IR 05000329/1980020
| ML19337A715 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 09/10/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19337A716 | List: |
| References | |
| NUDOCS 8009290472 | |
| Download: ML19337A715 (1) | |
Text
-
)q
'
UNITED STATES NUCLEAR REGULATORY COMMISSION y
,,,
g
"
r REGION lil
%,
[
799 ROOSEVELT ROAD
,
%,
,e
GLEN ELLYN ILLINolS 60137
- ....
TEP 1 0 sao Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackcon, MI 49201 Centlemen:
Thank you for your letter dated August 25, 1980, informing us of the steps you have taken to correct the items cf noncompliance which we brought to your attention in Inspection Reports No. 50-329/80-20 and No. 50-330/80-21 forwarded by our letter dated July 18, 1980.
We will examine these matters during a subsequent inspection to determine if the additional data you located subsequent to our inspection is adequate to withdraw the item of noncompliance. We will inform you of our decision.
Your cooperation with us is appreciated.
Sincerely,
G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/1tr dtd 8/25/80:
Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago 8009e9n 47g