IR 05000313/1981032
| ML20041B222 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/23/1982 |
| From: | Caldwell R, Joseph Kelly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20041B220 | List: |
| References | |
| 50-313-82-32, 50-368-82-31, NUDOCS 8202230401 | |
| Download: ML20041B222 (1) | |
Text
.
-
.
.
- ...
U. S. Nuclear Regulatory Commission Region IV Report:
50-313/81-32-Licenses: DPR-51 50-368/81-31 NPF-6 Licensee: Arkansas Power and. Light Company Russellville Arkansas
'
s
-
,,.
Facility Name:._ Arkansas Nucl' ear One.._
'
Units l'and 2
Inspection At:
Russ~ellville, AR
"
-
+~
w. w. -
_ ; 7,
,
Inspeck,ionConducted:. No,vemberg -6, 1981
_
DateofLast'.Ph'ysicalS'ecurityInspection: August 17-21, 1981 Type of Inspestion: 'Unanndunced Physical' Security Inspection t-Inspector:
. N.
M a//9/2 /
R.'A. Caldwell Date '
Physical Security / Investigation Specialist-Approved by:
1.u/O n '.h.1 MN B[
J IA. F. Kelly, Chief O
Date P
al Security Section Inspection Summary.
Areas Inspected:
Included a review of the Security Organization-Personnel; Security Organizati6n - Contingency Response; Lighting; Access Control -
Personnel; Physical Barriers - Protected Area; Physical Barriers - Vital Area; Assessment Aids'; Alarm Stations.
The inspection involved 42 inspector-hours by one NRC inspector
'
.incidding 14 inspection hours accomplished during off-shift periods.
-
The inspection began during the regular shift.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.
.
8202230401 820111 PDR ADOCK 05000313 x
(F)