f U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-329/80-02; 50-330/80-02 Docket No. 50-329; 50-330 License No. CPPR-81; CPPR-82 Licensee:
Consumers Power Company 1945 West Parnall Road Jackson, MI 49201 Facility Name: Midland Nuclear Power Plants, Units 1 and 2 Meeting At: Consumers Power Corporate Office, Jackson, MI Meeting Conducted: January 11, 1980 Attendees:
ler 2 7 PO
.
a Ju-8/ E'o G.
iorelli
'
flWW5 Ado gl0'
l/
'
l J. F.'St'eeter
//#//8 0
-
/
/
Kno I
3/
O R. C94dk T. E. Vandel 8/ 8d R. J. C k I
efgh i4./ro y
,
,
nat Jn.~
Approved By:
G. Fiorelli, Chief
/)3'/f'6 Reactor Construction and
'
Engineering Support Branch 8008200 Y$
.
.
Meeting Summary Meeting on January 11, 1980 (Report No. 50-329/80-02; 50-330/80-02 Meeting Subject: Second Corporate Management Meeting to discuss construction matters requiring resolution before issuance of an operating license; to discuss the NRC inspection program as it relates to the Pre-operational and Power Ascension Programs; and to obtain an understanding of the licensee's program for staffing, startup and operation of the Midland facility.
Results: Documented under meeting details.
-2-
.
-
.
. -.. _. -.
.
(
DETAILS Meeting Attendees Consumer Power Company S. H. Howell, Senior Vice President G. S. Keeley, Project Engineer B. Marguglio, Director, Quality Assurance J.. J. Zabritski, Project Licensing Engineer D. B. Miller, Site Manager R. W. Montross, General Manager, Midland R. B. DeWitt, Vice President, Nuclear Operations F. W. Buckman, Director, Nuclear Activities R. B. Cherba, Director, QA, Nuclear Operations G. B. Slode, Operation and Maintenance Superintendent NRC J. G. Keppler, Director, Region III R. F. Heishman, Chief, Reactor Operations and hoclear Support Branch G. Fiorelli, Chief, Reactor Construction and Engineering Support Branch J. F. Streeter, Section Chief, RO&NS Branch R. C. Knop, Section Chief, RC&ES Branch R. J. Cook, Resident Inspector E. R. Swanson, Reactor Inspector T. E. Vandel, Project Inspector D. Hood, Licensing Project Manager, NRR Meeting Details This meeting was conducted to introduce the licensee to the NRC inspection program as it relates to the Pre-operational and Power Ascension Program, to discuss construction matters requiring resolution before issuance of an operating license, and to obtain an understanding of the licensee's program for staffing, startup and operation of the Midland facility.
The following specific items were discussed:
1.
NRC personnel discussed the change in emphasis of the NRC inspection program including the schedule for placing Operations Branch resident inspectors at the Midland site and the interfacing between the Operations and Construction Branches.
NRC personnel also discussed the objective of the NRC inspection program during the pre-operational and startup testing phases and discussed inspection activities described in Appendix B of Regulatory Guide 1.68.
-3-
'i,
o 2.
Licensee personnel made, presentation concerning the program for staffing to support the Preoperational and Power Ascension Program; interfaces between organizations; organization structures; and the method of reviewing and approving of test procedures and test results. The licensee's presentation included information which indicated the licensee has fully recognized the applicability of quality :ssurance requirements for the pre-operational and startup testing and operational phases, 3.
NRC personnel mele a presentation of construction items that required resolution prior to fuel loading. It included the following:
Brief discussion of the Midland regulatory history.
i a.
b.
Hardware concerns relative to qualification of equipment, l
source inspection in lieu of receipt inspection, remedial soils
'
work, electrical inspection, and reactor vessel anchor bolt breakage.
Observations on the Midland trending, NCR, and overview programs.
c.
d.
Discussion of timeliness of QC inspections.
4.
The Regional Director concluded the meeting with comments on the need to place additional emphasis on ensuring that the construction and testing of the Midland site is completed in accordance with regulatory requirements before the NRC can make a positive finding for approval of an operating license.