IR 05000309/1981022

From kanterella
Jump to navigation Jump to search
IE Mgt Meeting Rept 50-309/81-22 on 810902.Major Areas Inspected:Ie Insp Rept 50-309/81-20 Which Identified That Facility Was Operated on 810719 W/O Satisfying Tech Spec Limiting Condition for Operation for Containment Integrity
ML20011A356
Person / Time
Site: Maine Yankee
Issue date: 09/15/1981
From: Gallo R, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20011A352 List:
References
50-309-81-22, NUDOCS 8110090349
Download: ML20011A356 (2)


Text

-.

_

_ _ _ _ _ _ - _ _ _ -

-

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.

50-309/81-22 Docket No.

'50-309

-

.

Licerise No.

DRP-36 Priority Category C

--

Licensee:

Maine Yankee Atomic Power Comoany 1671 Worcester Road

.

Framingham, Massachusetts 01701 Facility Name:

Maine Yankee Nuclear Power Station Meeting at:

USNRC, Region I, King of Prussia, Pennsylvania

Meeting conducted:

September 2,1981 NRC Personnel: _

ca4/

9 /[f[

1. @ za Acting Senior Resident Inspector date signed date signed

-

_ s j

g date signed

,

Approved by:

J

[- d' U

[ R. M. Gallo, Chief, Reac' tor Projects date signed Section lA Meeting Summary:

Enforcement Conference on Sentember 2,1981 (Recort_ No. 50-309/81-22)

Summary: Snecial enforcement conference convened by NRC Reaion I to discuss NRC concerns regardinq a recent insnection (50-309/81-20) which identified that the facility was operated on July 19, 1981 without satisfyina the Technical Specification Limiting Condition for Oneration for containment integrity.

Senior licensee and NRC Region I management attended the meetina in the Reqion I office.

The meeting was of two hours duration.

&

Region I Form 12-1

-

(Rev. August 77)

8110090349 810922 PDR ADOCK 05000309 G

PDR

_ _ _ _ _ _ _ _ _ _ _

._

_-

_

-

.#

g.

i

1.

Attendees.

Maine Yankee Atomic Power Company

!

'J. H. Randazza,'Vice Presiden't-Manager of Operations-E. C. Wood, Plant Manager

,

C. D. Frizzle, Manager, Nuclear Support

'

R. Arsenault', Operations Department Head f-U.S.' Nuclear Regulatory Commission R. C.'Haynes, Director,' Region I

J. M. Allan, Deputy Director i

R. R. Keimig, Chief, Projects Branch No. 2, DRPI R. M. Gallo, Chief, Projects Section lA i

W. J. Lazarus, Acting Senior Resident Inspector, Maine Yankee l

P. D. Swetland, Resident Inspector, Maine Yankee

!

H. W. Crocker, Chief, FFPS, DRPI l

G. Barber, Enforcement Specialist, IE Headquarters l

2.

Discussion and Results

NRC.hgion I management opened the meeting by reviewing the chronology of events and summarizing their concerns regarding the operation of the facility on July 19, 1981, without meeting the Limiting Condition for Operation for Containment Integrity established in Technical Specifications.

(An automatic containment isolation valve was open and inoperable and a non-automatic containment isolation valve was open

with the reactor at 2 percent power and coolant temperature at 540 F.)

i The licensee attributed this incident to errors in interpreting the l

requirements of the Technical Specifications and to an alleged lack of l

clarity of the containment integrity Limiting Condition for Operation.

l The licensee stated that he would complete the following at.tions:

i.

l Review the current Technical Specifications and forward a proposed

--

change to the Office of Nuclear Reactor Regulation by November 15, f

1981 for those areas identified as potentially unclear or confusing to the plant operators.

!

--

Publish Philosophy.of Operations by September 22, 1981, to clarify

,

operators' responsibilities in compliance with Technical Specifi-

,

I cations, and actions necessary when compliance is not possible.

Region I h,anagement acknowledged and commented on the licensee's pro-posed corrective actions.