IR 05000333/2012302

From kanterella
Jump to navigation Jump to search
IR 05000333-12-302; Entergy Operations; 09/10-28/2012; James A. FitzPatrick Nuclear Power Plant, NRC Examination Report
ML12279A015
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/04/2012
From: Diane Jackson
Operations Branch I
To: Laing D
Entergy Nuclear Northeast
Shared Package
ML120270122 List:
References
50-333/OL-12-302 50-333/OL-12-302
Download: ML12279A015 (9)


Text

UNITED STATES NUCLEAR REGULATORY COi,lMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC EXAMINATION RE PORT 05000333 l 20 1 2302

Dear Mr.

On September 18, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at the James A. FitzPatrick Nuclear Power Plant. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on September 13,2012, with Mr. Timothy Peter, Operations Initial Training Superintendent, and other members of your staff. A telephonic exit meeting was conducted on September 28, 2012 with Mr. Peter, who was provided the NRC licensing decisions.

The examination included the evaluation of five applicants for reactor operator licenses. The license examiners determined that all the applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued.

There were no post examination comments submitted by your staff. The enclosure contains details of this report.

No findings were identified during this examination.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document

D. Laing 2 system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Donald E. J Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59

Enclosure:

NRC Examination Report 05000333/201 2302

REGION IV==

Docket: 50-333 License: DPR-59 Report: 05000333/2012302 Licensee: Entergy Operations Facility: James A. FitzPatrick Nuclear Power Plant 268 Lake Road Location:

Lycoming, NY 13093 Dates: September 10-28,2012 S. Garchow, Chief Examiner, Senior Operations Engineer (RlV)

Inspectors:

C. Steely, Operations Engineer (RlV)

Approved by: Donald E. Jackson, Chief Operations Branch (Rl)

Division of Reactor Safety

SUMMARY OF FINDINGS

ER 0500033312012302; September 10-September 28,2012, J. A. FitzPatrick Nuclear Power

Plant; Initial Operator Licensing Examination Report.

NRC examiners evaluated the competency of five applicants for reactor operator licenses at J. A. FitzPatrick Nuclear Power Plant.

The licensee developed the examinations using NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on September 18,2012. NRC examiners administered the operating tests on September 10-13,2Q12.

The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued'

A. NR0-ldentifiedandSelf-RevealinqFindinqs None B. Licensee-ldentified Violations None.

REPORT DETAILS

4. OTHER ACTIVIflES (OA)

4OA5 Other Activities (lnitial Operator License Examination)

.1 License Applications

a. Scope

NRC examiners reviewed all the license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b. Findinos No findings were identified.

.2 Examination Development

a. Scope

NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.

b. Findinqs NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.

NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.

.3 Ooerator Knowledqe and Performance

a. Scope

On September 18, 2012, the licensee proctored the administration of the written examinations to all five applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 19,2012.

The NRC examination team administered the various portions of the operating tests to afl applicants on September 10-13,2012.

b. Findinqs No findings were identified.

All applicants passed the written examination and all parts of the operating tests. The final written examinations and post examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post examination comments as indicated in the licensee submittal.

The examination team did not note any generic weaknesses associated with applicant performance on the operating tests. Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.

.4 Simulation Facilitv Performance

a. Scope

The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration' b. Findinqs No findings were identified.

.5 Examination Securitv

a. Scope

The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.

Findinqs No findings were identified.

40A6 Meetinqs, lncludinq Exit The chief examiner presented the preliminary examination results to Messr. Timothy Peter, Operations Initial Training Superintendent, and other members of the staff on September 13,2012. A telephonic exit was conducted on September 28,2012, between Mr. Steve Garchow, Chief Examiner, and Mr. Timothy Peter.

The licensee did not identify any information or materials used during the examination as proprietary.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

T. Peter, Operations lnitial Training Superintendent
D. Kelly, Examination Developer
T. Hooper, Examination Developer
P. Ryan, Operations Liaison

NRC Personnel

E. Knutson, Senior Resident Inspector

ADAMS DOCUMENTS REFERENCED