IR 05000329/1980021
| ML19339C777 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 11/05/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19339C778 | List: |
| References | |
| NUDOCS 8011190445 | |
| Download: ML19339C777 (1) | |
Text
__
l
-
~
.o
.
.
,
h.a?%) L/U l
f&
Ay l'
NOV 5 ~ 1980 l
l
.,
-
- .:
C:.
Docket No. 50-329
$
Docket No. 50-330
'4
- .: -
v
,M[':,
Consumers Power Company
,,
O'
[
ATTN:
Mr. James W. Cook
'
Vice President s
. ;, e
_
Midland Project
J 2:
"
1945 West Parnall Road
?
!
Jackson, MI 49201 Gentlemen:
Thank you for your letter dated October 22, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection heport No. 50-329/80-21; 50-330/80-22 forwarded by our letter dated September 17, 1980. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/ltr dtd 10/22/80:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Che ny, Chicago c(d-l Sutphin Knop Fio elli 11/4/80
'8011190
'H f
-