SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NOTIFICATION OF NRC INITIAL LICENSING EXAMINATION O5OOO333/2012302
Dear Mr. Bronson:
f n a telephone conversation on January 25, 2012, between Messrs. Timothy Peter, Operations Training Superintendent, and Stephen Garchow, Chief Examiner, arrangements were made for the administration of licensing examinations at James A. FitzPatrick Nuclear Power Plant during the week of September 10, 2012.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by June 22,2O12. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by July 20, 2012. Pursuant to Title 10, Section 55.40(bX3), of the Code of Federal Regulations (10 CFR) 55.40(bX3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of August 6,2012.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.9., system pressures, temperatures, and levels) generated during the dynamic operating tests untilthe examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov.; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-1 0202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html. Thank you for your cooperation in this matter. Mr. Peter has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at (817) 200-1426, or me at (610) 337-5306.
Operations Branch Division of Reactor Safety 50-333 DPR-59 cc: Distribution via ListServ Thank you for your cooperation in this matter. Mr. Peter has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination f,rocedures and guidelines, please contact Mr. Garchow at (817) 200-1426, or me at (610) 337-5306.
SincerelY,
/RN Donald E. Jackson, Chief Operations Branch Division of Reactor SafetY Docket No.: 50-333 License No.: DPR-59 cc: Distribution via ListServ Distribution w/encl: (VlA E-MAIL)
W. Dean, RA (RIORAMAIL RESOURCE)
D. Lew, DRA (RIORAMAIL RESOURCE)
J. Tappert, DRP (RIDRPMAlL RESOURCE)
J. Clifford, DRP (RIDRPMAlL RESOURCE)
C. Miller, DRS (RIDRSMAlL RESOURCE)
P. Wilson, DRS (RIDRSMAIL RESOURCE)
L. Chang, Rl OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP E. Knutson, DRP, SRI B. Sienel, DRP, Rl K. Kolek, Resident OA RidsNrrPMFitzPatrick Resource RidsNrrDorlLpll -1 Resource ROPreports Resource D. Jackson, Rl DRS S. Garchow, RIV DRS DRS Master Exam File (C. Bixler) (w/concurrences)
SUNSI Review Complete: DEJ (Reviewer's Initials)
ADAMSPKG: ML120270122 -
ADAMSDocumentNo': ML120310565 DOCUMENT NAME: G:\\DRS\\Operations Branch\\Garchow\\Exam 12-FP Sept 12 (U01879)\\l2Ddayexamltr.docx released to the Public.
After this document "An Official itwillbe to OFFICE RI/DRS/OB RI/DRS/OB NAME S. Garchow/via email to DEJ DEJackson
)ATE 01t31112 01131112 OFFICIAL RECORD COPY