IR 05000333/1980013

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-333/80-13 on 800818-22.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Program Audit,Security Organization,Physical Barriers & Access Control.Details Withheld (Ref 10CFR2.790)
ML19339B893
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/15/1980
From: Devlin J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19339B890 List:
References
50-333-80-13, NUDOCS 8011100388
Download: ML19339B893 (1)


Text

--

_

-. -.

-

'

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT O

REGION I

Report No.

50-333/80-13 Docket No.

50-333 License No.

OPR-59 Safeguards Group IV Licensee:

Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Facility Name:. James A. FitzPatrick Nuclear Pcwer Plant Inspection At:

Scriba, New York Inspection Conducted:

August 18-22, 1980 Date of Last Physical Security Inspection Visit:

April 14-25,1980 TypeofInspecdio:

Unan,nounced, Physical Security 9ft

Inspectors:

J-G. C. Smith, Physical Security Inspector

/ cate date

_

(

date Approved by:

.

/

./J.j evlin, Chief, Security and, Investigation

' ' date t

LSection, Safeguards Branch i

~

Insoection Summary:

Routine, Unannounced Insoection, August 18-22, 1980 (Recort No. 50-333/80-13)

-

Areas Insoected:

Security Plan, Security Program Audit; Security Organization; Physical Barriers (Protected Area) (Vital Areas); Lighting; Access Control (Identifi-cation, Authorization and Badging)-(Search); (Escorting); (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Keys, Locks and Combinations; Records

+

and Reports and Review of Actions on Previous Items of Noncompliance. The inspecticn included 28 inspector hours onsite by one NRC regional based inspector. The inspection was initiated during the off-shift; 3 inspection hours were accomplished during off-shift periods.

Results: The licensee was found to be in compliance with NRC requirements in the twenty (20) areas examined; hcwever, there was one (1) unresolved item related to screening.

. Region I. Form 167

(August 1979)

l3g11100 e

.

_ _ _ -

-

-