggs, DRS J. Joyner, DRSS R. Blough, DRP J. Rogge, DRP D. Vito, SRI, Oyster Creek F. Young, SRI, Three Mile Island A. DeAgazio, NRR/PD l-4 V. McCree, OEDO DRS File (2)

-

,

RI:DRS RI:DRS RI:DRS

.f[

Bettenhausen Briggs / k/ mg Meyer 11/f/92 11/i/92 11/i/92 OFFICIAL RECORD COPY G: RESP 1192.LEB.

_ _ - _ _ - _ _ _ _ - _ _ - _

_ - _ _

-

r-ta

.

Beaver Va av Power $tahon Shrppmgport. PA 1$077-0004 (412) 39) 5255 JOHN o sitetA October 22, 1992 VC " -- 1ent - Nuclear Group U.

S.

% :) :ar Regulatory Commission Attn *

niment Control Desk Wa sh in.3 con, DC 20555 Subject:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. HPF-73 Combined Inspection Report Nos. 50-334/90-80 and 50-412/90-80 The subject report do7umented findings from an inspection of Emergency Operatin'

Procedures (EOPs)

at Beaver Valley Power Station.

By istter dated July 13, 1990, our response to the inspection report provided a

schedule for EOP satellite procedure walkdowns.

All walkdowns were to be completed by September 1, 1992.

However, approximately 25% of the walkdowns were not completed on the specified schedule.

Approximately one-half of the procedures that were required to be walked down were to be completed in conjunction with the Procedure Upgrade Project (PUP).

Delays in the completion of this project prevented some of these walkdowns from being completed on schedule.

Additional support was necessary for other procedure related projects including station blackout, outage support, and participation with industry working groups.

Presently, 75%

of the required procedure walkdowns have been completed.

The remaining procedure walkdowns will be completed by March 31, 1993.

Attachment

provides a

detailed schedule for completion of EOP walkdowns, Abnormal Operating Proceditre (AOP)

revisions, and future EOP revisions to incorporate Revision 1B of the Emergency Response Guidelines (ERG).

If there are any questions concerning this matter, please contact Charles O'Neill at (412) 393-4935.

Sincerely, Sie /

ber D.

Attachment y- _,, w. L N tSh. - - /

~

.

p

'

,

l q

n cc:

Mr.

L.

W.

Rossbach, Sr.' Resident Inspector s

Str.

T.

T.

Martin, NRC Region I Administrator Mr.

L.

H.

Bettenhausen, Chief Operations Branch, l

Division of Reactor Safety

'

Mr.

A.

W.

De Agazio, Project Manager Mr.

M.

L.

Bowling (VEPCO)

Mr.

L.

E.

Briggs, NRC Region I, Senior Operations Engineer l

..

,

.

.*

DUQUESNE LIGHT COMPANY

.

Nuclear Group Beaver Valley Power Station Units 1 and 2

.

ATTACHMENT 1 EOP Walkdown Comoletion/ Comment Incornoration Schedule 1.

Emergency Operating Procedure (EOP) Satellite Procedures Sixty-nine (69) procedures require a walkdown

In order to maintain the remainder of the upgrade project on schedule, the ECP satellite procedures will be walked down by March 31, 1993

Any identified discrepancies will be resolved (through procedure revision, Operating Manual Change Notice (OMCN) or other resolution) by December 31, 1993 2.

Incorporation of Abnormal Operating Procedure (AOP) Lwalkdown comments (both units)

Completion of Unit 2 AOP walkdowns by December 31, 1992

Review open Operating Manual Deficiency Reports (OMDRs)

Review discrepancies generated during walkdown of AOPs

Draft changes to AOPs

Perform appropriate validation

Incorporate validation comments

,

Perform verification Obtain Onsite Safety Committee (OSC) concurrence

Obtain approval by June 30, 1993

,

Above changes will be coordinated with training to ensure issuance prior to due date (training must be completed prior to issuance)

Issue revised procedures by September 30, 1993

3._

Incorporation of Emergency Response Guideline (ERG) Revision ~1B (Unit 1)

Review ERG changes versus BV-1 EOPs

Review open OMDRs

Review discrepancies generated during Unit 1 walkdown of EOP l

attachments

-, -...,

. -..,.

,. -, -, - - - - - -

-. -. -... -. -..... -.. -.. -

. - -. -- --.-

F

.

'

ATTACHMENT 1 (Continued)

.

,

.

.

3.

(Continued)

Draft changes to EOPs, EOP attachments, EOP background documents and EOP deviation sheets Perform appropriate validation

Incorporate validacion comments

Perform verification

Obtain OSC concurrence Obtain approval by March 31, 1994

_

Above -changes will be coordinated with training to ensure issuance prior to due date (training must be completed prior to issuance)

Issue revised procedures by June 30, 1994

4.

Incorporation of ERG Revision 1B (Unit 2)

Review ERG changes versus BV-2 EOPs

Review open OMDRs

Review discrepancies generated during Unit 2 walkdown of EOP attachments

Draft changes to EOPs, EOP attachments, EOP background documents and EOP deviation sheets Perform appropriate validation

-

Incorporate validation comments

Perform verification

Obtain OSC concurrence Obtain approval by June 30, 1994

Above changes will be coordinated with training to ensure-issuance prior to due date (training must be completed prior to issuance)

Issue revised procedures by September 30, 1994

.