July 22, 2019

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000333/2019501

Dear Ms. Hanson:

On June 27, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your James A. Fitzpatrick Nuclear Power Plant and discussed the results of this inspection with Mr. Joseph Pacher, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

Inspection Report

Docket Number:

05000333

License Number:

DPR-59

Report Number:

05000333/2019501

Enterprise Identifier: I-2019-501-0022

Licensee:

Exelon Generation Company, LLC

Facility:

James A. Fitzpatrick Nuclear Power Plant

Location:

Lycoming, NY

Inspection Dates:

June 24, 2019 to June 28, 2019

Inspectors:

J. Ambrosini, Senior Emergency Preparedness Inspector

E. Burket, Senior Reactor Inspector

J. DeBoer, Senior Project Engineer

T. Dunn, Operations Engineer

D. Silk, Senior Operations Engineer

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a emergency preparedness biennial exercise inspection at James A. Fitzpatrick Nuclear Power Plant in accordance with the Reactor Oversight Process.

The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

The inspectors evaluated the biennial emergency plan exercise. The exercise scenario simulated an inadvertent high pressure coolant injection actuation, a failure of the automatic reactor protection system to shut down the reactor, and a reactor coolant system leak inside primary containment on June 25, 2019.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:

Evaluation 18-90, EP-AA-1014, Exelon Nuclear Radiological Emergency Plan Annex for James A. Fitzpatrick Station, Revision 2

Evaluation 18-45, EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan, Revision 30

This evaluation does not constitute NRC approval.

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on May 23,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

July 1, 2018 - March 31, 2019

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

July 1, 2018 - March 31, 2019

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

July 1, 2018 - March 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 27, 2019, the inspectors presented the emergency preparedness biennial exercise inspection results to Mr. Joseph Pacher, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.01

Corrective Action

Documents

259491,

259498,

259668,

259675,

259713

Miscellaneous

James A.

Fitzpatrick 2019

Emergency

Preparedness

Biennial Exercise

Scenario Package

06/25/2019

Procedures

EP-AA-1000

Exelon Nuclear Standardized Radiological Emergency Plan

Revision 30

EP-AA-1014

Radiological Emergency Plan Annex for James A. Fitzpatrick

Station

Revision 2