IR 05000309/1981025
| ML20039A286 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 11/30/1981 |
| From: | Gallo R, Lazarus W, Swetland P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20039A265 | List: |
| References | |
| 50-309-81-25, NUDOCS 8112160455 | |
| Download: ML20039A286 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
..
-
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT'
Region I Report No. 50-309/81-25 Docket No. 50-309 License No. DPR-36 Priority
--
Category C
Licensee:
Maine Yankee Atomic Power Company 1671 Worcester Road Framingham, Massachusetts 01701 Facility Name:
Maine Yankee Nuclear Power-Station Meeting At:
Wiscasset, Maine Meeting Conducted: October 14, 1981 NRC Personnel:
awe
// 3d
/
W. K-t&zanus), Project Inspector date signed h
% era r vhv'
//
d f/
P.~~ D.(_.S6et.]jpid, Resident Insgictor date signed date signed Approved By:
2w
//
0 7/
c n R. M. Gallo, Chief, Reactor Projects Section dat'e signed 1A, DRPI Meeting Summary:
Meeting on October 14,1981 (Report No. 50-309/81-25)
Scope: Special, announced management meeting to discuss the results of the
= Region I board convened to evaluate the licensee's performance from July 1, 1980 to June 30, 1981, as part of the NRC's SALP program. Areas addressed
. included:
Plant Operations; Refueling Operations; Maintenance; Surveillance and Inservice ~ Testing; Personnel Training and Plant Procedures; Fire Protection and Housekeeping; Design Changes and Modifications; Radiation Protection, Radioactive Waste Management, and Transportation; Environmental Protection; Emergency Preparedness; Security an.d Safeguards; Audits, Reviews, and Committee Activities; Administration, QA and Records, Corrective Actions and Reporting.
Results: A summary of the licensee performance evaluation was presented.
At1216O $'
C-
t:
,
Jy:
-
DETAILS 1.
Licensee Attendees Mr. -J. Randazza, Vice President-Manager of Operations Mr. J.' Garrity, Director Nuclear Engineering and Licensing Mr. E. Wood, Plant Manager Mr. R. Lawton, Director Operational Quality Assurance Mr. A. Rivers, Director of Operational Support'
2.
NRC Attendees:
Mr. R. Haynes, Regional Administrator, RI
~
Mr. R. Starostecki, Director, DRPI
' Mr. P. ' Swetland, Resident Inspector Mr.'R. Gallo, Chief, Reactor Projects Section No. IA, DRPI i
Mr. W. Lazarus, Acting Senior Resident Inspector Mr. G. Requa, Project Manager, NRR 3.
Discussion i
A brief summary of the Systematic Appraisal of Licensee Performance (SALP) Program was preseated to explain the basis and purpose of the evaluation.
The NRC Region I' evaluation board meeting was discussed, including the appraisal period, performance data and the results of the board's evaluation.
The SALP Cycle 2 evaluation report will be issued and distributed
- ubsequent to NRC management's approval of SALP-program changes which implement the Commission's guidance of October 20, 1981. This guidance is documented in NRC report NUREG-0834, "imC Licensee Assessments."